Minimum Standard 1 - correct answer Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than one year Site NOT at Final Grade - correct answer - stabilize in 14 days - temporarily seed - mulch - permanently stabilize if dormant 1 year Site at Final Grade - correct answer - stabilize in 7 days (recommended immediately) - permanently or temporarily seed and mulch - mulch/matting/straw Minimum Standard 2 - correct answer Stock Piles, Waste and Borrow Areas during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and detains from disturbed areas Minimum Standard 3 - correct answer Permanent Vegetation permanent vegetation cover shall be established on denuded areas not otherwise permanently stabilized (permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no % associated with this*) reduce erosion and decrease sediment yield from disturbed area

Vista previa del contenido

Erosion and Sediment Control
Minimum Standard 1 - ✔✔ correct answer Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
final grade is reached on any portion of the site; temporary soil stabilization shall be applied within
seven days to denuded areas that may not be at final grade but will remain dormant for longer than
14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than
one year



Site NOT at Final Grade - ✔✔ correct answer - stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year



Site at Final Grade - ✔✔ correct answer - stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 - ✔✔ correct answer Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment
trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and
detains from disturbed areas



Minimum Standard 3 - ✔✔ correct answer Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is achieved
that is uniform, mature enough to survive, and will inhibit erosion *there is no % associated with
this*)



reduce erosion and decrease sediment yield from disturbed area

,Erosion and Sediment Control
this is the standard used to verify that a site is ready for release of bonds or surety



Minimum Standard 4 - ✔✔ correct answer First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap
sediment shall be constructed as a first step in any land-disturbing activity and shall be made
functional before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for equipment to
install the perimeter controls, but site clearing and grading should be kept to a minimum until the
perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during construction
operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-
moderate level channel flow



Perimeter Controls - ✔✔ correct answer assures that sediment does not leave the perimeter of the
land-disturbing area once site clearing, grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary diversions,
diversions



Minimum Standard 5 - ✔✔ correct answer Earthen Structure Stabilization



stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream or
off-site areas



Minimum Standard 6 - ✔✔ correct answer Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total drainage area (not
just disturbed area) to be served by the trap or basin

, Erosion and Sediment Control
Sediment Traps - ✔✔ correct answer minimum storage capacity shall be 134 cubic yards per acre of
drainage area and shall only control drainage areas less than 3 acres



*stone outlet = trap*



Sediment Basins - ✔✔ correct answer surface runoff from disturbed areas that is comprised of flow
from drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage
capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall system
shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour
duration; runoff coefficients used in runoff calculations shall correspond to a bare earth condition or
those conditions expected to exist while the sediment basin is utilized.



Sediment Trapping Devises - ✔✔ correct answer 1. place near the lowest drainage points of a project



2. install as a first-step measure [MS-4]



3. stabilize immediately [MS-5]



4. must include outlet protection for basins [MS-11]



Minimum Standard 7 - ✔✔ correct answer Cut and Fill Slopes



roughening the surface of the slope decreases runoff, lowers the velocity runoff, increases water
retention, and leads to better seed germination



slopes that are found to be eroding excessively within on year of permanent stabilization shall be
provided with additional slop stabilizing measures until the problem is corrected



Minimum Standard 8 - ✔✔ correct answer Concentrated Runoff



shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent
channel, flume or slope drain structure



outlets of these drains need outlet protection to prevent erosion from the concentrated flow

Información del documento

Subido en
14 de noviembre de 2025
Número de páginas
20
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
brittton
3.4
(20)
Vendido
156
Seguidores
95
Artículos
5174
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes