1s meter - ANSWER-120v
2S Meter - ANSWER-House
3s meter - ANSWER-Single primary
4s - ANSWER-Single secondary package
Underground primary - ANSWER-4 ft
Biggest two way feed - ANSWER-North Corbin's switch gear 1
Slack span - ANSWER-75-90 ft
Tight span - ANSWER-250 ft
Service wire span - ANSWER-70 ft
nomial voltage - ANSWER-7620
14.4
Threshold voltage - ANSWER-5%
5 job briefing/tailgate - ANSWER-Hazards
Work procedure
Special precautions
Energy source
Ppe
120/240 bank - ANSWER-Wye/delta float grounds
120/208
277/480 - ANSWER-Wye/delta. Built the exact same way. Ground to pole
Ac
Dc - ANSWER-Ac- alternating current. (We use)
Dc- direct current. Car battery
Manchester sub feeders - ANSWER-12
Solutions
1s meter - ANSWER-120v
2S Meter - ANSWER-House
3s meter - ANSWER-Single primary
4s - ANSWER-Single secondary package
Underground primary - ANSWER-4 ft
Biggest two way feed - ANSWER-North Corbin's switch gear 1
Slack span - ANSWER-75-90 ft
Tight span - ANSWER-250 ft
Service wire span - ANSWER-70 ft
nomial voltage - ANSWER-7620
14.4
Threshold voltage - ANSWER-5%
5 job briefing/tailgate - ANSWER-Hazards
Work procedure
Special precautions
Energy source
Ppe
120/240 bank - ANSWER-Wye/delta float grounds
120/208
277/480 - ANSWER-Wye/delta. Built the exact same way. Ground to pole
Ac
Dc - ANSWER-Ac- alternating current. (We use)
Dc- direct current. Car battery
Manchester sub feeders - ANSWER-12