Which of the following estimating methods is typically used by the architect rather than the contractor? - correct answer Conceptual estimate An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a... - correct answer cost plus contract Equipment needs for a project are BEST estimated by... - correct answer Calculating the number of hours or days it is needed What type of insurance is needed for a partnership to insure that the business does NOT go out of business if one partner dies? - correct answer Key man An owner hires a construction manager for a project. Which of the following is TRUE with regard to subcontractors? - correct answer The subcontractors are prime contractors

Vista previa del contenido

VA Contractors: General (Class A or
B)
Which of the following estimating methods is typically used by the architect rather than the
contractor? - ✔✔ correct answer Conceptual estimate



An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed
fee for the contractor's overhead and profit is called a... - ✔✔ correct answer cost plus contract



Equipment needs for a project are BEST estimated by... - ✔✔ correct answer Calculating the number
of hours or days it is needed



What type of insurance is needed for a partnership to insure that the business does NOT go out of
business if one partner dies? - ✔✔ correct answer Key man



An owner hires a construction manager for a project. Which of the following is TRUE with regard to
subcontractors? - ✔✔ correct answer The subcontractors are prime contractors



What protects a contractor from risk? - ✔✔ correct answer Insurance



An ADVANTAGE of a Critical Path Method (CPM) schedule is it... - ✔✔ correct answer Identifies
activities that MUST be completed before other activities can occur



What may be covered by an allowance in a contract? - ✔✔ correct answer Light fixture costs



Which of the following is considered ethical behavior? - ✔✔ correct answer Failing to disclose one
subcontractor's bid to another



Compensation paid to independent contractors is reported on Form... - ✔✔ correct answer 1099



The BEST business practice for special-ordered materials is to... - ✔✔ correct answer put the order
requirements in writing



A contract refers to an insurance agreement that the contractor is REQUIRED to have. This is
considered... - ✔✔ correct answer Part of the contract

, VA Contractors: General (Class A or
B)
Records of an employee's exposure to hazardous materials MUST be kept a MINIMUM of how many
years? - ✔✔ correct answer 30 years



AT LEAST how often should employees watch for possible hazards at the job site? - ✔✔ correct
answer constantly



An employee can request to receive advance earned income credit on Form... - ✔✔ correct answer
W-5



A contractor uses funds paid by a project owner to purchase materials to start a different project.
The laborers for the original project do NOT get paid by the contractor. Under the lien law, this is
considered... - ✔✔ correct answer Intent to defraud by the contractor



What should be added to wage rates to ensure accuracy in estimating labor for a project? - ✔✔
correct answer Labor burden



What MUST be included in an estimate for a job? - ✔✔ correct answer Materials, labor, equipment,
and overhead costs



The 3 PRIMARY elements of a contract are... - ✔✔ correct answer offer, acceptance, and
consideration



At LEAST how often MUST an employee report information on the number of employees and the
number of new hires in order to meet the requirements of the Child Support Enforcement Act? - ✔✔
correct answer every 2 months



Costs that relate to construction activity but are NOT easily identifiable for a specific project are
considered... - ✔✔ correct answer Project overhead



A reason for using a lower than usual profit markup for a specific project could be to... - ✔✔ correct
answer cover company overhead costs



Time card records MUST be kept a MINIMUM of... - ✔✔ correct answer 4 years

Información del documento

Subido en
4 de noviembre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$19.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
brittton
3.4
(20)
Vendido
156
Seguidores
95
Artículos
5171
Última venta
2 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes