BCT 353 EXAM 2 STUDY GUIDE
Design Phases (in order) - Answer -1: Programming
2: Schematic Design
3: Design Development
4: contract documents
programming phase - Answer -- establish building population and functions
- choose building site
- select systems and materials
- define budget and timeframe for construction
Schematic design phase - Answer -- site and location, alternative design schemes
- architects: compare the alternative design options
Design development phase - Answer -Delivery of the design development
- Architectual, structural, mechanical and electrical systems, refined floor plan, elevation
plans and section plans, outline specifications
Responsibilities
architect: selecting all major systems and components
CM: evaluating the cost and schedule and conduct value engineering
Contract documents phase - Answer -complete a set of well-defined working drawing
and technical specifications
considerations: scope, budget
Bid phase components - Answer -bid packages
bid invitation
bid period
contractor selection
construct phase components - Answer -project authorization
construction
turnover
owner acceptance
steps for hiring construction manager - Answer -1: announcement
2: cover letter
3: resume
interview process/ final interview
4: reference checks
5: negotiation - salary and benefits
recommendations for hire
1. RFI (information)
, 2. RFQ (qualifications)
2. RFP (proposals)
3. interview for clarification
4. reference checks
5. final recommendation
RFQ - Answer -Request for qualifications
- safety records
- financial stability
- general experience/ similar projects
- pending litigation
goal: will lead to natural rwduction in the # of applicants
RFP response - Answer -Request for proposal
- overview project, schedule and costs
- review of sample contract - comments
- overview of services offered/ descriptions
- identify how fee will be configured
- sample team resumes
- suggested safety plan
- range of company services
- corporate management plan
format of RFP - Answer -- executive summary
- project apporach
- scope of work
- price breakdown - same wbs
- schedule, and site logistic - same wbs
- value engineering
Preconstruction services - Answer -Site and Code Analysis:
System and Material Analysis:
Analyze foundations, structures, exterior skin, MEP systems, and interior finishes.
Evaluate materials and products.
Analysis and Coordination:
Perform value analysis, life cycle costing, and constructability reviews. Define scope
and coordinate design phases.
Pricing and Cost Management:
Trade Management:
Prequalify and solicit trades. Manage purchasing, scope, and 'total' project scheduling.
Document Quality and Design Support:
Project Delivery:
Sustainability and Logistics:
closing phase - Answer -- documents and deliverables are up-to-date and that all
issues are resolved
Design Phases (in order) - Answer -1: Programming
2: Schematic Design
3: Design Development
4: contract documents
programming phase - Answer -- establish building population and functions
- choose building site
- select systems and materials
- define budget and timeframe for construction
Schematic design phase - Answer -- site and location, alternative design schemes
- architects: compare the alternative design options
Design development phase - Answer -Delivery of the design development
- Architectual, structural, mechanical and electrical systems, refined floor plan, elevation
plans and section plans, outline specifications
Responsibilities
architect: selecting all major systems and components
CM: evaluating the cost and schedule and conduct value engineering
Contract documents phase - Answer -complete a set of well-defined working drawing
and technical specifications
considerations: scope, budget
Bid phase components - Answer -bid packages
bid invitation
bid period
contractor selection
construct phase components - Answer -project authorization
construction
turnover
owner acceptance
steps for hiring construction manager - Answer -1: announcement
2: cover letter
3: resume
interview process/ final interview
4: reference checks
5: negotiation - salary and benefits
recommendations for hire
1. RFI (information)
, 2. RFQ (qualifications)
2. RFP (proposals)
3. interview for clarification
4. reference checks
5. final recommendation
RFQ - Answer -Request for qualifications
- safety records
- financial stability
- general experience/ similar projects
- pending litigation
goal: will lead to natural rwduction in the # of applicants
RFP response - Answer -Request for proposal
- overview project, schedule and costs
- review of sample contract - comments
- overview of services offered/ descriptions
- identify how fee will be configured
- sample team resumes
- suggested safety plan
- range of company services
- corporate management plan
format of RFP - Answer -- executive summary
- project apporach
- scope of work
- price breakdown - same wbs
- schedule, and site logistic - same wbs
- value engineering
Preconstruction services - Answer -Site and Code Analysis:
System and Material Analysis:
Analyze foundations, structures, exterior skin, MEP systems, and interior finishes.
Evaluate materials and products.
Analysis and Coordination:
Perform value analysis, life cycle costing, and constructability reviews. Define scope
and coordinate design phases.
Pricing and Cost Management:
Trade Management:
Prequalify and solicit trades. Manage purchasing, scope, and 'total' project scheduling.
Document Quality and Design Support:
Project Delivery:
Sustainability and Logistics:
closing phase - Answer -- documents and deliverables are up-to-date and that all
issues are resolved