Examen

Final Estimates Level 1 EXAM WITH QUESTIONS AND WELL DETAILED ANSWERS|| GRADED A+||LATEST UPDATE 2025/26

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

Final Estimates Level 1 EXAM WITH QUESTIONS AND WELL DETAILED ANSWERS|| GRADED A+||LATEST UPDATE 2025/26

Vista previa del contenido

Final Estimates Level 1 EXAM WITH QUESTIONS AND
WELL DETAILED ANSWERS|| GRADED A+||LATEST
UPDATE 2025/26

T/F: A major function of the DOT is to carry out Construction and Reconstruction

programs to provide the public with adequate transportation service. -

CORRECTANSWER True



For DOT management of construction and reconstruction projects includes the following

specific responsibilities:

A. Planning, Programming, and Design

B. Contract Administrations

C. Contractor Payments

D. Design and Contract Management

E. All of the above -CORRECTANSWER E. All of the above



T/F: To pay for work performed by contractors, progress and Final Estimates are

needed? -CORRECTANSWER True



Which of the following is not officially considered a "Contract Document"?

A. Supplemental Agreements and Work Orders

B. Notebooks and Estimates Procedure Manual.

C. Standard Specifications.

D .Construction Manual.

,E. CORRECTANSWERs B & D. -CORRECTANSWER E. CORRECTANSWERs B & D.



Between printings of the Standard Specifications, what does the Department publish to

identify and describe changes in the Specifications?

A. CPAM

B. Supplemental Specifications

C. Work Orders

D. Specification Changes -CORRECTANSWER B. Supplemental Specifications



Select the correct sequence of documents in order of precedence, with the document

highest in authority listed first.

A. Contract Plans, Development Specifications, Standard Specifications, Special

Provisions, Technical Special Provisions, Supplemental Specifications, Design

Standards.

B. Design Standards, Special Provisions, Technical Special Provisions, Supplemental

Specifications, Contract Plans, development Specifications, Standard Specifications.

C. Special Provisions, Technical Special Provisions, Contract Plans, Design Standards,

Development Specifications, Supplemental Specifications, Standard Specifications.

D. Supplemental Specifications, Special Provisions, Contract Plans, Development

Specifications, Standards Specifications, Technical Special Provisions, Design

Standards.

, E. None of the above. -CORRECTANSWER C. Special Provisions, Technical Special

Provisions, Contract Plans, Design Standards, Development Specifications,

Supplemental Specifications, Standard Specifications.



True or False. When checked and verified, final estimates serve as the basis for Final

Payment. -CORRECTANSWER True



Which of the following sets for the Department's methods and Procedures for preparing

and checking final estimates?



A. Construction Inspection Mathematics

B. Project Engineer

C. Preparation and Documentation Manual

D. CPAM -CORRECTANSWER C. Preparation and Documentation Manual



Please match the appropriate documentation name with the correct description below:

A. [Final Plans]: For reviewing contract time charges before clearing estimates for final

payment; [Computation Books]: Documents pertinent changes during construction and

show the "as-built' condition; [Field Books]: Contains alignment notes and cross section

notes, etc.

B. [Construction Diaries]: For reviewing contract time charges before clearing estimates

for final payment; [Final Plans]: Documents pertinent changes during construction and

Información del documento

Subido en
19 de septiembre de 2025
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$23.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PrepPulse1
4.3
(30)
Vendido
289
Seguidores
6
Artículos
4056
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes