Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

SAFe Training for RTE Exam Questions and Answers 100% Pass | Verified and Updated

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

SAFe Training for RTE Exam Questions and Answers 100% Pass | Verified and Updated

Vista previa del contenido

SAFe Training for RTE
Study online at https://quizlet.com/_hurdgf

1. SAFe: Scaled Agile Framework for Enterprises
2. RTE: Release Train Engineer
3. RTE Responsibilities: 1. Managing and optimizing the flow of value through the ART
2. Fostering collaboration between teams and system-level stakeholders
3. Facilitating PI Planning readiness and the event itself
4. Tracking and communicating key ART execution metrics
5. Escalating and tracking ART impediments
6. Facilitate relentless improvement for the ART
7. Coach leaders, teams, and Scrum Masters in Lean-Agile practices and the Lean-Agile Mindset
8. Facilitate Program Kanban Feature development
4. Agile Release Train (ART): A long-lived and cross-functional team-of-Agile-teams, which along with other
stakeholders, develops and delivers solutions incrementally, using a series of fixed-length Iterations within a Program
Increment (PI) timebox. Aligns teams to a common business and technology mission.
5. SAFe Core Values: - Alignment
- Transparency
- Built-in Quality
- Program Execution
6. Describe the flow of value through the SAFe configurations: The Continuous Delivery
Pipeline represents the flow of value from concept to delivery
7. SAFe Lean-Agile Principles (9 total): 1 - Take an economic view
2 - Apply Systems Thinking
3 - Assume variability; preserve options
4 - Build incrementally with fast, integrated learning cycles
5 - Base milestones on objective evaluation of working systems
6 - Visualize and limit WIP, reduce batch sizes, and manage queue lengths
7 - Apply cadence, synchronize with cross-domain planning
8 - Unlock the intrinsic motivation of knowledge workers
9 - Decentralize decision-making
8. Without a shared understanding of priciples: - There is no systematic way to adapt practices
to local context
- Business outcomes do not significantly improve
- Practices and measures that were once beneficial become problematic
1/5

, SAFe Training for RTE
Study online at https://quizlet.com/_hurdgf

- Lean-Agile Mindset is unachievable
- Conflict and disagreement on processes and practices are difficult to resolve.
9. Attributes of an effective ART organization: ART consists of 5-12 virtual teams (total of 50-125
individuals) that are organized around a flow of value and that plan, commit, and execute together
10. Dunbar's number: suggested cognitive limit to the number of people with whom one can maintain stable
social relationships
11. Product Manager: Owns, defines, and prioritizes the Program Backlog
12. ART leadership: System Arch/Eng
Product Mgmt
RTE
13. Product Manager Primary Responsibilities: 1. Understanding the customer needs; and vali-
date solutions
2. working with system architect/engineering to understand the value of enablers
3. developing and communicating ART Vision and roadmap
4. managing and prioritizing the flow of work to the ART
5. preparing for and participating in the PI Planning
6. Participating in demos and Inspect and Adapt
7. Building and effective Product Manager/Product Owner team
14. System Architect Responsibilities: 1. Working with teams on the ART to define subsystems and
their interfaces
2. establishing critical NFRs at the solution level; participate in the definition of others
3. defining, exploring, and supporting the implementation of enablers
4. planning and developing the architectural runway
5. working with PM to determine capacity allocation
6. supervising and fostering built-in quality
15. Business Owner Responsibilities: 1. Ensure that business objectives are comprehended and
agreed to by key stakeholders of the train
2. Play a primary role in PI Planning activities and assign Business Value to Objectives
3. Watch for external commitments and dependencies
4. Attend the system and/or solution demo to view progress and provide feedback
5. Help drive investment to the continuous delivery pipeline
6. help align a devOps culture of shared responsibilities
2/5

Información del documento

Subido en
5 de octubre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
SophiaBennett
3.6
(29)
Vendido
155
Seguidores
5
Artículos
9092
Última venta
3 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes