Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 17 páginas
Examen

ARM 401-5 HAZARD RISK UPDATED ACTUAL Questions and CORRECT Answers

Document preview thumbnail
Vista previa 3 fuera de 17 páginas

ARM 401-5 HAZARD RISK UPDATED ACTUAL Questions and CORRECT Answers

Vista previa del contenido

ARM 401-5 HAZARD RISK UPDATED ACTUAL Questions and CORRECT
Answers

1. Real Property 1. Land
2. Buildings and other structures

2. Land two types: improved and unimproved

3. Unimproved includes undeveloped real estate such as woodland, farmland, and vacant lots
Land
value may lie in water, minerals, commercial attraction, plants, animals, location,
or other hard-to-value elements

4. Improved land real estate w/ man made alterations

5. Building permanent structure w/ walls and a roof

categorized by the type of construction and how well that construction w/stands
different hazards

6. Other structures include anything else that is built or under construction

considerations in property risk assessment include occupancy, exposure, haz-
ardous substances and heat-generating equipment

7. Occupancy # of people, their ages, physical conditions, and familiarity w/ the location

presence of machinery, vehicles, combustible materials, and other hazards

8. Exposure to weather, vandalism, and crime

9. Intangible Per- has no physical substance, hence is not able to be touched
sonal Property

10. Tangible Person- has physical substance, can be touched
al Property

11.

, Why are vehicles a. collision losses are different than other types of losses to personal property
licensed for use
on public roads AND
treated separate-
b. vehicle operation is the biggest source of liability loss for individuals and
ly for purposes of
businesses
risk assessment
and insurance?

12. Intangible Prop- includes patents, copyrights, trademarks, leases, and trade secrets
erty
RM and insurance inc. focused on protecting reputation

13. Two Classes of 1. Natural
Risk Sources 2. Human

14. Natural Risk involve events beyond human control
Sources
ex. fire, flood, disease, storms

frequency and severity of natural perils determined by nature

RM has little effect on reducing the likelihood of an event, but loss reduction
measures can control some of the consequences

15. Human Risk involve events dependent on the actions or inactions of individuals or small
Sources groups

theft, vandalism, negligence, incompetence, riot

frequency and severity controlled through responsible individual actions, societal
mores, and gvmt sanctions

16. Windstorm




, a storm that involves violent wind w/ little or no rain

greatest threat is to building damage and collapse

17. Windstorm a. design buildings and other structures to w/stand anticipated winds
Pre-loss disaster b. obtain wind-rated shutters and blinds for windows and other openings
recovery actions c. maintain roof and wall systems in good condition; provide support for outside
structures
d. secure outdoor materials and equip

18. Windstorm a. use spare construction materials to temporarily repair damage and to reduce
post-loss further exposure to the elements
disaster recovery
actions b. guard the premises to prevent looting and vandalism

19. Tornado a localized windstorm occurring over land and characterized by a funnel-shaped
cloud that extends toward the ground and rotates at speeds of up to 300 MPH

most structures not designed to w/stand

20. Tornado pre-loss a. build underground tornado shelters in areas subject to tornados
disaster recovery b. take shelter to prevent BI
actions

21. Tornado a. begin search and rescue
post-loss b. complete temporary reparis to avoid additional PD
recovery c. use caution near downed power lines
procedures d. start salvage procedures

22. Earthquake a destructive seismic event that occurs along a fault line (where tectonic plates of
the earth's surface meet)

23. a. choose an appropriate geographic location
b. build or buy earthquake-resistant buildings

Información del documento

Subido en
5 de octubre de 2025
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES
4.0
(235)
Vendido
1532
Seguidores
109
Artículos
107162
Última venta
9 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes