Examen
PJM Generation Operation Exam Question and answers already passed 2025/2026
-
---9septiembre 20252025/2026A+
- PJM Generation Operation Exam Question and answers already passed 2025/2026 
 
Control center facilities must have a minimum of how many days of fuel for the backup generator? - correct answer 5 days 
 
If PJM ACE shows overgeneration, actual imports are: - correct answer Less than scheduled 
 
Who should a generator contact at PJM to clear an outage ticket? - correct answer Master Coordinator 
 
To correct for a slow or fast clock, system frequency schedules are offset by: - correct answ...
-
$17.49 Más información
Academia199
-
Examen
PJM GENERATION OPERATION EXAM 2025 QUESTIONS AND ANSWERS
-
---7abril 20252024/2025A+
- PJM GENERATION OPERATION EXAM 2025 QUESTIONS 
AND ANSWERS 
Control center facilities must have a minimum of how many days of fuel for the backup generator? - 
CORRECT ANSWER5 days
-
$11.49 Más información
STANGRADES
-
Examen
PJM Generation Operation Exam Questions & 100% Correct Answers- Latest Test | Graded A+ | Passed
-
--14septiembre 20242024/2025A+Disponible en un paquete
- Control center facilities must have a minimum of how many days of fuel for the backup 
generator? 
 -:- 5 days 
If PJM ACE shows overgeneration, actual imports are: 
 -:- Less than scheduled 
Who should a generator contact at PJM to clear an outage ticket? 
 -:- Master Coordinator 
To correct for a slow or fast clock, system frequency schedules are offset by: 
 -:- +/-.02 Hz 
What frequency would PJM set to correct for fast-time error? 
 -:- 59.98Hz 
What frequency would PJM set to correct for ...
-
$10.49 Más información
Guru01
-
Examen
PJM Generator Exam Questions & 100% Correct Answers- Latest Test | Graded A+ | Passed
-
--12septiembre 20242024/2025A+Disponible en un paquete
- The purpose of the Deploy All Resources Action is to instruct all generating resources to be 
on line and at full output _________ 
 -:- immediately upon receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation 
Operators should: 
 -:- Ensure all unit voltage regulators are in service 
PJM can issue the Deploy All Resources Action for________ 
 -:- the entire RTO, specific Control Zones or a subset of a Control Zone if 
transmission li...
-
$10.99 Más información
Guru01
-
Examen
PJM Generation Operation Exam Questions And Answer | 2024 Study Solutions
-
---6abril 20242023/2024A+
- PJM Generation Operation Exam Questions And Answer | 2024 Study Solutions 
 
PJM Generation Operation Exam Questions And Answer | 2024 Study Solutions
-
$11.49 Más información
Labtech