CQM-C QUESTIONS AND ANSWERS

Document preview thumbnail
Vista previa 1 fuera de 3 páginas

CQM-C QUESTIONS AND ANSWERS

Vista previa del contenido

CQM-C QUESTIONS AND ANSWERS

The purpose of Construction Quality Management is to: - Answer -Achieve the quality
established by properly developed requirements through the combined responsibility,
but seperate efforts of contractpr smd government personnel.

Construction Quality Management is the performance of tasks, which ensure that
construction is performed. - Answer -According to plans and specifications, on time,
within a defined budget and a safe work environment.

Partnering relationships are based upon: - Answer -Building trust and dedication to
common goals

It is the responsibility of Quality Assurance Personnel to: - Answer -Periodically verify
that the contractors system of control is working effectively.

An effective contractor quality control program will: - Answer -Be an incentive for work
to be done correctly the first time resulting in earlier completion, reduced field overhead
costs, and greater profits.

If there is a disagreement whether the contractors work complies with the contract: -
Answer -The government makes the final determination

Characteristics that describe a definable feature of work include: - Answer -Cross-
referenced listings to the contractors construction schedule that may have more than
one definable feature under a section of the specifications.

The _____________________ consists of daily checks of the work to assure continuing
compliance with contract requirements. - Answer -Follow-up phase

The Quality Assurance Plan: - Answer -Is a government management tool establishing
staffing, training, pre-award activities, and surveillance activities.

Testing is extremely important in construction quality management and is performed by:
- Answer -Both the contractor and the government

If the contractor does not provide an adequate superintendent, the contract allows the
contracting officer to: - Answer -Require the contractor to assume personal supervision
of the work.

The Quality Control Plan: - Answer -Is the foundation upon which quality work is based
and outlines planned quality control procedures.

Tests that are unannounced, randomly performed, and repeat quality control tests are: -
Answer -Quality Assurance tests

Información del documento

Subido en
7 de octubre de 2025
Número de páginas
3
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Greaterheights
4.0
(223)
Vendido
1165
Seguidores
882
Artículos
20660
Última venta
4 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes