• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 54 páginas
Examen

CDT Exam Prep 1-4 Questions with Detailed Verified Answers

Document preview thumbnail
Vista previa 4 fuera de 54 páginas

CDT Exam Prep 1-4 Questions with Detailed Verified Answers

Vista previa del contenido

CDT Exam Prep 1-4 Questions with Detailed
Verified Answers
Bidding documents are considered legal documents?

▪ True.

▪ False. Ans: False

Codes governing commercial construction and residential construction are different?

▪ True.

▪ False. Ans: True

The A/E usually hires a construction manager? Ans: False

The Owner, Contractor and A/E are parties to the construction agreement?

▪ True.

▪False. Ans: False

There are no differences between the AIA and EJCDC general conditions?

▪ True.

▪False. Ans: False

The drawings take precedence over the specifications?

▪ True.

▪False. Ans: False

,The role of a subcontractor is the same as a material supplier?

▪ True.

▪ False. Ans: False

The supplementary conditions should be coordinated with the Owner/A/E agreement?

▪ True.

▪Fals Ans: True

nProject descriptions and outline specifications are legal and binding documents?

▪ True.

▪False Ans: False

nThe contractor and the A/E review submittals for the same reasons and from the
same point of view?

▪ True.

▪False Ans: F

In 1964, the term "Project Manual" was introduced by the:

A. American Bar Association.

B. American Institute of Architects.

C. Construction Specifications Institute.

D. Department of Defense. Ans: B

© Get it right 2025 Getaway - Stuvia US All rights reserved

,Uniform Location of Subject Matterprepared by the EJCDC and jointly published by
EJCDC and AIA provides a recommended location of topics in all of the following
EXCEPT:

A. Supplementary Conditions.

B. Division 01.

C. Agreement.

D. Drawings. Ans: D

During the Planning/Pre-Design stage, the A/E may be retained to:

A. Develop outline specifications.

B. Describe the character of the mechanical system.

C. Prepare renderings.

D.Assist in financial feasibility studies Ans: D

During which project phase does the A/E review the Owner's program and budget
requirements and suggest alternative approaches?

A. Planning/Pre-Design.

B. Design.

C. Bidding/Negotiation.

D. Construction.

E. Post-Construction. Ans: B



© Get it right 2025 Getaway - Stuvia US All rights reserved

, A project's "life cycle" includes all of the following EXCEPT?

A. Planning/Design.

B. Financing.

C. Construction.

D. Evaluation.

E. Demolition. Ans: B

nThe Specification-type document prepared during the Design Development phase is
called the:

A. Outline Specification.

B. Rough Draft Specification.

C. UniFormat Elements. Ans: A

nThe contractual relationship governed by the Conditions of the Contract is between:

A. Owner and Contractor.

B. A/E and Contractor.

C. Owner and Subcontractors.

D.A/E and Subcontractors. Ans: A

nThe Agreement:

A. Establishes how the contract will be administered.



© Get it right 2025 Getaway - Stuvia US All rights reserved

Información del documento

Subido en
25 de octubre de 2025
Número de páginas
54
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Novalearn
3.6
(7)
Vendido
27
Seguidores
0
Artículos
5062
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes