Economizer - ANSWER ✓ Mechanical device intended to reduce energy
consumption be regulating the amount of ventilation airflow being introduced to
the building and controlling the building static pressure by using rcool outside air
as a means of cooling the indoor space."
[BOK - Operations and Maintenance, Plant Management, Capital Renewal and
Deferred Maintenance]
Feedback - ANSWER ✓ "Information needed to measure the result of a change
that has been made within the building control system."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Humidistat - ANSWER ✓ "An electronic device analogous to a thermostat but this
device responds to relative humidity, not temperature."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Graphical User Interface - ANSWER ✓ "Provides visual images of the various
controlled systems with data directly readable on the screen."
,[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Land Use Inventory - ANSWER ✓ "Contains quantitative information about the
campus landscape, such as the square footage of lawns , plantings beds, and
perennial beds."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Rain Sensor - ANSWER ✓ "Allows the irrigation system to turn itself on and off
at certain times of the day and controls the length of time each area is watered."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Prunning - ANSWER ✓ "Should only be done to remove dead or damaged
branches, retain original plant shape, control the size of the plant, or renew the
plant."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Thatch - ANSWER ✓ "Causes a roof effect and reduces the chances of air and
water reaching the roots of the grass plants. Mowing frequencies and other cultural
practices can reduce the buildup."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Paved Surfaces - ANSWER ✓ "Ranges from loose gravel to hand-laid tile or
exposed aggerate surfaces. A common problem is the lack of drainage."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Intergrated Pest Management (IPM) - ANSWER ✓ "Multidimensional approach
to pest management that evolved to address the ecological, social, and economic
implications of overreliance on chemical pest control."
,[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Computerized Maintenance Management System (CMMS) - ANSWER ✓ "A
system designed to issue preventive maintenance (PM) work orders automatically,
typically based on elapsed time. This information is intended to help maintenance
workers do their jobs more effectively and to help management make informed
decisions."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Heating, Ventilation, and Air Conditioning (HVAC) - ANSWER ✓ "A building
system designed to address the following needs: humidity and temperature control,
fresh air, and ventilation for human thermal comforts."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
APPA's Level of Appearance - ANSWER ✓ "Creates a common language for
facilities professionals to use when making a direct correlation between appearance
levels and staffing."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Work/Order Management System - ANSWER ✓ "A deliberate process in which a
scope of work is identified , selected, planned, scheduled, executed, closed and
critiqued."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Waste Stream Analysis - ANSWER ✓ "A systematic study of the waste disposal
process. Represents the life cycle of waste from when it comes on to campus until
its eventual disposition.
, [ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Current Replacement Value (CRV) - ANSWER ✓ The total expenditure in current
dollar's required to replace any facility at the institution, including construction
costs, design cost, projects management cost, infrastructure costs and project
administrative costs."
[ref. BOK - Operations and Maintenance, Building Systems, Building Control
Systems]
Municipal Solid Waste Management(MSW) - ANSWER ✓ "Requires an
integrated approach that relies on the hierarchy of reduction, reuse, recycling, and
disposal to effectively manage an institution's municipal solid waste."
[BOK - Operations and Maintenance, Plant Services, Solid Waste and Recycling]
Irrigation Systems - ANSWER ✓ "Provide a cheap insurance policy for new plant
and turf installation but also serves as a potential source of labor and solar savings
over time."
[BOK - Operations and Maintenance, Plant Services, Solid Waste and Recycling]
Solid Waste - ANSWER ✓ "Consists of any discarded of abandoned materials.
can be solid. liquid, or semi-solid or containerized gaseous material."
[BOK - Operations and Maintenance, Plant Services, Solid Waste and Recycling]
Flow Control - ANSWER ✓ "The designation of approved disposal sites for
various categories of MSW, including recyclables, by local or state authorities."
[BOK - Operations and Maintenance, Plant Services, Solid Waste and Recycling]
Integrated Approach to Waste - ANSWER ✓ "Entails considering the type ,
location and quantity of wastes generated and the available disposal options. At the
core of this approach is the notion that not all wastes are created, nor should they
be disposed of, equally."
[BOK - Operations and Maintenance, Plant Services, Solid Waste and Recycling]