PMP Certification Exam with All Correct & 100% Verified Answers |Actual Complete Exam| Already Graded A+

Document preview thumbnail
Vista previa 3 fuera de 22 páginas

PMP Certification Exam with All Correct & 100% Verified Answers |Actual Complete Exam| Already Graded A+

Vista previa del contenido

PMP Certification Exam with All Correct & 100%
Verified Answers |Actual Complete Exam| Already
Graded A+

Group whose function is to review, approve or reject changes on the project as they relate to the
various areas of the represented bussiness ✔Correct Answer-Change Control Board

Used to asses the impact and consequnces of requested changes on the project ✔Correct Answer-
Change Control System

Factors that limits project options such as the number of people available, amount of time or money
available to finish the job or other resources or assest issues ✔Correct Answer-Contraints

General Closing Order of itmes for a project (6) ✔Correct Answer-1. Close out any contracts w/
outside vendors
2. Deliver any required reports assoc. w/ closure (Opa updates)
3. Complete any Close Project of Phase activites
4. Performed Lessons Learned
5. Complete Archives of any project Files (OPA updates)
6. Release resources for other projects

What are Lessons Learned? ✔Correct Answer-Opportunity that allows the team to learn from past
experience and improve on the project as the complete it. LL can come along before the end on the
project . If they come at the end administrative procedures come into play

3 main goals of a configuration mgmt system ✔Correct Answer-1. To develop a consistent process
to evaluate changes
2. To create an environment in which you can review and approve appropiate changes to modify the
project for the better.
3. To set communication standards so the project team can communicate those changes to the
appropiate stakeholders

A cumulative document that contains all the documents used in the project mgmt apporach on the
project. It describes the steps associated w/ executing, monitoring and controlling and closing
✔Correct Answer-Project Managment Plan

Closing a Project Includes the Following (3) ✔Correct Answer-Product Verification Lesson Learned
Updating records - Project files, contract files
Reporting Archiving Formal Acceptance

Know Assumptions as they relate to a Project ✔Correct Answer-When you perform project mgmt
part of the concept of planning is to deal with items unkown, here you must make assumptions for
scheduling and budgeting. In most cases as the project evolves you learn more about it

Used for communication and information distribution on the project not necessarily a high tech
system but whatever is used for project communication on the project. Normally a mixture of
technology and non-technology. ✔Correct Answer-PMIS

,What is the result of Executing? ✔Correct Answer-Project Scope is built

What is the result of Initiating? ✔Correct Answer-Project Charter and Stakholders are Identified

What is the result of Monitoring and Controlling? ✔Correct Answer-Corrective Action

What is the result of Closing? ✔Correct Answer-results in the product, service or result transition
of the project

Characteristics of the PMO (3) ✔Correct Answer-Characteristics of the PMO (3)
A centralized area for all 1.PM personnel to and be assigned. 2. for documentation a process support
3. For Project mgmt support and auditing of projects.

Performing day to day operations by a project Mgmt approach... ✔Correct Answer-Mgmt by
Projects

The process that result in the authorization of a project.. ✔Correct Answer-Project Initiation

The process required to develop the activites to attain objective.. ✔Correct Answer-Planning
Process

Emcompasses project of similar work or correlated activites managed in a coordinated way to attain
benefits that could not achieved separately ✔Correct Answer-Project Mgmt

Process of completing work on the Project. It is not the management of the work, but rather the
work process. Can be describe what work is done (and who does the work ) in each phase of the
project, what the deliverables are, and the approval for each phase ✔Correct Answer-Project Life
Cycle

A smaller piece of the project as a result of decomposition; is usually created as a result of creating
the work breakdown structure ✔Correct Answer-Sub Project

Has a specific purpose Creates specific results
Has a start a nd finish Temporary
Could be progressively elaborated as more is learn ✔Correct Answer-Characterisitics of Project(5)

Involves the product or service from concept to divestment (closure) This cycle typically begins with a
business plan end with a product or service ✔Correct Answer-Product Life Cycle

Initating Planning Executing Monitoring and Controlling
Closing ✔Correct Answer-Project Mgmt Life Cycle in 5 process group

Market Demand Strategic Opportunity Customer Request
Technological Advance Legal requirements ✔Correct Answer-Projects (or project selection) are
typically authorized as result of the following

A group of related projects managed in a coordinated way to obtain benefits and control not availble
from managing the individually ✔Correct Answer-Program Management

, Practice by which a company looks into the furture for products or services it must have, typically 3
to 5 years in the future. Projects are the tools that company will use to implement the strategic goals
✔Correct Answer-Strategic Planning

What is the triple contraints? ✔Correct Answer-Scope time cost

10 things remember for a brain dump ✔Correct Answer-Quality gurus HR gurus Comm Channels
Fromula
Expected Monetary Value Formula
Four Core Earned Value Formula
Standard Deviation Values Triangular pert formulas

2 - 20 - 8 - 10 - 2 ✔Correct Answer-Process groups /Knowledge areas are number by

A group of programs of projects related and managed in a coordinated way to achieve specific
strategic business goals ✔Correct Answer-Portfolio

A group of related projected project that are managed to obtain synergistic benefits and control
✔Correct Answer-Program

An Organizational which authorizes the project manager to assign resources to the project to
establish priorities and to direct the work of the project ✔Correct Answer-Projectized Organization

Mgmt of various portfolios that include the project and programs of which they consist can in
prioritization, authorization, mgmt ✔Correct Answer-Portfolio Mgmt

What are Lessons Learned? ✔Correct Answer-Opportunity that allows the team to learn from past
experience and improve on the project as the complete it. LL can come along before the end on the
project . If they come at the end administrative procedures come into play

The original estimate plus any approve changes. it is the value against which the work results
(somtimes called actuals) are compared ✔Correct Answer-Baseline

Components of the project Mgmt Plan.. ✔Correct Answer-Anything that ends with a plan or
baseline

Process used to control product features and details through change control ✔Correct Answer-
Configuration Mgmt

Who creates a the Project Charter? ✔Correct Answer-1. Anyone whose has an authority to create a
charter. 2. even a PM - but it must be signed by someone who can invest authority for the project w/
the PM typically Senior Mgmt

Process of developing a document that formally authorizes a project or a phase and document initial
requirements that satisfy the stakeholders needs and expectations ✔Correct Answer-Develop
Project Charter

Formal or informal system used in project mgmt to ensure that work is done as planned. It ensures
that right work is done in the right order at the right time by the right people ✔Correct Answer-
Work Authorization System

Información del documento

Subido en
2 de noviembre de 2025
Número de páginas
22
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$21.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Stuvia2026
2.3
(3)
Vendido
26
Seguidores
1
Artículos
6261
Última venta
2 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes