Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

CM 1112 Final Exam Questions with Detailed Verified Answers

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

CM 1112 Final Exam Questions with Detailed Verified Answers

Vista previa del contenido

CM 1112 Final Questions with Detailed Verified
Answers
Constructing and operating buildings accounts for all of the energy consumption. Ans:
False

Fine aggregate is also known as gravel. Ans: False

Dead loads are permanent and live load change with time. Ans: True

Control joints should be at least ¼ of the slab depth. Ans: True

Form ties can be made from steel rods, straps, wire, fiberglass, or other plastics. Ans:
True

Form ties can be made from steel rods, straps, wire, fiberglass, or other plastics. Ans:
True

Precast wall panels cannot be solid. Ans: False

Sustainable buildings discourage the collaborative processes. Ans: False

Building codes regulate life safety and health. Ans: True

Foundations must transmit building loads to the rock or soil on which the building
rests. Ans: True

Portland cement is the binding agent in concrete. Ans: True

Slab reinforcing and it's bars are placed on the bottom portion of the slab. Ans: False

High strength concrete is between 6000 psi and 20000 psi. Ans: True

, Clays are very small particles, with larger surface area. Ans: True

owner hires single design and construction entity. Ans: design/build

method combines owner, design, and construction teams into one legal entity. Ans:
single purpose entity

provides financing as well as construction services. Ans: turnkey

owner hires design team and construction team separately. Ans: design/bid/build

owner hires independent construction company to oversee design and construction
services. Ans: construction management

molds that hold the concrete and are returned to a lab for evaluation. Ans: test
cylinders

separation of the large aggregates from the finer portions of the mix. Ans: segregation

a rough measure of the workability of wet concrete as it arrives on site. Ans: slump
test

eliminates voids and air pockets within the concrete. Ans: consolidation

satisfies more stringent structural requirements. Ans: high strength concrete

made with conventional ingredients. Ans: normal strength concrete

concrete hardens through chemical bonding of water and cement. Ans: curing




© Get it right 2025 Getaway - Stuvia US All rights reserved

Información del documento

Subido en
25 de octubre de 2025
Número de páginas
13
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Shinnie
3.6
(7)
Vendido
24
Seguidores
0
Artículos
4121
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes