When you find a bottleneck, the first step should be:
a. add additional resources to the bottleneck
b. Look at removing waste in the process
c. line balancing
d. creating standard work


Give this one a try later!


b. Look at removing waste in the process (process in order b,c,d,a)

,Hour by hour charts help track production vs target to help operators and front-line
leaders make timely resource decisions. Hour by hour charts are an example of?
a. Leaders standardized work
b. Visual control
c. 5S
d. Interval


Give this one a try later!


b. Visual control




Which of the following are enablers to "separating man from machine"?
a. Standardized work, Jidoka
b. 5S, VSM
c. Autonomous Maintenace, Kaizen
d. Visual factory, Kaizen


Give this one a try later!


a. Standardized work, Jidoka




One of the foundations of the TPS is standardized work. Its purpose is to:
a. Ensure we capture the best practice work method
b. Reduce operator to operator variation
c. Provide a basis for improvement
d. All of the above


Give this one a try later!

, a. Product Family Matrix




Which is considered to be the WORST of the seven wastes?
a. Inventory
b. motion
c. Overproduction
d. Defects


Give this one a try later!


c. Overproduction




When the Ishikawa Diagram (Fishbone analysis) is used the potential causes are
broken down by:
a. 8P's
b. 4S's
c. 4M's
d. 5S's


Give this one a try later!


c. 4M's




What's the name of an activity that is non-value added but necessary?
a. Incidental
b. Auxiliary
c. Specified
d. A and B only

, Give this one a try later!


d. A and B only




Production standards in a lean system should be established by:
a. Scheduling managers
b. process engineers
c. efficiency experts
d. Production workers


Give this one a try later!


d. Production workers




Idea management systems are an important part of engaging employees at all levels.
Which is NOT an element of a good suggestions system?
a. A suggestion box on the wall
b. A simple approval process
c. A plan for recognition of ideas
d. All ideas are encouraged even small ones


Give this one a try later!


a. A suggestion box on the wall




If my WIP is 10 pieces and my cycle time is 2.5 days, what is my throughput rate?
a. 4 pieces per day
b. 25 pieces per day

Información del documento

Subido en
6 de diciembre de 2025
Número de páginas
43
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.50

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
CLASSROOMTEST
3.4
(10)
Vendido
53
Seguidores
3
Artículos
7774
Última venta
3 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes