• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 32 páginas
Examen

Erosion and Sediment Control Exam Prep Questions and Answers

Document preview thumbnail
Vista previa 4 fuera de 32 páginas

Erosion and Sediment Control Exam Prep Questions and Answers

Vista previa del contenido

Erosion and Sediment Control Exam Prep
Questions and Answers
Minimum Standard 1

Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within seven days

after final grade is reached on any portion of the site; temporary soil stabilization shall be applied

within seven days to denuded areas that may not be at final grade but will remain dormant for

longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant

for more than one year

Site NOT at Final Grade

- stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year

Site at Final Grade

- stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw

Minimum Standard 2

,Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected with

sediment trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts

and detains from disturbed areas

Minimum Standard 3

Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise permanently

stabilized (permanent vegetation shall not be considered established until a ground cover is

achieved that is uniform, mature enough to survive, and will inhibit erosion there is no %

associated with this)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety

Minimum Standard 4

First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to

,trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made

functional before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for equipment to

install the perimeter controls, but site clearing and grading should be kept to a minimum until the

perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during construction

operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-

to-moderate level channel flow

Perimeter Controls

assures that sediment does not leave the perimeter of the land-disturbing area once site clearing,

grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary

diversions, diversions

Minimum Standard 5

Earthen Structure Stabilization



stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions

immediately after installation

, reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream

or off-site areas

Minimum Standard 6

Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total drainage area

(not just disturbed area) to be served by the trap or basin

Sediment Traps

minimum storage capacity shall be 134 cubic yards per acre of drainage area and shall only

control drainage areas less than 3 acres



stone outlet = trap

Sediment Basins

surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or

equal to 3 acres shall be controlled by a basin; minimum storage capacity of a sediment basin

shall be 134 cubic yards per acre of drainage area; the outfall system shall, at a minimum,

maintain the structural integrity of the basin during a 25-year storm of 24-hour duration; runoff

coefficients used in runoff calculations shall correspond to a bare earth condition or those

conditions expected to exist while the sediment basin is utilized.

Sediment Trapping Devises

Información del documento

Subido en
25 de septiembre de 2025
Número de páginas
32
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUINTER
3.6
(73)
Vendido
420
Seguidores
105
Artículos
39867
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes