1. Q: What is the primary Virginia regulation governing
erosion and sediment control? A: Virginia Erosion
and Sediment Control Regulations (9VAC25-
840)
2. Q: What federal act provides the foundation for
stormwater regulations?
A: Clean Water Act (CWA) Section 402
3. Q: What is the minimum disturbed area that requires
an ESC plan in Virginia? A: 2,500 square feet or
more
4. Q: Who has the authority to issue stop work orders for
ESC violations?
A: The program administrator or designated inspector
5. Q: What is the maximum civil penalty for ESC violations in
Virginia? A:
$32,500 per violation per day
6. Q: How long must ESC plans be retained after
project completion? A: 3 years
7. Q: What is required for land disturbance activities of 1
acre or more? A: General VPDES permit for stormwater
discharges
8. Q: Who must sign ESC plans for projects under 5
acres? A: A responsible land disturber or
qualified professional
,2|Page
9. Q: What is the timeframe for plan review by the
plan- approving authority? A: 60 days from
receipt of complete application
,3|Page
10. Q: When must construction begin after ESC plan approval?
A: Within 5 years of approval
, 4|Page
11. Q: What constitutes "construction activity" under
Virginia regulations? A: Land-disturbing activities
including clearing, grading, and excavation
12. Q: Who is responsible for ESC compliance during
construction? A: The responsible land
disturber
13. Q: What is required before any land disturbance can
begin? A: Approved ESC plan and proper
permits
14. Q: How often must ESC inspections be conducted
during active construction? A: At least once every 14
days and after each rainfall event of
0.5 inches or more
15. Q: What is the definition of "responsible land disturber"?
A: The person who has operational control over
construction plans and specifications
16. Q: What happens if ESC measures fail during
construction? A: Immediate corrective action
must be taken within 24 hours
17. Q: Who can approve modifications to ESC plans? A:
The original plan- approving authority
18. Q: What is the minimum bond amount for ESC compliance?
A: $3,000 or $1,000 per acre of disturbance,
whichever is greater
19. Q: When can ESC bonds be released? A: After
final stabilization and acceptance by the plan-
approving authority
20. Q: What is required for emergency ESC work? A:
Immediate implementation followed by plan
submission within 7 days
21. Q: What authority do local governments have over
ESC programs? A: They may adopt more stringent
VA DEQ ESC INSPECTOR CERTIFICATION EXAM
BANK NEWEST 2026 ACTUAL EXAM QUESTIONS
AND CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) ALL ANSWERED {300 Q & A} ALREADY
GRADED A+ | BRAND NEW! | 100% PASS
1. Q: What is the primary Virginia regulation governing
erosion and sediment control? A: Virginia Erosion
and Sediment Control Regulations (9VAC25-
840)
2. Q: What federal act provides the foundation for
stormwater regulations?
A: Clean Water Act (CWA) Section 402
3. Q: What is the minimum disturbed area that requires
an ESC plan in Virginia? A: 2,500 square feet or
more
4. Q: Who has the authority to issue stop work orders for
ESC violations?
A: The program administrator or designated inspector
5. Q: What is the maximum civil penalty for ESC violations in
Virginia? A:
$32,500 per violation per day
6. Q: How long must ESC plans be retained after
project completion? A: 3 years
7. Q: What is required for land disturbance activities of 1
acre or more? A: General VPDES permit for stormwater
discharges
8. Q: Who must sign ESC plans for projects under 5
acres? A: A responsible land disturber or
qualified professional
,2|Page
9. Q: What is the timeframe for plan review by the
plan- approving authority? A: 60 days from
receipt of complete application
,3|Page
10. Q: When must construction begin after ESC plan approval?
A: Within 5 years of approval
, 4|Page
11. Q: What constitutes "construction activity" under
Virginia regulations? A: Land-disturbing activities
including clearing, grading, and excavation
12. Q: Who is responsible for ESC compliance during
construction? A: The responsible land
disturber
13. Q: What is required before any land disturbance can
begin? A: Approved ESC plan and proper
permits
14. Q: How often must ESC inspections be conducted
during active construction? A: At least once every 14
days and after each rainfall event of
0.5 inches or more
15. Q: What is the definition of "responsible land disturber"?
A: The person who has operational control over
construction plans and specifications
16. Q: What happens if ESC measures fail during
construction? A: Immediate corrective action
must be taken within 24 hours
17. Q: Who can approve modifications to ESC plans? A:
The original plan- approving authority
18. Q: What is the minimum bond amount for ESC compliance?
A: $3,000 or $1,000 per acre of disturbance,
whichever is greater
19. Q: When can ESC bonds be released? A: After
final stabilization and acceptance by the plan-
approving authority
20. Q: What is required for emergency ESC work? A:
Immediate implementation followed by plan
submission within 7 days
21. Q: What authority do local governments have over
ESC programs? A: They may adopt more stringent