CQM-C Mastery 2025/2026: Complete Construction Quality Management Exam Prep Guide 500
Verified Practice Questions, Expert Answers & Detailed Solutions — Graded A+ for Guaranteed
Success




1.​ Which document typically defines the contractor’s quality control (CQC) organization and
responsibilities?​
A. Contract Data Requirements List (CDRL)​
B. Contract Quality Control Plan (CQCP)​
C. Request for Information (RFI)​
D. Submittal Register​
Answer: B. Contract Quality Control Plan (CQCP)​
Rationale: The CQCP (or CQC plan) is the contractor’s document describing
organization, responsibilities, and QC procedures.



2.​ During which phase does the contractor perform preparatory actions before work starts
on a specific activity?​
A. Follow-up phase​
B. Initial phase​
C. Preparatory phase​
D. Acceptance phase​
Answer: C. Preparatory phase​
Rationale: Preparatory phase includes planning, resource allocation, submittals, and
pre-task briefings before execution.



3.​ Which of the following is a primary responsibility of the Contracting Officer’s
Representative (COR) or Government Quality Assurance (GQA)?​
A. Develop the contractor’s QC plan​
B. Provide independent verification that contract requirements are met​
C. Supervise contractor employees directly​
D. Replace the contractor’s superintendent​
Answer: B. Provide independent verification that contract requirements are met​
Rationale: GQA/COR performs independent oversight and acceptance, not contractor
management.



4.​ What is the main purpose of a submittal (shop drawings, product data, etc.)?​
A. To create a procurement document for suppliers​
B. To obtain the government’s review and acceptance of proposed materials or methods​
C. To substitute contract requirements with cheaper options​
D. To serve as the final as-built drawings​
Answer: B. To obtain the government’s review and acceptance of proposed

,CQM-C Mastery 2025/2026: Complete Construction Quality Management Exam Prep Guide 500
Verified Practice Questions, Expert Answers & Detailed Solutions — Graded A+ for Guaranteed
Success
materials or methods​
Rationale: Submittals allow the government to review compliance with contract
requirements prior to installation.



5.​ Which three phases describe the contractor’s control process for an activity?​
A. Planning, Execution, Closeout​
B. Preparatory, Initial, Follow-up​
C. Design, Procurement, Construction​
D. Acceptance, Rework, Demobilization​
Answer: B. Preparatory, Initial, Follow-up​
Rationale: CQM-C standard control phases are preparatory, initial, and follow-up.



6.​ A deficiency is discovered during follow-up inspection. What should the contractor do
first?​
A. Notify the COR and stop work immediately​
B. Record the deficiency, correct it per procedure, and document actions taken​
C. Ignore it if it is minor​
D. Wait for the government to issue a cure notice​
Answer: B. Record the deficiency, correct it per procedure, and document actions
taken​
Rationale: Contractor must identify, correct, and document deficiencies as part of QC.



7.​ Which method is best for tracking corrective actions and their due dates?​
A. Verbal briefings only​
B. A written deficiency log / punch list with responsible party and due date​
C. Emailing each stakeholder separately without centralization​
D. Relying on memory of the superintendent​
Answer: B. A written deficiency log / punch list with responsible party and due
date​
Rationale: Centralized written tracking ensures accountability and follow-through.



8.​ The QC inspector finds installed items that deviate from approved submittals. The
contractor should:​
A. Remove the items immediately and replace without notifying anyone​
B. Stop all work on the project​
C. Notify the project manager, tag the nonconformance, and implement corrective action
per CQCP​

,CQM-C Mastery 2025/2026: Complete Construction Quality Management Exam Prep Guide 500
Verified Practice Questions, Expert Answers & Detailed Solutions — Graded A+ for Guaranteed
Success
D. Wait for the government to find the issues first​
Answer: C. Notify the project manager, tag the nonconformance, and implement
corrective action per CQCP​
Rationale: Formal notification and documented corrective action are required.



9.​ What information is essential in a daily QC report?​
A. Weather, personnel, work performed, inspections, deficiencies, and planned work​
B. Only the number of workers on site​
C. Personal opinions of the QC inspector​
D. Vendor invoices​
Answer: A. Weather, personnel, work performed, inspections, deficiencies, and
planned work​
Rationale: Daily QC reports document conditions, activities, inspections, and issues.



10.​Who typically approves the contractor’s CQC plan?​
A. The project superintendent only​
B. The Contracting Officer or designated COR/GQA​
C. The subcontractor’s foreman​
D. The material supplier​
Answer: B. The Contracting Officer or designated COR/GQA​
Rationale: Government reviews and accepts (or comments on) the contractor’s plan.



11.​Which is a valid objective of the CQC program?​
A. Replace government oversight entirely​
B. Ensure work meets contract requirements and minimize corrective work​
C. Reduce contractor costs by eliminating inspections​
D. Increase change orders for profit​
Answer: B. Ensure work meets contract requirements and minimize corrective
work​
Rationale: CQC’s goal is compliance and prevention of rework.



12.​What is the best definition of a “nonconformance”?​
A. Any item that exceeds contract requirements​
B. Deviation from contract-specified requirements, drawings, or approved submittals​
C. Minor differences in paint shade that are acceptable​
D. A suggestion for improvement​
Answer: B. Deviation from contract-specified requirements, drawings, or

, CQM-C Mastery 2025/2026: Complete Construction Quality Management Exam Prep Guide 500
Verified Practice Questions, Expert Answers & Detailed Solutions — Graded A+ for Guaranteed
Success
approved submittals​
Rationale: Nonconformance denotes failure to meet specified requirements.



13.​An RFI (Request for Information) should be used when:​
A. The contractor needs formal clarification of contract documents affecting
performance​
B. The contractor wants to request payment​
C. The contractor wants to change subcontractors​
D. The QC inspector wants to issue a daily report​
Answer: A. The contractor needs formal clarification of contract documents
affecting performance​
Rationale: RFIs request clarifications or interpretations of contract documents.



14.​What is the purpose of hold points in construction?​
A. To allow the contractor to delay work indefinitely​
B. Mandatory points where work cannot proceed until inspection/approval occurs​
C. Suggestions for optional quality checks​
D. Points where subcontractors take a break​
Answer: B. Mandatory points where work cannot proceed until
inspection/approval occurs​
Rationale: Hold points require formal government inspection/approval before
continuing.



15.​Which records are typically kept as part of the project quality records?​
A. Submittals, inspection reports, test results, nonconformance reports, certifications​
B. Personal notes of site laborers only​
C. Supplier marketing brochures​
D. Unrelated company financial statements​
Answer: A. Submittals, inspection reports, test results, nonconformance reports,
certifications​
Rationale: These are essential documents showing compliance and testing.



16.​Which sampling method is appropriate for quality control testing of concrete cylinders?​
A. No sampling needed​
B. Random or statistically representative sampling per specification​
C. Only test the first cylinder of the project​
D. Test only if the government requests it months later​

Información del documento

Subido en
8 de octubre de 2025
Número de páginas
43
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
21
Seguidores
30
Artículos
517
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes