NASCLA ACCREDITED PRACTICE EXAM
1. Which of the following best defines “retainage” in a
construction contract?
A. Penalty for late completion
B. Payment withheld until project completion
C. Payment for materials only
D. Bonus payment for early completion
Answer: B
Rationale: Retainage is withheld until substantial completion
to ensure contractor performance.
2. The critical path in CPM scheduling represents:
A. The path with the most float
B. The longest sequence of activities
C. The least important tasks
D. The lowest-cost activities
Answer: B
Rationale: Critical path tasks have zero float and determine
project duration.
,3. What is the primary purpose of a building permit?
A. To provide tax revenue
B. To ensure contractor certification
C. To ensure compliance with codes
D. To protect subcontractors
Answer: C
Rationale: Building permits ensure work complies with local
safety and construction codes.
4. Which bond guarantees completion of a project if the
contractor defaults?
A. Bid bond
B. License bond
C. Performance bond
D. Payment bond
Answer: C
Rationale: Performance bonds ensure contract fulfillment if
the contractor fails.
5. Which OSHA form is used to record work-related injuries
and illnesses?
A. OSHA 100
B. OSHA 301
,C. OSHA 300
D. OSHA 200
Answer: C
Rationale: OSHA 300 logs all recordable workplace injuries
and illnesses.
6. Overhead costs are best described as:
A. Direct job costs
B. Costs traceable to specific tasks
C. Company-wide operating costs
D. Labor-only expenses
Answer: C
Rationale: Overhead includes business expenses not tied to
specific jobs (rent, admin).
7. A contract that sets a fixed price regardless of cost changes
is a:
A. Time and materials contract
B. Unit-price contract
C. Cost-plus contract
D. Lump-sum contract
Answer: D
, Rationale: Lump-sum contracts lock in a fixed payment for the
entire project.
8. Which document lists materials, quantities, and installation
requirements?
A. Schedule of values
B. Specifications
C. Punch list
D. General conditions
Answer: B
Rationale: Specifications provide technical materials and
performance requirements.
9. An RFI is primarily used to:
A. Submit a bid
B. Request clarification
C. Report an injury
D. Change a schedule
Answer: B
Rationale: RFIs clarify ambiguous or incomplete contract
documents.
10. The purpose of a punch list is to:
1. Which of the following best defines “retainage” in a
construction contract?
A. Penalty for late completion
B. Payment withheld until project completion
C. Payment for materials only
D. Bonus payment for early completion
Answer: B
Rationale: Retainage is withheld until substantial completion
to ensure contractor performance.
2. The critical path in CPM scheduling represents:
A. The path with the most float
B. The longest sequence of activities
C. The least important tasks
D. The lowest-cost activities
Answer: B
Rationale: Critical path tasks have zero float and determine
project duration.
,3. What is the primary purpose of a building permit?
A. To provide tax revenue
B. To ensure contractor certification
C. To ensure compliance with codes
D. To protect subcontractors
Answer: C
Rationale: Building permits ensure work complies with local
safety and construction codes.
4. Which bond guarantees completion of a project if the
contractor defaults?
A. Bid bond
B. License bond
C. Performance bond
D. Payment bond
Answer: C
Rationale: Performance bonds ensure contract fulfillment if
the contractor fails.
5. Which OSHA form is used to record work-related injuries
and illnesses?
A. OSHA 100
B. OSHA 301
,C. OSHA 300
D. OSHA 200
Answer: C
Rationale: OSHA 300 logs all recordable workplace injuries
and illnesses.
6. Overhead costs are best described as:
A. Direct job costs
B. Costs traceable to specific tasks
C. Company-wide operating costs
D. Labor-only expenses
Answer: C
Rationale: Overhead includes business expenses not tied to
specific jobs (rent, admin).
7. A contract that sets a fixed price regardless of cost changes
is a:
A. Time and materials contract
B. Unit-price contract
C. Cost-plus contract
D. Lump-sum contract
Answer: D
, Rationale: Lump-sum contracts lock in a fixed payment for the
entire project.
8. Which document lists materials, quantities, and installation
requirements?
A. Schedule of values
B. Specifications
C. Punch list
D. General conditions
Answer: B
Rationale: Specifications provide technical materials and
performance requirements.
9. An RFI is primarily used to:
A. Submit a bid
B. Request clarification
C. Report an injury
D. Change a schedule
Answer: B
Rationale: RFIs clarify ambiguous or incomplete contract
documents.
10. The purpose of a punch list is to: