The ________ will serve as the Initial Decision Maker, unless otherwise indicated in
the Agreement :

A) Owner

B) Architect

C) Construction Manager

D) Contractor Ans: Architect

MasterFormat provides a standard system for:



A) Numbering and titling Section paragraphs.

B) Assigning Work to Subcontractors or trades.

C) Titling and arranging Project Manuals.

D) Establishing construction sequence. Ans: C

Quality Control activities occur before or while accomplishing the Work or service:

A) True

B) False Ans: False

The parties to the Contract for Construction are:



A) Contractor and Subcontractors

,B) Owner

C) Architect

D) Contractor

E) Owner, Contractor and A/E

F) Suppliers or Manufacturers

G) Owner and Contractor Ans: G Owner and Contractor

One of the benefits of working as a team is not:

- increased productivity

- reducted project costs

- earlier project completion

- fewer meetings Ans: fewer meetings

The method of computation of Contractor's overhead and profits for Change Order
prices, where both additions and deletions are involved, is found in the:

A) Agreement.

B) Conditions of the Contract.

C) Division 1.

D) Instructions to Bidders. Ans: B Conditions of the Contract

The EPA's definition of a green building covers all three primary aspects of the built
environment, siting, design and construction.


© Get it right 2025 Getaway - Stuvia US All rights reserved

,True

False Ans: False

What functional considerations must the A/E use to design the project elements and
their relationships in a manner that ensures proper function of the project in
accordance with the Owner's program and related AHJ requirements?



A)

Adjacency of project elements, contextual compatibility of materials, aesthetic effects
of project elements

B)

Contractor's ability to procure the materials, owners programmatic requirements

C)

Quantities and arrangements of elements, juxtaposition of light and shadow

D)

The size of project elements, performance capacity of project elements, arrangement
of project elements Ans: D) The size of project elements, performance capacity of
project elements, arrangement of project elements

The Contractor team participants do NOT include the:

A) subcontractor.

B) Construction Manager.
© Get it right 2025 Getaway - Stuvia US All rights reserved

, C) Contractor.

D) Owner.

E) accountant Ans: D) Owner.

All of the following could be Articles in PART 1 - GENERAL of a specification except
which one?



A) References

B) Action Submittals

C) Source Quality Control

D) Measurement and Payment Ans: C) Source Quality Control

The responsibility of inspecting work already performed for proper condition to
receive subsequent work lies with the:



A) Owner

B) A/E

C) Contractor

D) Subcontractor Ans: C) Contractor

Division-01 sections of the Project Manual expand and cross reference the conditions
of the Contract in all cases.



© Get it right 2025 Getaway - Stuvia US All rights reserved

Información del documento

Subido en
25 de octubre de 2025
Número de páginas
56
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Shinnie
3.6
(7)
Vendido
24
Seguidores
0
Artículos
4121
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes