• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 17 páginas
Examen

Fac-C Practice Exam|Questions And 100% Correct Well Detailed Answers|Latest Update !!!!!!2025/2026|Guaranteed Pass|Graded A+

Document preview thumbnail
Vista previa 3 fuera de 17 páginas

FAC-C PRACTICE EXAM|QUESTIONS AND 100% CORRECT WELL DETAILED ANSWERS|LATEST UPDATE !!!!!!2025/2026|GUARANTEED PASS|GRADED A+

Vista previa del contenido

Market research is conducted during which phase of acquisition? - ANSWER All phases
of the acquisition



What is the use of a procedure that is inconsistent with the FAR? - ANSWER Deviation



Simplified Acquisition Procedures (SAP) should: - ANSWER Promote competition to the
maximum extent practicable



What is the tool (form) used by DoD to apply a structured profit/fee? - ANSWER DD
Form 1547, Weighted Guidelines Method



What type(s) of contracts can be awarded when acquiring commercial items of supply? -
ANSWER Only firm-fixed-price contracts or fixed-price contracts with economic price
adjustment



When using invitations for bids (IFBs), what type(s) of contracts can be awarded? -
ANSWER Only firm-fixed-price contracts or fixed-price contracts with economic price
adjustment



Which of the following is correct regarding the DFARS Procedures Guidance and Information
(PGI)? - ANSWER The DFARS PGI is a companion resource to the DFARS



Which of the following statements is accurate regarding the Government's policy on contract
modifications? - ANSWER Only contracting officers acting within the scope of their
authority are authorized to execute contract modifications on behalf of the Government



1

,Only contracting officers acting within the scope of their authority are authorized to execute
contract modifications on behalf of the Government - ANSWER Are only signed by a
Government contracting officer, not the contractor



Except when authorized otherwise, a Government contract: - ANSWER Must be in
writing



Which is NOT a type of contracting officer? - ANSWER Executive contracting officer



With respect to the requirements of law, executive orders, regulations, and all other
applicable procedures, prior to signing a contract, a contracting officer must -
ANSWER Ensure that each has been met



Joan stated that she was working on selecting solicitation provisions. With this in mind, you
know the contract: - ANSWER Has not been awarded



A program manager asked John whether a contract clause is only used in the contract or if it
applies to the solicitation as well. John correctly answered by replying with which of the
following statements? - ANSWER A contract clause is a term or condition used in
contracts, or in both solicitations and contracts, that applies after contract award or both
before and after award



A contractor failed to deliver a commercial item within the time specified by the contract. As
the Government contracting officer, you plan to terminate the contract. What type of
termination would you proceed with? - ANSWER Termination for Cause



Which FAR part sets forth the basic policies and general information about the Federal
Acquisition Regulations System? - ANSWER FAR part 1



Which of the following statements best conveys the convention at FAR 1.108(b), delegation
of authority? - ANSWER Each authority is delegable unless specifically stated
otherwise

2

, How many parts are there in the FAR? - ANSWER 53



What is a Procurement Instrument Identifier (PIID)? - ANSWER A unique number
identifying each solicitation, contract, agreement, or order and related procurement
instrument



The DoD Procurement Instrument Identifier (PIID) is 13 positions long. Position 9 identifies
the type of instrument. If position 9 is a "D", which of the following types of instruments is
representative? - ANSWER Indefinite-delivery contracts to include IDIQs and
requirements contracts



You are reviewing a contract that utilizes the uniform contract format. In Section J you see an
exhibit. How will the exhibit be displayed? - ANSWER With one or two alpha
characters (e.g., Exhibit AA)



Your customer comes to you anticipating a new requirement, one that has not been
purchased recently. You'd like to refer them to the FAR part dealing specifically with market
research. Which FAR part do you refer them to? - ANSWER FAR part 10



Of the following types of contracts, which shall not be used in Government contracting? -
ANSWER Cost-plus-a-percentage-of-cost



When can a time-and-materials (T&M) contract be used? - ANSWER A T&M contract
may be used only when it is not possible at the time of placing the contract to estimate
accurately the extent or duration of the work or to anticipate costs



What underlying principle should the contracting officer follow to avoid organizational
conflicts of interest? - ANSWER Prevent unfair competitive advantage




3

Información del documento

Subido en
21 de diciembre de 2025
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.19

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
THESTUDYVAULT
3.4
(20)
Vendido
167
Seguidores
6
Artículos
14631
Última venta
4 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes