100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

API 1169 Study Guide III Questions with All Correct Answers

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
19-09-2025
Escrito en
2025/2026

API 1169 Study Guide III Questions with All Correct Answers

Institución
API 1169
Grado
API 1169









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
API 1169
Grado
API 1169

Información del documento

Subido en
19 de septiembre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

API 1169 Study Guide III Questions
with All Correct Answers

Where could an inspector find detailed info regarding test pressures and the duration of
the pressure test for a project - Answer-Site specific test procedure

Inspectors are required to make sure a plan is in place for - Answer-Rescue from a
confined space

What are some of the fall protection systems that can be used on work sites - Answer-
Barricades

This legislation covers hazardous substances, site contamination, and cleanup -
Answer-CERCLA

What is typically found on line lists - Answer-Specific agreements between the
landowner and the pipeline owner

The amount of residual air in the hydraulic test section should not exceed - Answer-5%
of the volume

When using a pressure relief valve (pop off valve) it should be set to - Answer-A
pressure just above max test pressure

Typically temperature and pressure data are recorded how often when hydro-testing -
Answer-Every 30 mins throughout the duration of the test

What info on stakes should an inspector understand - Answer-Pipeline stationing

How shall tensile strength (tensile testing) be computed - Answer-Divide the max load at
failure with the smallest cross-sectional area of the specimen

Where can pipeline locating and marking requirements be found - Answer-API 1169

Where might the inspector find landowner requirements such as the removal of
permanent fences - Answer-Line lists

What is the typical distance range between the new pipeline and other existing
structures - Answer-12" to 24"
If the pressure changes in a pipeline section being tested what other change is directly
related to this pressure change - Answer-Volume

, In the CGA best practices an icon of a green square identifies - Answer-Facility owner

What is the minimum stress relieving temperature for ferritic alloy steels - Answer-1200
F

The minimum cover required for a buried liquid pipeline running through a farmers corn
field would be - Answer-48"

Inspectors should have knowledge of OSHA 1926 Subpart P to ensure - Answer-
Ditching/excavations safety plan addresses the threat of cave in

A specimen at failure is observed to have a strength greater than or equal to the SMTS
of the pipe material and meets all soundness criteria but breaks in the weld or fusion
zone. Is the weld acceptable - Answer-Yes acceptable

What are some blasting activities that should be monitored - Answer-Permits and
precautions

Of particular interest to the inspector the following conditions should be noted - Answer-
Coating condition of the pipe

Available records (of underground facilities) should be available to all potential users
especially the - Answer-Locator

What regulation governs the safe working distances of pressure testing piping systems
with liquid petroleum, or inert gas or carbon dioxide operating at hoop stress levels >
50% of the SMYS - Answer-49 CFR 195

During handling, hauling, stringing, or storing the pipe shall not be allowed to - Answer-
Be dropped or strike objects

Inspectors should be aware of the provisions of environmental permits including? -
Answer-The different types and agency jurisdiction

Al B31.8 welders shall be requalified at least - Answer-One each year

Does an increase in minimum specified preheat temp constitute a change in an
essential variable - Answer-No but a decrease is

Notches or laminations in the ends of pipe sections shall - Answer-Not be repaired

Inspectors should be familiar with environmental requirements for crossings of
waterway crossings, water bodies, and wetlands, including - Answer-Understanding of
permit documentation requirements
$15.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
wisdompoint chamberlain college of nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
114
Miembro desde
2 año
Número de seguidores
66
Documentos
5393
Última venta
3 semanas hace
Nursing Tec

3.7

16 reseñas

5
6
4
3
3
5
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes