NICET Highway Construction Inspector Level III Practice Exam 1 with correct answers

Document preview thumbnail
Vista previa 3 fuera de 19 páginas

NICET Highway Construction Inspector Level III Practice Exam 1 with correct answers

Vista previa del contenido

NICET Highway Construction Inspector Level
| | | | |




III Practice Exam 1 with correct answers
| | | | | |




During |installation |of |traffic |loops |in |the |pavement, |which |three |statements |apply |prior |to |and
|during |the |installation |of |loop |wire? |(Choose |3).




a) |Do |not |allow |vehicular |traffic |over |an |open |saw |cut.

b) |Do |not |overlap |saw |cuts |at |the |corner.

c) |Thoroughly |clean |the |saw |cut |of |foreign |material.

d) |Use |a |plastic |sleeve |where |loop |wire |crosses |a |joint. |- | |correct |answers |a) |Do |not |allow |
vehicular |traffic |over |an |open |saw |cut.

c) |Thoroughly |clean |the |saw |cut |of |foreign |material.

d) |Use |a |plastic |sleeve |where |loop |wire |crosses |a |joint.



The |contractor |is |installing |a |culvert |with |a |12-inch |reinforced |concrete |pipe |( |outside |
diameter |of |16.50 |inches) |from |Sta |10+00, |40 |feet |Left |to |STA |10+00, |65 |feet |Right |on |4-inch |
bedding |material. |The |12-inch |RCP |outlet |is |to |be |installed |at |Sta |10+00, |40 |feet |Left |at |an |
invert |elevation |of |652.50.



If |the |conduit |is |installed |at |a |1.40% |slope, |what |is |the |elevation |of |the |foundation |grade |at |
Sta |10+00, |45 |feet |Right?



a) |652.04

b) |653.17

c) |653.36

d) |653.50 |- | |correct |answers |?

,On |the |reservoir |side |of |a |dam, |erosion |protection |against |wave |action |should |extend |up |the |
slope |to |at |least |which |level?



a) |crest |of |dam

b) |maximum |water |elevation

c) |minimum |water |elevation

d) |two-thirds |the |height |of |the |dam |- | |correct |answers |b) |maximum |water |elevation



During |stage |construction |while |installing |drainage, |the |contractor |must |complete |which |two |
of |the |following |tasks? |(Choose |two).



a) |Bulk |head |the |pipe |until |the |system |is |complete.

b) |Complete |the |entire |system |before |it |rains.

c) |Maintain |the |existing |drainage |system |until |the |new |system |is |functional.

d) |Provide |temporary |connections |as |needed |to |maintain |the |existing |system. |- | |correct |
answers |c) |Maintain |the |existing |drainage |system |until |the |new |system |is |functional.

d) |Provide |temporary |connections |as |needed |to |maintain |the |existing |system.



After |flushing |but |before |connecting |a |new |main |to |the |existing |system, |what |test |does |an |
inspector |need |to |verify |before |placing |the |main |into |service?



a) |bacteriological |testing

b) |cover |testing

c) |deflection |testing

d) |pressure |testing |- | |correct |answers |d) |pressure |testing

, Which |three |types |of |inspections |are |completed |for |sign |structures? |(Choose |three).



a) |final |inspection

b) |interim |inspection

c) |initial |inspection

d) |routine |inspection |- | |correct |answers |b) |interim |inspection

c) |initial |inspection

d) |routine |inspection



How |many |times |per |foot |should |loop |lead-in |wires |be |twisted?



a) |3 |turns |per |foot

b) |5 |turns |per |foot

c) |6 |turns |per |foot

d) |7 |turns |per |foot |- | |correct |answers |b) |5 |turns |per |foot



Which |phrase |is |true |of |test |reports |required |for |concrete |sidewalks, |asphalt |pavement, |
concrete |curb, |and |pipe |culverts |for |rest |areas?



a) |50% |required |on |roadway |contracts

b) |required |for |federal-aid |projects |only

c) |same |as |roadway |contracts

d) |submitted |in |duplicate |- | |correct |answers |?



According |to |FP-14, |when |removing |existing |concrete |structure |in |the |roadbed, |how |many |
inches |below |the |subgrade |elevation |should |the |existing |structure |be |removed |to?

Información del documento

Subido en
19 de septiembre de 2025
Número de páginas
19
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
lectjones
4.0
(3)
Vendido
21
Seguidores
2
Artículos
2319
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes