API 1169 TEST QUESTIONS WITH
100% CORRECT ANSWERS

When planning and designing the installation of new or replacement of existing
underground facilities, the designer follows all except: - Answer-The routing demanded
by the local environment association

Using qualified ________ ensures that all contractors who bid and work on a project
employ safe work habits and are capable of performing the requested work - Answer-
Contractors

Crossing angle measured between the existing pipeline and the proposed location of
pipe and is recommended to be as close to ______ as practical - Answer-90 degrees

________ is the plan deciding between the Owner and Crossing Party to specify the
details and provisions under which the crossing construction shall occur - Answer-
Crossing plan

________ is the property in which a pipeline company and a landowner both have a
_______ interest. - Answer-Right of way (ROW), legal

All personnel have and should use stop work authority whenever there is a concern for
______ during the pressure testing operations. - Answer-Safety

Management responsibilities provide for and require that signs, barricaded or other
protective barriers are placed in a manner and at a distance sufficient to demarcate a
safe zone to protect personnel and the public from unanticipated pressure release or
equipment failure - Answer-True

Traceability is defined as the ability to trace the history, application, or location of that
under consideration - Answer-True

______ is the planning, organizing, monitoring, controlling and reporting of all aspects of
a project. - Answer-Project management

If process is defined as "set of interrelated or interacting activities which transforms
inputs into outputs", product then becomes "result of a set of interrelated or interacting
activities which transforms inputs into outputs". - Answer-True

, ______ is the specified way to carry out an activity or a process. - Answer-Procedure

Internal concavity is a ______ that is properly fused to and completely penetrates the
pipe wall thickness along both sides of the bevel, but whose center is somewhat below
the inside surface of the pipe wall. - Answer-Bead

Qualified welding procedure - a tested and proven detailed method by which sound
______ with suitable mechanical properties can be produced - Answer-Welds

Before ______ is started, a detailed welding procedure specification shall be
established and qualified to demonstrate that welds with suitable mechanical properties
and soundness can be made by the procedure. - Answer-Production welding

A welding procedure shall be re-established as a detailed welding procedure
specification and shall be completely requalified when any of the essential variables
listed below are changed, except: - Answer-Joint length


Which of the following equipment may NOT be required for a pressure test? - Answer-
Internal line up clamps

Before testing begins, a _____________ with explanatory notes and data should be
prepared. - Answer-Pressure test procedure

The pressure testing of newly constructed liquid pipelines and replaced segments of
existing pipelines should be performed in accordance with: - Answer-ASME, Code of
Federal Regulations and any other applicable governmental regulations.

Before the actual line filling operation, it is advisable to run a ___________ in an effort
to identify geometric abnormalities that may exist in the line prior to the test. - Answer-
Sizing pig, caliper or deformation tool

Personnel conducting a pressure test should keep: - Answer-Complete record of the
test, including details of the test operation and events such as weather variations, test
failures, bleed offs, repressurizations, and so forth

According to API 1169, an inspector is an individual qualified to monitor, assess,
evaluate, verify, discuss, decide, resolve, report, and document pipeline construction
activities to ensure the requirements of the design, drawings, specifications, regulations,
and industry practices are being met safely, efficiently, and in an environmentally sound
manner - Answer-True

Quality assurance includes those activities focused on providing confidence that quality
requirements are considered fulfilled - Answer-True

Información del documento

Subido en
16 de septiembre de 2025
Número de páginas
5
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.39

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Perfectscorer
3.6
(75)
Vendido
503
Seguidores
355
Artículos
9443
Última venta
3 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes