• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 26 páginas
Examen

[NHIE Exam Practice Test (2025 Edition)] – [National Home Inspector Examination] | Complete [100 Questions & Verified Answers + Explanations] | Updated [2025–2026 Home Inspection Certification Prep Guide]

Document preview thumbnail
Vista previa 3 fuera de 26 páginas

[NHIE Exam Practice Test (2025 Edition)] – [National Home Inspector Examination] | Complete [100 Questions & Verified Answers + Explanations] | Updated [2025–2026 Home Inspection Certification Prep Guide]

Vista previa del contenido

NHIE EXAM WITH 100 QUESTIONS AND ANSWERS


1. Buckling in horizontal vinyl siding is generally caused by

A. reflected sunlight.

B. improper fastening.

C. condensation in walls.

D. improper house wrap. - ANSWER improper fastening

2. At what level would water pressure within a single-family dwelling begin to be considered
excessive and require correction?

A. 60 psi

B. 80 psi

C. 100 psi

D. 120 psi - ANSWER 80 psi

3. A newer home with electric heat is being inspected. It has a below grade finished basement
containing a bedroom. The inspector should look for a smoke alarm and

A. an escape and rescue opening.

B. a carbon monoxide alarm.

C. a fire extinguisher.

D. a safety ladder. - ANSWER an escape and rescue opening

4. A swimming pool fence must prevent passage of a sphere that is larger than

A. 2 inches.

B. 3 inches.

C. 4 inches.

D. 5 inches. - ANSWER 4 inches

5. Refer to the photograph to answer this question. What should an inspector recommend to

,the client regarding the conditions shown in relation to the downspout/rain leader?

A. Nothing, the downspout is properly installed.

B. Gravel should be installed under the downspout.

C. The downspout should be moved away from the siding.

D. A contractor should evaluate the downspout and recommend repairs.A contractor should
evaluate the downspout and recommend repairs - ANSWER

6. If water infiltration is suspected behind a finished surface. What tool would be the best
choice to verify dampness?

A. an infrared thermometer

B. a pin-type moisture meter

C. a non-contact moisture meter

D. a digital camera - ANSWER a non-contact moisture meter

7. Gas-fired furnace heat exchangers most often fail from

A. low temperatures.

B. lack of use.

C. improper gas pressure.

D. rust and metal fatigue. - ANSWER rust and metal fatigue.

8. Relative Humidity (RH) is expressed as

A. volume.

B. percentage.

C. capacity.

D. temperature. - ANSWER percentage.

9. Connections of dissimilar metal in a plumbing system, such as galvanized steel pipe and
copper pipe, will usually cause

A. reduced water pressure.

B. decreased water quality.

, C. glazed pipes.

D. electrolysis. - ANSWER electrolysis.

10. A Ground fault circuit interrupter (GFCI) is a safety device that

A. disconnects power when the grounding to the outlet is faulty.

B. detects moisture and disconnects power in wet locations.

C. disconnects the power when sensing current leakage to ground.

D. protects against electrical surges and voltage spikes. - ANSWER disconnects the power
when sensing current leakage to ground

11. An electrical system with a fuse on the neutral conductor and on the energized (hot)
conductors

A. is twice as safe as a system where only the energized (hot) conductors are fused.

B. should have the neutral conductor fuse sized to one half the normal ampacity for the
circuit.

C. is overfused up to 50% if used only for lighting.

D. is hazardous and should be corrected. - ANSWER is hazardous and should be corrected

12. To operate a central air conditioner, an electric clothes dryer, and an electric range, the
ampacity

of the service to the house should be AT LEAST

A. 100 amps at 120 volts.

B. 125 amps at 120 volts.

C. 60 amps at 240 volts.

D. 100 amps at 240 volts. - ANSWER D

13. A floor joist in a crawl space has been cut where the toilet drain passes through the floor.
The joists are 2x6 spaced at 16" on center. The inspector should recommend that

A. the buyer monitor the floor. Floor systems such as this have redundant framing and

removal of one joist is insignificant.

B. a contractor should support the cut joist with new piers and posts from below.

Información del documento

Subido en
24 de octubre de 2025
Número de páginas
26
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$21.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
completeguide
3.0
(4)
Vendido
1043
Seguidores
1
Artículos
387
Última venta
3 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes