• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 21 páginas
Examen

Texas Commission on Environmental Quality

Document preview thumbnail
Vista previa 3 fuera de 21 páginas

Texas Commission on Environmental Quality Texas Commission on Environmental Quality

Vista previa del contenido

Texas Commission on Environmental Quality (TCEQ)
On-Site Sewage Facility (OSSF) licensing exam EXAM
QUESTIONS AND CORRECT ANSWERS VEriFIED ANSWERS
PLUS RAIONALES 2025/2026 Q&A | INSTANT DOWNLOAD
PDF

1. What is the minimum depth of suitable soil (below the bottom of the proposed
excavation) for a standard absorptive drainfield in Texas?
A. 12 inches
B. 18 inches
C. 24 inches
D. 30 inches
Answer: C. 24 inches — The rules require at least 24 in of acceptable soil below the
bottom of the drainfield excavation for a standard system.

2. Which soil textural classes are always unsuitable for standard absorptive OSSF systems
in Texas?
A. IA and II
B. IV and V
C. IA and IV
D. IB and III
Answer: C. IA and IV — Class IA (sand or loamy sand) and Class IV (clay) are identified as
unsuitable for standard systems. Docsity+1

3. An excavated trench for a standard drainfield must be level within 1 inch per 25 feet or a
maximum of how many inches?
A. 1 inch
B. 2 inches
C. 3 inches
D. 4 inches
Answer: C. 3 inches — The rule sets a maximum of 3 inches difference even when using
the 1 inch per 25 feet guideline. Docsity

,4. Which of the following is the least treatment level (i.e., poorest) of domestic wastewater
treatment?
A. Aerobic treatment unit
B. Two-compartment septic tank
C. Municipal sewage treatment plant
D. Secondary treatment plant
Answer: B. Two-compartment septic tank — Primary treatment (septic tank) provides the
least level of treatment compared to secondary/tertiary options. Docsity

5. The person licensed by TCEQ to perform site evaluations (soil & site survey) for OSSFs is
called a(n):
A. Installer I
B. Site Evaluator
C. Designated Representative
D. Maintenance Technician
Answer: B. Site Evaluator — A site evaluator conducts pre-construction evaluations
including soils and site surveys. TCEQ+1

6. What is the minimum slope on a lot that drops 20 feet over a depth of 250 feet?
A. 6%
B. 7%
C. 8%
D. 9%
Answer: C. 8% — (20 ÷ 250) × 100 = 8%.

7. When installing a gravelless pipe drainfield, what classes of soil fill are allowed for
backfilling?
A. Only Class I a & b
B. Class Ib, II or III
C. Class IV only
D. Any class if geotextile is used
Answer: B. Class Ib, II or III — Gravelless chambers may be backfilled with these soil
classes. Docsity

8. For proper protection of a work-site excavation over a certain depth, OSHA requires that
it be sloped, shored, or otherwise supported. That depth is:
A. 3 feet
B. 4 feet
C. 5 feet
D. 6 feet

, Answer: C. 5 feet — OSHA’s general rule for trench excavations requiring protective
systems applies at 5 ft depth or greater.

9. When is a maintenance contract required for a single-family residence OSSF using
surface application or subsurface drip irrigation?
A. When the system is older than 10 years
B. Always, regardless of system type
C. For surface and subsurface drip irrigation systems only
D. Only if the home has more than 4 bedrooms
Answer: C. For surface and subsurface drip irrigation systems only — These
higher-maintenance disposal methods require contracts. Docsity

10. Which of the following microorganisms are not typically considered when discussing
pathogens in domestic wastewater?
A. Bacteria
B. Viruses
C. Protozoa
D. Algae
Answer: D. Algae — Pathogens of concern include bacteria, viruses, protozoa and
helminths. Algae are not pathogens in this context. Docsity

11. Which license classification allows an individual to install all types of on-site sewage
facilities (OSSFs) in Texas?
A. Installer I
B. Installer II
C. Apprentice
D. Maintenance Provider
Answer: B. Installer II — Installer II licensees are authorized to install all types of OSSF
systems. TCEQ

12. The permitting process for a new OSSF typically begins with a site evaluation, then what
is the next step?
A. Construction begins
B. System must be planned (designed)
C. Permit application is submitted
D. System inspection during installation
Answer: B. System must be planned (designed) — After site evaluation comes system
selection and design planning before permit application. Docsity+1

Información del documento

Subido en
11 de noviembre de 2025
Número de páginas
21
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$24.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ALPHAGRAY
3.8
(19)
Vendido
88
Seguidores
3
Artículos
8669
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes