API 1169 TEST QUESTIONS WITH
100% CORRECT ANSWERS
Unconnected cylinders shall be stored in an approved storage area, preferably indoors,
but not near a building entrance - Answer-False
The motto for the common ground alliance organization is: "damage prevention is an
individuals responsibility" - Answer-False
Documents prepared for the development of real property and show the alignment of
any existing buried facilities and the presence and extent of any existing easements
and/or ROW are called: - Answer-Plats
The benefits of the designer using all reasonable means of obtaining information about
underground facilities in the area of the planned excavation are: - Answer-1. Facility
relocations are minimized
2. Safety in enhanced
3. Unexpected conflicts with facilities are eliminated
4. Gathering underground facility information and including this information in the
planning phase minimizes the hazards, cost, and work to produce the final project
The purpose of above ground markers is to identify underground facilities, not to locate,
for excavation or circumvent the one call process - Answer-True
Only nondestructive testing personnel shall interpret test results. - Answer-Level
2 or 3
Active corrosion is corrosion that is continuing or not arrested. - Answer-True
When steel butt welding fittings are used, they shall comply to: - Answer-ASME b 16.9,
ASME b16.28, or MSS so-75
Deflections caused by misalignment up to are not considered miter bends. -
Answer-3 degrees
Inspection personnel shall be qualified by and . - Answer-Training,
experience
Case crossings shall be inspected during installation to determine that the carrier pipe is
supported, sealed, and from the casing. - Answer-Insulated
, as used in ASME b31.8 is the portion of the route of a pipeline or main that lies
within, runs in a generally parallel direction to, and does not necessarily cross the rights
of way of a road, street, highway, or railroad. - Answer-Parallel encroachment.
All valves, fittings, flanges, bolting, pipe, and tubing shall be marked in accordance with
the marking sections of the standards and specifications to which the items were
manufactured or in accordance with the requirements of MSS so-25. - Answer-True
Metallic gaskets other than ring type or spirally wound metal gaskets shall not be used
with or lighter flanges. - Answer-ASME class 150
A is a pressure containing component used for repeated access to the interior
of a piping system. - Answer-Quick opening closure
When planning and designing the installation of new or replacement of existing
underground facilities, the designer follows all except: - Answer-The routing demanded
by the local environment association
Using qualified ensures that all contractors who bid and work on a project
employ safe work habits and are capable of performing the requested work - Answer-
Contractors
Crossing angle measured between the existing pipeline and the proposed location of
pipe and is recommended to be as close to as practical - Answer-90 degrees
is the plan deciding between the Owner and Crossing Party to specify the
details and provisions under which the crossing construction shall occur - Answer-
Crossing plan
is the property in which a pipeline company and a landowner both have a
interest. - Answer-Right of way (ROW), legal
All personnel have and should use stop work authority whenever there is a concern for
during the pressure testing operations. - Answer-Safety
Management responsibilities provide for and require that signs, barricaded or other
protective barriers are placed in a manner and at a distance sufficient to demarcate a
safe zone to protect personnel and the public from unanticipated pressure release or
equipment failure - Answer-True
Traceability is defined as the ability to trace the history, application, or location of that
under consideration - Answer-True
is the planning, organizing, monitoring, controlling and reporting of all aspects of
a project. - Answer-Project management
100% CORRECT ANSWERS
Unconnected cylinders shall be stored in an approved storage area, preferably indoors,
but not near a building entrance - Answer-False
The motto for the common ground alliance organization is: "damage prevention is an
individuals responsibility" - Answer-False
Documents prepared for the development of real property and show the alignment of
any existing buried facilities and the presence and extent of any existing easements
and/or ROW are called: - Answer-Plats
The benefits of the designer using all reasonable means of obtaining information about
underground facilities in the area of the planned excavation are: - Answer-1. Facility
relocations are minimized
2. Safety in enhanced
3. Unexpected conflicts with facilities are eliminated
4. Gathering underground facility information and including this information in the
planning phase minimizes the hazards, cost, and work to produce the final project
The purpose of above ground markers is to identify underground facilities, not to locate,
for excavation or circumvent the one call process - Answer-True
Only nondestructive testing personnel shall interpret test results. - Answer-Level
2 or 3
Active corrosion is corrosion that is continuing or not arrested. - Answer-True
When steel butt welding fittings are used, they shall comply to: - Answer-ASME b 16.9,
ASME b16.28, or MSS so-75
Deflections caused by misalignment up to are not considered miter bends. -
Answer-3 degrees
Inspection personnel shall be qualified by and . - Answer-Training,
experience
Case crossings shall be inspected during installation to determine that the carrier pipe is
supported, sealed, and from the casing. - Answer-Insulated
, as used in ASME b31.8 is the portion of the route of a pipeline or main that lies
within, runs in a generally parallel direction to, and does not necessarily cross the rights
of way of a road, street, highway, or railroad. - Answer-Parallel encroachment.
All valves, fittings, flanges, bolting, pipe, and tubing shall be marked in accordance with
the marking sections of the standards and specifications to which the items were
manufactured or in accordance with the requirements of MSS so-25. - Answer-True
Metallic gaskets other than ring type or spirally wound metal gaskets shall not be used
with or lighter flanges. - Answer-ASME class 150
A is a pressure containing component used for repeated access to the interior
of a piping system. - Answer-Quick opening closure
When planning and designing the installation of new or replacement of existing
underground facilities, the designer follows all except: - Answer-The routing demanded
by the local environment association
Using qualified ensures that all contractors who bid and work on a project
employ safe work habits and are capable of performing the requested work - Answer-
Contractors
Crossing angle measured between the existing pipeline and the proposed location of
pipe and is recommended to be as close to as practical - Answer-90 degrees
is the plan deciding between the Owner and Crossing Party to specify the
details and provisions under which the crossing construction shall occur - Answer-
Crossing plan
is the property in which a pipeline company and a landowner both have a
interest. - Answer-Right of way (ROW), legal
All personnel have and should use stop work authority whenever there is a concern for
during the pressure testing operations. - Answer-Safety
Management responsibilities provide for and require that signs, barricaded or other
protective barriers are placed in a manner and at a distance sufficient to demarcate a
safe zone to protect personnel and the public from unanticipated pressure release or
equipment failure - Answer-True
Traceability is defined as the ability to trace the history, application, or location of that
under consideration - Answer-True
is the planning, organizing, monitoring, controlling and reporting of all aspects of
a project. - Answer-Project management