Examen

CM 3111 exam Questions and Answers | New 2025/2026 Update | With Complete Solutions

Document preview thumbnail
Vista previa 2 fuera de 12 páginas

CM 3111 exam Questions and Answers | New 2025/2026 Update | With Complete Solutions

Vista previa del contenido

CM 3111 exam Questions and Answers | New
2025/2026 Update | With Complete Solutions
The _____ consist(s) of the invitation to bid, instructions to bidders, bid form, owner-

contractor agreement, general conditions of the contract, supplementary general

conditions, technical specifications, and the working drawings and form(s) the legal basis

for the construction of the project.

contract documents

The _____ includes determination of the quantities and costs of everything required to

complete the project. This includes the materials, labor, equipment, insurance, bonds, and

overhead, as well as an estimate of profit.

detailed estimate

_____ involves the contractor working with the owner (or through the owner's architect-

engineer) to arrive at a mutually acceptable price for the construction of the project. It

often involves negotiations back and forth on materials used, sizes, finishes, and other items

which affect the price of the project.

Negotiated bidding

What additional skill must the estimator have to be able to take a quantity survey and turn

it into a detailed estimate?

a. Must be able to use computer hardware and software and know how to manipulate the

various databases available or how to build databases.

b. Must have sufficient knowledge or labor performance and operations so that he can

convert them into costs on a project.

, c. Must be able, from looking at drawings, to visualize the project through the various

phases of construction.

d. All of the above

d. All of the above

_____ estimates are prepared by multiplying the square footage of a building by a cost per

square foot and then adjusting the price to compensate for differences in the building

heights, length of the building perimeter, and other building components. These estimates

require less information to prepare and are less accurate.

Square-foot

The _____ are written instructions concerning project requirements that describe the

quality of materials to be used and their performance.

technical specifications

The _____ are the actual plans from which the project will be constructed. They contain

the dimensions and locations of building elements, the materials required, and delineate

how they fit together.

working drawings

A percentage of the payments from the owner to the contractor that is withheld for the

protection of the owner and suppliers:

Retainage

What is a type of insurance that a contractor should maintain?

a. Builder's Risk insurance

Información del documento

Subido en
6 de diciembre de 2025
Número de páginas
12
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUINTER
3.6
(73)
Vendido
413
Seguidores
105
Artículos
40085
Última venta
5 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes