BCS – Basic Contractor Skills REAL EXAM

Puntuación
-
Vendido
-
Páginas
45
Grado
A+
Subido en
19-11-2025
Escrito en
2025/2026

Master the Basic Contractor Skills (BCS) exam with this comprehensive study guide. Includes high-yield practice questions, detailed explanations, and essential concepts to help aspiring contractors reinforce skills, boost confidence, and pass the BCS exam.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
19 de noviembre de 2025
Número de páginas
45
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

BCS – Basic Contractor Skills real exam!!




1. Which one of these is not a normal Zoning Regulation?

- Building set backs

- Parking requirements

- Building durability and cost

- Type of allowed building use or activity - ANSWER ✔----Building durability and cost



2. What is the minimum number of points needed to gain a LEED certified rating?

- 60

- 50

- 40

- 80 - ANSWER ✔---- 40



3. The total amount of energy consumed throughout all phases of the material life cycle is
____________?

- Embodied Material

- Embodied Energy

- Embodied Carbon

- Embodied Water - ANSWER ✔----Embodied Energy

,4. A single-purpose entity combines who under one legal contract ?

- The Owner and Contractor

- The Owner, the Architect, the Engineers

- The Architect and the Contractor

- The Owner, entire Design Team, and entire Construction Team - ANSWER ✔---- The Owner, entire
Design Team, and entire Construction Team



5. Who created the Master Format ?

- AISC

- Construction Specification Institute

- American Institute of Architects

- International Code Council - ANSWER ✔----Construction Specification Institute



6. What occupancy classification would be used for a church sanctuary ?

- Assembly

- Institutional

- Educational

- Industrial - ANSWER ✔---- Assembly



7.As a contractor, you will not have influence about design decisions.

-True

-False - ANSWER ✔----False



8. What is left out in the "cradle-to-gate analysis" ?

-Energy used to extract the natural resources

-Energy used to install and maintain the material

-Energy used to manufacture the material

,-Energy used to ship the raw material to the manufacturer - ANSWER ✔----Energy used to install and
maintain the material



9. LEED is governed and enforced by a government agency.

-True

-False - ANSWER ✔----False



10. Fire resistance is listed and categorised by the # of __________.

-buildings

-floors

-minutes

-hours - ANSWER ✔----hours



12. Considering safety or legality are not issues, who should always get final say of any decision being
made during a construction process ?

-Contractor

-Owner

-Architect

-Engineer - ANSWER ✔----Owner



13. Who is responsible for handling all aspects of the building design ?

-Contractor

-Engineer

-Architect

-Manufacturer - ANSWER ✔----Architect



14. What division of the Master Format will concrete be found ?

-05

-03

, -06

-02 - ANSWER ✔----03



15. What type of project delivery method is best suited for a project where a turn key price is
guaranteed to an owner in a bid ?

-None

-Design-Bid-Build

-Design-Build

-Integrated Project Delivery - ANSWER ✔----Design-Bid-Build



16. Which definition most accurately describes the Living Building Challenge ?

-A building will generate 50% of its own energy from on-site renewable resources, consume little fresh
water, and have little net carbon greenhouse gas emissions.

-Create a building that consumes little resources and is very comfortable to live in.

-Annually, a building will generate all its own energy from on-site renewable resources, consume no
fresh water, and have no net carbon greenhouse gas emissions.

-Create a building out of natural, living materials. - ANSWER ✔----Annually, a building will generate
all its own energy from on-site renewable resources, consume no fresh water, and have no net carbon
greenhouse gas emissions.



17. The IBC designates different occupancy classifications. Which one of these is not a classification ?

-Industrial

-Assembly

-Business

-Educational - ANSWER ✔----Industrial



18. What answerwer below best describes a "Cost Plus" payment schedule.

-The owner agrees to pay a contractor a lump sum fee for all costs and services provided.

-A contractor is paid a set price for all costs and work performed.
$27.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TUTORWILLIAM NURSING
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
138
Miembro desde
2 año
Número de seguidores
55
Documentos
3366
Última venta
3 días hace
TUTOR WILLIAM

4.8

75 reseñas

5
67
4
4
3
1
2
1
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes