Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

RWP PG EXAM QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

RWP PG EXAM QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+ type of working limits on controlled track - Answers foul time, exclusive track occupancy type of working limits on non-controlled track - Answers inaccessible track type of train approach warning - Answers watchman type of train approach warning - Answers individual train detection What type of work roadway workers do? - Answers inspection and construction of track, maintenance of bridges, repair of signal and communication systems, repair of RMM True or false. Fouling a track can apply to both people and machinery - Answers True Within what distance to the track is a roadway worker considered fouling it? - Answers 4 feet from the nearest running rail a what authorizes movements on controlled track. - Answers Operator/Dispatcher The RWIC is required to be qualified on physical characteristics when their group is working on.... - Answers All tracks The EIC is an employee who is in charge of.... - Answers A work group The main role of the RWIC is.... - Answers To establish on track safety When can personal electronic devices be used while on duty? - Answers If there is an emergency at the job site and no other forms of communication are available Prior to performing any task that requires fouling a track or has the potential to foul a track, all roadway workers must participate in an.... - Answers on-track safety briefing The safety briefing must be conducted.... - Answers At the job location Whistle boards are required when.... - Answers 5 or more employees are working for more than 1 hour When using foul time with off-track equipment for more than 5 minutes on a main track you must use.... - Answers a supplemental shunting device Local control is used for.... - Answers C&S inspections/testing or joint C&S and MW switch inspection How is a job briefing documented? - Answers NRPC 4104 When is an on-track safety briefing required? - Answers When performing any task that has potential to foul a track. Who is responsible for establishing on-track safety? - Answers RWIC What does foul time ensure for the crew working in the designated area(working limits)? - Answers That no trains will operate within the working limits What information is provide by the RWIC when requesting foul time? - Answers Name and title, time limits, track designation, track limits When is the use of an SSD required? - Answers Any situation in which equipment is used for foul time longer than 5 minutes What allows an RWIC to establish ETO(Exclusive Track Occupancy)? - Answers Permission from the dispatcher, flagman stationed at each entrance of working limits, fixed signals indicating "stop" When are whistle boards required? - Answers When working with 5 or more employees for more than 1 hour Do whistle boards replace watchman? - Answers No All movements made on non-controlled track must be made using.... - Answers Restricted Speed Using restricted speed train/equipment must be able to.... - Answers Stop within half the range of vision What is a method of establishing working limits on non-controlled track? - Answers Physically preventing entry What are the Methods of making a track inaccessible(non-controlled track)? - Answers A switch

Vista previa del contenido

RWP PG EXAM QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+

type of working limits on controlled track - Answers foul time, exclusive track occupancy

type of working limits on non-controlled track - Answers inaccessible track

type of train approach warning - Answers watchman

type of train approach warning - Answers individual train detection

What type of work roadway workers do? - Answers inspection and construction of track,
maintenance of bridges, repair of signal and communication systems, repair of RMM

True or false. Fouling a track can apply to both people and machinery - Answers True

Within what distance to the track is a roadway worker considered fouling it? - Answers 4 feet
from the nearest running rail

a what authorizes movements on controlled track. - Answers Operator/Dispatcher

The RWIC is required to be qualified on physical characteristics when their group is working
on.... - Answers All tracks

The EIC is an employee who is in charge of.... - Answers A work group

The main role of the RWIC is.... - Answers To establish on track safety

When can personal electronic devices be used while on duty? - Answers If there is an
emergency at the job site and no other forms of communication are available

Prior to performing any task that requires fouling a track or has the potential to foul a track, all
roadway workers must participate in an.... - Answers on-track safety briefing

The safety briefing must be conducted.... - Answers At the job location

Whistle boards are required when.... - Answers 5 or more employees are working for more than
1 hour

When using foul time with off-track equipment for more than 5 minutes on a main track you
must use.... - Answers a supplemental shunting device

Local control is used for.... - Answers C&S inspections/testing or joint C&S and MW switch
inspection

How is a job briefing documented? - Answers NRPC 4104

When is an on-track safety briefing required? - Answers When performing any task that has
potential to foul a track.

, Who is responsible for establishing on-track safety? - Answers RWIC

What does foul time ensure for the crew working in the designated area(working limits)? -
Answers That no trains will operate within the working limits

What information is provide by the RWIC when requesting foul time? - Answers Name and title,
time limits, track designation, track limits

When is the use of an SSD required? - Answers Any situation in which equipment is used for foul
time longer than 5 minutes

What allows an RWIC to establish ETO(Exclusive Track Occupancy)? - Answers Permission from
the dispatcher, flagman stationed at each entrance of working limits, fixed signals indicating
"stop"

When are whistle boards required? - Answers When working with 5 or more employees for more
than 1 hour

Do whistle boards replace watchman? - Answers No

All movements made on non-controlled track must be made using.... - Answers Restricted
Speed

Using restricted speed train/equipment must be able to.... - Answers Stop within half the range
of vision

What is a method of establishing working limits on non-controlled track? - Answers Physically
preventing entry

What are the Methods of making a track inaccessible(non-controlled track)? - Answers A switch
or derail that prevents access, a remotely controlled switch, a discontinuity rail, a flagman,
working limits on controlled track that connects with non-controlled track

All movements made on non-controlled track must be made at.... - Answers Restricted Speed

When traveling at restricted speed train or equipment must be able to.... - Answers Stop within
half the range of vision of potential hazard

How are working limits established on non-controlled track? - Answers Inaccessible track

A procedure used by watchman to notify of approaching train - Answers Train approach warning

Train approach warning must be given with enough time for roadway workers to.... - Answers
Move to and occupy a PPOS at least 15 seconds before train enters working limits

A specific location a roadway worker must go to upon receiving a watchmans warning is called
a.... - Answers Pre-Determined Position of Safety(PPOS)

Información del documento

Subido en
28 de octubre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
joshuawesonga22
3.4
(13)
Vendido
118
Seguidores
2
Artículos
15048
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes