Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es lié à rien
logo-home
ALL CAPM Practice Exam (32 Sets) Questions with Verified Answers,100% CORRECT €33,56   Ajouter au panier

Pack

ALL CAPM Practice Exam (32 Sets) Questions with Verified Answers,100% CORRECT

PMBOK 6 CAPM Practice 53 Questions with Verified Answers,CAPM Practice Exam 150 Questions with Verified Answers,CAPM Practice Exam 55 Question with Verified Answers,CAPM Practice Test 31 Questions with Verified Answers,CAPM EXAM PREP 97 Questions with Verified Answers,CAPM PRACTICE Exam 89 QUESTION...

[Montrer plus]
32 éléments

PMBOK 6 CAPM Practice 53 Questions with Verified Answers,100% CORRECT

(0)
€10,39

PMBOK 6 CAPM Practice 53 Questions with Verified Answers A project is said to be temporary because: A. it has a short duration B. it has a definite beginning and end C. it has the potential to be a continuous and ongoing effort D. its project team outlives it. - CORRECT ANSWER B. it has a def...

Voir l'exemple

CAPM Practice Exam 150 Questions with Verified Answers,100% CORRECT

(0)
€11,34

CAPM Practice Exam 150 Questions with Verified Answers 1. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called: - CORRECT ANSWER Management by Objectives 2. During the ful...

Voir l'exemple

CAPM Practice Exam 55 Question with Verified Answers,100% CORRECT

(0)
€10,39

CAPM Practice Exam 55 Question with Verified Answers Management by Objectives - CORRECT ANSWER 1. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called: The bulk of the pro...

Voir l'exemple

CAPM Practice Test 31 Questions with Verified Answers,100% CORRECT

(0)
€10,39

CAPM Practice Test 31 Questions with Verified Answers What is OPM3 - CORRECT ANSWER A PMI model designed to help organizations determine their level of maturity in project management (Organizational Project Management Maturity Model) Management by Obectives - CORRECT ANSWER process of establis...

Voir l'exemple

CAPM EXAM PREP 97 Questions with Verified Answers,100% CORRECT

(0)
€10,87

CAPM EXAM PREP 97 Questions with Verified Answers Initiation Process - CORRECT ANSWER Obtain authorization to start a new project or phase on an existing project Planning Process - CORRECT ANSWER Establish the scope of the project, refine the objectives and define the course of action required...

Voir l'exemple

CAPM Practice Exam 436 Questions with Verified Answers,100% CORRECT

(0)
€12,76

CAPM Practice Exam 436 Questions with Verified Answers Events that cannot occur together in a single trial are known as : - CORRECT ANSWER Mutually Exclusive A project that is experiencing constant Communication Blockers is most likely to - CORRECT ANSWER Have conflict occur A project manag...

Voir l'exemple

19 -CAPM Final Practice Exam 150 Questions with Verified Answers,100% CORRECT

(0)
€11,34

19 -CAPM Final Practice Exam 150 Questions with Verified Answers The processes required to define the scope of the project, refine the objectives, and determine the appropriate course of action to achieve the project objectives. A. Executing process group B. Monitoring and controlling proce...

Voir l'exemple

CAPM Exam Prep, PMI, PMBOK 6th Edition 1297 Questions with Verified Answers,100% CORRECT

(0)
€15,59

CAPM Exam Prep, PMI, PMBOK 6th Edition 1297 Questions with Verified Answers 360-degree appraisal - CORRECT ANSWER A performance review completed by a person's peers, manager, and subordinates. It's called a 360-degree appraisal as it's a circle of reviews by people at different levels of an or...

Voir l'exemple

CAPM PRACTICE Exam 89 QUESTIONS with Verified Answers,100% CORRECT

(0)
€10,87

CAPM PRACTICE Exam 89 QUESTIONS with Verified Answers For which of the following project management knowledge areas, accountability cannot be delegated by the project manager to someone else? A. Integration Management B. Schedule Management C. Cost Management D. Scope Management - CORRECT A...

Voir l'exemple

CAPM Practice Exam 163 Questions with Verified Answers,100% CORRECT

(0)
€11,34

CAPM Practice Exam 163 Questions with Verified Answers How many project management processes belong to the Planning Process Group? - CORRECT ANSWER 24 Who should be included in a project schedule development meeting? - CORRECT ANSWER Team members, sponsors, selected stakeholders, and those wit...

Voir l'exemple

CAPM Practice Exam 265 Questions with Verified Answers,100% CORRECT

(0)
€12,28

CAPM Practice Exam 265 Questions with Verified Answers Which of the following is the process of monitoring the status of the project to update the project schedule and manage changes to the schedule? - CORRECT ANSWER Control schedule Risk transference nearly often involves: - CORRECT ANSWER Pa...

Voir l'exemple

CAPM Practice Exam 430 Questions with Verified Answers,100% CORRECT

(0)
€12,57

CAPM Practice Exam 430 Questions with Verified Answers D. Throughout the project lifecycle - CORRECT ANSWER When should Project Risk Management be conducted? A. Project Planning B. Monitoring and Controlling C. Quality Planning D. Throughout the project lifecycle B. procurement strategy ...

Voir l'exemple

CAPM 7th Edition Practice Exam 22 Questions with Verified Answers,100% CORRECT

(0)
€10,30

CAPM 7th Edition Practice Exam 22 Questions with Verified Answers The issues you are facing on your project could have been predicted if a formal risk management process was used. Which document would have been most useful to you along the entire risk management process, from identifying risks to...

Voir l'exemple

CAPM PRACTICE EXAM 2|256 Questions with Verified Answers,100% CORRECT

(0)
€12,28

CAPM PRACTICE EXAM 2|256 Questions with Verified Answers The experiences of an organization's members are the basis for its _________. A. culture B. structure C. operations D. maturity - CORRECT ANSWER The experiences of an organization's members are the basis for its _________. ...

Voir l'exemple

CAPM Exam study guide 45 Questions with Verified Answers,100% CORRECT

(0)
€10,39

CAPM Exam study guide 45 Questions with Verified Answers Acquire Project Team - CORRECT ANSWER <Process>. The process of confirming human resource availability and obtaining the team necessary to complete project assignments. Administer Procurements - CORRECT ANSWER <Process>. The ...

Voir l'exemple

CAPM PRACTICE EXAM 3|197 Questions with Verified Answers,100% CORRECT

(0)
€11,34

CAPM PRACTICE EXAM 3|197 Questions with Verified Answers "QUESTION NO: 1 Power, urgency and legitimacy are attributes of which stakeholder classification model? salience influence/impact power/interest power/influence - CORRECT ANSWER Power, urgency and legitimacy are attributes of which ...

Voir l'exemple

CAPM Practice Test 100 Questions with Verified Answers,100% CORRECT

(0)
€10,96

CAPM Practice Test 100 Questions with Verified Answers When is the Plan Risk Management process performed in a project? - CORRECT ANSWER Once or at predefined points in a project. Understanding, evaluating, defining, and managing requirements are essential to satisfying: - CORRECT ANSWER Custo...

Voir l'exemple

CAPM Practice Exam 151 Questions with Verified Answers,100% CORRECT

(0)
€11,34

CAPM Practice Exam 151 Questions with Verified Answers What includes the reasons for project initiation, objectives and a decision on the project? - CORRECT ANSWER Business Case Crashing - CORRECT ANSWER A technique used to shorten the schedule duration for the least incremental cost by adding...

Voir l'exemple

CAPM Practice Exam 2 - 4900 MGMT 51 Questions with Verified Answers,100% CORRECT

(0)
€10,39

CAPM Practice Exam 2 - 4900 MGMT 51 Questions with Verified Answers Which process is used to implement approved change requests: - CORRECT ANSWER Monitor and Control Project Work Project roles and responsibilities are often documented in a RACI matrix. RACI is an acronym for: - CORRECT ANSWER ...

Voir l'exemple

CAPM Exam Ch 1|20 Questions with Verified Answers,100% CORRECT

(0)
€9,45

CAPM Exam Ch 1|20 Questions with Verified Answers Guide to project management body of knowledge PMBOK - CORRECT ANSWER The PMI publication that defines widely accepted project management practices. The CAPM and the PMP are based on the book Application areas - CORRECT ANSWER the areas of exper...

Voir l'exemple

CAPM Exam 1|100 Questions with Verified Answers,100% CORRECT

(0)
€10,87

CAPM Exam 1|100 Questions with Verified Answers You are a project manager for your company and are helping management choose a project. You've been presented with the following information: Project 1 has a net present value of $25,000 and will take five years to complete. Project 2 has a net pre...

Voir l'exemple

CAPM Exam 196 Questions with Verified Answers,100% CORRECT

(0)
€12,28

CAPM Exam 196 Questions with Verified Answers Cost Variance formula - CORRECT ANSWER Earned Value (EV) - Actual Cost (AC) What are the 6 constraints? - CORRECT ANSWER Scope, Risk, Resources, Quality, Schedule, Budget Initiating (Process Group) - CORRECT ANSWER Processes performed to define ...

Voir l'exemple

CAPM Certification: Ultimate CAPM Exam Prep 39 Questions with Verified Answers,100%CORRECT

(0)
€10,39

CAPM Certification: Ultimate CAPM Exam Prep 39 Questions with Verified Answers What are the 2 main characteristics of a project? - CORRECT ANSWER 1. Temporary; has a beginning and an end 2. Creates something unique i.e product, servic, or result - Ex: Constructing a building, creating a website...

Voir l'exemple

CAPM Practice 215 Questions with Verified Answers,100% CORRECT

(0)
€12,28

CAPM Practice 215 Questions with Verified Answers John is a project manager for a newly formed project team. The project team has worked hard for last 4 months and has taken very few leaves. John wants to motivate the team members by informing them that he can give a couple of paid leaves if they...

Voir l'exemple

CAPM Practice 172 Questions with Verified Answers,100% CORRECT

(0)
€12,28

CAPM Practice 172 Questions with Verified Answers Which of the following is a tool or technique used in the monitor communications process? - CORRECT ANSWER interpersonal and team skills what is the definition of work package? - CORRECT ANSWER the work defined at the lowest level of the work b...

Voir l'exemple

CAPM Practice Test One 50 Questions with Verified Answers,100% CORRECT

(0)
€10,39

CAPM Practice Test One 50 Questions with Verified Answers There are three tools and techniques for the direct and manage project work process. One tool and technique will be meetings. What are the other two tools and techniques for directing and managing the project work? - CORRECT ANSWER Expert ...

Voir l'exemple

CAPM Practice Test Hard 77 Questions with Verified Answers,100% CORRECT

(0)
€10,77

CAPM Practice Test Hard 77 Questions with Verified Answers The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called: - CORRECT ANSWER management by objectives During the full ...

Voir l'exemple

CAPM Practice Exam 260 Questions with Verified Answers,100% CORRECT

(0)
€12,76

CAPM Practice Exam 260 Questions with Verified Answers 3 things that describe role of a PM ?? - CORRECT ANSWER 1. responsible for the final result of the team 2. need to integrate multiple disciplines 3. communicate with team Cost Management Plan has these 3 characteristics - CORRECT ANSW...

Voir l'exemple

CAPM EXAM TERMS 100 Questions with Verified Answers,100% CORRECT

(0)
€10,87

CAPM EXAM TERMS 100 Questions with Verified Answers Project - CORRECT ANSWER is a temporary endeavor undertaken to create a unique product, service or result. Definite beginning and an end. Project Management - CORRECT ANSWER is the application of knowledge, skills, tools and techniques to pro...

Voir l'exemple

CAPM Exam Prep 41 Questions with Verified Answers,100% CORRECT

(0)
€10,39

CAPM Exam Prep 41Questions with Verified Answers Develop Project Charter - CORRECT ANSWER Inputs: Project statement of work, business case, contract, enterprise environment factors, organizational process assets Outputs: Project Charter Identify Stakeholders - CORRECT ANSWER Inputs: Project C...

Voir l'exemple

CAPM Practice Test Series 4|25 Questions with Verified Answers,100% CORRECT

(0)
€9,45

CAPM Practice Test Series 4|25 Questions with Verified Answers One of the team members informed that optimistic estimate for an activity assigned to him will be 10 days and the pessimistic estimate will be 18 days. What is the realistic estimate? - CORRECT ANSWER Not known In a road constructi...

Voir l'exemple

CAPM Practice Test Series 5|25 Questions with Verified Answers,100% CORRECT

(0)
€9,92

CAPM Practice Test Series 5|25 Questions with Verified Answers Whose job is to resolve the competing interests and goals between parties of a project? - CORRECT ANSWER Project Manager Of the following, who is responsible for providing the funding of the project? - CORRECT ANSWER Sponsor A w...

Voir l'exemple
Tout afficher
avatar-seller

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur paulhans. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour €33,56. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

99595 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
€359,24 €33,56
  • (0)
  Ajouter