What regulation governs the safe working distances of pressure testing piping systems
with liquid petroleum, or inert gas or carbon dioxide operating at hoop stress levels >
50% of the SMYS - Answer-49 CFR 195

During handling, hauling, stringing, or storing the pipe shall not be allowed to - Answer-
Be dropped or strike objects

Inspectors should be aware of the provisions of environmental permits including? -
Answer-The different types and agency jurisdiction

Al B31.8 welders shall be requalified at least - Answer-One each year

Does an increase in minimum specified preheat temp constitute a change in an
essential variable - Answer-No but a decrease is

Notches or laminations in the ends of pipe sections shall - Answer-Not be repaired

Inspectors should be familiar with environmental requirements for crossings of
waterway crossings, water bodies, and wetlands, including - Answer-Understanding of
permit documentation requirements

Welding procedures and welders performing work for new construction and out of
service pipeline systems operating at hoop stresses of 20% or more of the specified
minimum yield strength shall be qualified under which standard - Answer-API 1104 or
ASME Sec IX

For test pressures greater than 290 psig it is preferable for the total amount of residual
air in the test section to be - Answer-Less than .2 % of the volume

For pipe less than 2.375 in OD how many test welds shall be performed to obtain th
required number of test specimens - Answer-2

Inspectors should, in terms of handling contamination issues - Answer-Have knowledge
of permitting and monitoring skills

Inspectors should perform a route review in order to - Answer-Know how to observe and
report route selection deficiencies

, When is stress relieving required for welds in all carbon steels - Answer-Nominal wall
thickness exceeds 1-1/4"

Each gas service line must be buried with at least - Answer-12" of cover on private
property and 18" in streets

How is pipeline stationing typically shown - Answer-Hundreds of feet (stations) with
additional footage shown as pluses



All excavations made in type B soil 20' or less in depth which have vertically sided lower
portions shall be - Answer-Required to have the lower portion be shielded or supported
to a height at least 18" above the top of the vertical side

A confined space is? - Answer-A space that can be entered bodily by an individual but
is not designed for continuous occupancy and has limited and restricted means of entry
and exit.

What info concerning position should be noted on the qualified WPS? - Answer-Roll or
position welding

Pipelines are pressure tested to demonstrate - Answer-Their fitness for service

According to OSHA structural ramps for employee access or egress shall be: - Answer-
Designed by a competent person

When making induction bends the pipe diameter shall not be reduced at any point by -
Answer-More than 2.5 %

If the inspector witnesses the suspicious activities on the job site what should happen -
Answer-Report it to the chief inspector, PM or owner/operator

According to API 1169 what is a hazardous atmosphere - Answer-An atmosphere that
may be immediately dangerous to life and health

Who is responsible to inspect and maintain equipment on the work site - Answer-
Contractor

The time between passes shall be designated on the WPS and is a critical period of
time during welding it means? - Answer-The maximum time between the completion of
the root bead and the start of the second bead and between the completion of the
second bead and the start of any subsequent beads.

When there is a possibility of hazardous exposure to radiant energy how far back must
the head area be protected - Answer-A vertical line in the back of the ears

Información del documento

Subido en
16 de septiembre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Perfectscorer
3.6
(75)
Vendido
503
Seguidores
355
Artículos
9443
Última venta
3 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes