CISEC Exam Questions With Correct
Answers
LDP |- |CORRECT |ANSWER✔✔-Land |Developing |Projects |- |altering |landscape |for |projects |such |
as |agriculture |or |housing |ect.
NPDES |- |CORRECT |ANSWER✔✔-National |Pollutant |Discharge |Elimination |System
- |section |of |the |CWA |(Clean |Water |Act) |to |permit |stormwater |discharges |associated |w |
industrial |activities |PER |permit
CWA |Penalty |Types |- |CORRECT |ANSWER✔✔-Adminstrative |
Class |I. |Neglegent
Class |II. |Knowlingly |= |greater |fines
What |documents |are |required |on |site? |- |CORRECT |ANSWER✔✔-- |SWPPP
- |CGP |
- |Site |Map
- |Drawings |and |Key
- |All |inspection |reports
- |Any |amendments |to |SWPPP
Who |is |the |"operator"? |Also |the |LRP. |- |CORRECT |ANSWER✔✔-Usually |the |OWNER |of |the |site, |
not |the |contractor, |unless |authorized |by |the |owner |to |general |contractor |to |have |day-to-day |
operational |control!
, When |do |you |need |permit |coverage? |- |CORRECT |ANSWER✔✔-Required |from |start |to |end |of |
project. |"End" |being |the |final |vegetative/non-vegetative |(concrete) |stabilization |occuring. |
For |any |project |one |acre |or |greater.
Large |Land |Development |- |CORRECT |ANSWER✔✔--strips |off |all |existing |vegetation |a.k.a |site |
carving
-usually |on |hillsides |and |steep |slopes
-installation |of |untilities |that |tear |up |large |areas |of |land
Vertical |Projects |- |CORRECT |ANSWER✔✔-- |Homebuilding, |smaller |residence |construction |
projects |
-usually |multiple |subcontractors
-requires |lots |of |housekeeping |= |mass |choas
Bix |Box |Projects |- |CORRECT |ANSWER✔✔--commercial |buildings |
-mass |grading |and |mass |choas
-highly |visible |w/ |fairly |large |footprint
Linear |Projects |- |CORRECT |ANSWER✔✔--roadways, |utilities, |and |stream |corridors
-long |narrow |sites |and |mass |choas
-limites |site |access |and |continually |changing |(high |activity)
What |is |erosion? |- |CORRECT |ANSWER✔✔-The |process |by |which |soil |particle |get |displaced |by |
the |act |of |wind |of |water.
Answers
LDP |- |CORRECT |ANSWER✔✔-Land |Developing |Projects |- |altering |landscape |for |projects |such |
as |agriculture |or |housing |ect.
NPDES |- |CORRECT |ANSWER✔✔-National |Pollutant |Discharge |Elimination |System
- |section |of |the |CWA |(Clean |Water |Act) |to |permit |stormwater |discharges |associated |w |
industrial |activities |PER |permit
CWA |Penalty |Types |- |CORRECT |ANSWER✔✔-Adminstrative |
Class |I. |Neglegent
Class |II. |Knowlingly |= |greater |fines
What |documents |are |required |on |site? |- |CORRECT |ANSWER✔✔-- |SWPPP
- |CGP |
- |Site |Map
- |Drawings |and |Key
- |All |inspection |reports
- |Any |amendments |to |SWPPP
Who |is |the |"operator"? |Also |the |LRP. |- |CORRECT |ANSWER✔✔-Usually |the |OWNER |of |the |site, |
not |the |contractor, |unless |authorized |by |the |owner |to |general |contractor |to |have |day-to-day |
operational |control!
, When |do |you |need |permit |coverage? |- |CORRECT |ANSWER✔✔-Required |from |start |to |end |of |
project. |"End" |being |the |final |vegetative/non-vegetative |(concrete) |stabilization |occuring. |
For |any |project |one |acre |or |greater.
Large |Land |Development |- |CORRECT |ANSWER✔✔--strips |off |all |existing |vegetation |a.k.a |site |
carving
-usually |on |hillsides |and |steep |slopes
-installation |of |untilities |that |tear |up |large |areas |of |land
Vertical |Projects |- |CORRECT |ANSWER✔✔-- |Homebuilding, |smaller |residence |construction |
projects |
-usually |multiple |subcontractors
-requires |lots |of |housekeeping |= |mass |choas
Bix |Box |Projects |- |CORRECT |ANSWER✔✔--commercial |buildings |
-mass |grading |and |mass |choas
-highly |visible |w/ |fairly |large |footprint
Linear |Projects |- |CORRECT |ANSWER✔✔--roadways, |utilities, |and |stream |corridors
-long |narrow |sites |and |mass |choas
-limites |site |access |and |continually |changing |(high |activity)
What |is |erosion? |- |CORRECT |ANSWER✔✔-The |process |by |which |soil |particle |get |displaced |by |
the |act |of |wind |of |water.