• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 30 páginas
Examen

VA DEQ ESC INSPECTOR EXAM QUESTIONS AND CORRECT ANSWERS. VERIFIED 2025/2026.

Document preview thumbnail
Vista previa 3 fuera de 30 páginas

VA DEQ ESC INSPECTOR EXAM QUESTIONS AND CORRECT ANSWERS. VERIFIED 2025/2026.

Vista previa del contenido

VA DEQ ESC INSPECTOR EXAM
QUESTIONS AND CORRECT ANSWERS.
VERIFIED 2025/2026.




VESCP - ANS Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


Minimum Standard 1 - ANS Stabilization


permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site; temporary soil stabilization shall be
applied within seven days to denuded areas that may not be at final grade but will remain
dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to
be left dormant for more than one year


Site NOT at Final Grade - ANS - stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - ANS - stabilize in 7 days (recommended immediately)
- permanently or temporarily seed and mulch

1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

,- mulch/matting/straw


Minimum Standard 2 - ANS Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be stabilized or protected with
sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts
and detains from disturbed areas


Minimum Standard 3 - ANS Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is
achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds or surety


Minimum Standard 4 - ANS First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to
trap sediment shall be constructed as a first step in any land-disturbing activity and shall be
made functional before upslope land disturbance takes place


a certain amount of initial land disturbance may be required to provide access for equipment to
install the perimeter controls, but site clearing and grading should be kept to a minimum until
the perimeter controls are in place




2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

, intercepts and detains small amounts of sediment from disturbed areas during construction
operation to prevent sediment from leaving the site and decrease velocity of sheet flows and
low-to-moderate level channel flow


Perimeter Controls - ANS assures that sediment does not leave the perimeter of the land-
disturbing area once site clearing, grading, and construction commences


Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary
diversions, diversions


Minimum Standard 5 - ANS Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation


reduce erosion and sedimentation and reduce damage from sediment and runoff to
downstream or off-site areas


Minimum Standard 6 - ANS Traps and Basins


sediment traps and basins shall be designed and constructed based upon the total drainage
area (not just disturbed area) to be served by the trap or basin


Sediment Traps - ANS minimum storage capacity shall be 134 cubic yards per acre of drainage
area and shall only control drainage areas less than 3 acres


*stone outlet = trap*


Sediment Basins - ANS surface runoff from disturbed areas that is comprised of flow from
drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage
capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall
system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm

3 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

Información del documento

Subido en
20 de noviembre de 2025
Número de páginas
30
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brainbarter
3.6
(58)
Vendido
367
Seguidores
159
Artículos
22996
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes