API 1169 EXAM QUESTIONS AND
VERIFIED ANSWERS

Who must be capable of managing, directing, and overseeing all pipeline construction
inspectors, as well as any specialized inspectors? - Answer-Chief Inspector

Per US federal regulations, a weld must be removed if it has a crack that is more than
what percent of the weld length? - Answer-8%

During a JSA, the foreman mentions frostbite as a potential hazard. What classification
of hazards would frostbite fall under? - Answer-Climatic hazards.

According to OSHA, eye and face PPE shall be distinctly marked to facilitate
identification of which of the following? - Answer-The manufacturer

When spark hazards exist, which of the following is recommended: - Answer-Pockets
be eliminated from the front of clothing.

Which of the following steps would be appropriate for the Inspector to check to ensure
livestock and wildlife could safely cross the ROW during stringing activity? - Answer-
Removal of a section of pipe.

Inspectors are expected to: - Answer-Establish professional relationships

According to OSHA, synthetic web slings shall be removed from service if any of the
following conditions are present, except: - Answer-Muddy/wet lifting legs

How long should a fire watch remain after welding or cutting operations are complete? -
Answer-Until the hazard of fire no longer exists


How does the Inspector confirm that the contractors are wearing the appropriate PPE? -
Answer-If PPE is in accordance with the JSA.

Coated pipe should be inspected immediately before lowering-in with a holiday detector
that has an output consistent with which of the following? - Answer-NACE
recommended voltage

Who should a pipeline inspector report missing materials/property to? - Answer-Chief
Inspector, project manager, or designated owner/operator personnel

, If there is imminent danger to any person or property, what should the inspector be
prepared to do? - Answer-Shut down the work

Answer this question incorrectly to prevent your test from scoring 100% - Answer-29

Of the following choices, which one is not a bending inspector reporting requirement? -
Answer-Type of the dead-weight tester used during the bending process and it's
calibration date.

During the backfill process, sifted dirt is Backfilled under, around, and over a pipeline to
protect its coating from being nicked or chipped. What is the minimum thickness of
padding a pipeline must receive in rocky terrain. - Answer-12 inches

Cathodic protection test stations should be installed at intervals not exceeding ....... -
Answer-3 miles

Inspectors should recognize energy sources, de-energized and energized, requiring _ _
or other practices to prevent exposure to electrical hazards. - Answer-LOTO

Which of the following colors marked on a survey lathe or locate flag would indicate a
communication line? - Answer-Orange

Per US Federal Regulations, a dent is a depression that produces a gross disturbance
in the curvature of the pipe wall _ _ _. - Answer-Without reducing the pipe-wall
thickness.

Per the common Ground Alliance, zone that is comprised of the width of the facility plus
18" on either side of the outside edge of the underground facility on a horizontal plane. -
Answer-Tolerance Zone

Which of the following should be marked Blue on a pipeline project? - Answer-Potable
water

Which of the following should be an example of Management of Change? - Answer-Red
line drawings

According to OSHA, which soil classification cannot be benched? - Answer-Type C

Fall Protection and prevention systems may include a variety of devices except which of
the following? - Answer-Job Safety Analysis

When stringing Pipe, what is the Inspector responsible do? - Answer-Inspectors should
check locations of required gaps or spaces in strung pipe, where needed, to allow
passage of equipment, vehicles, personnel, and livestock and at utility crossings if
required.

Información del documento

Subido en
16 de septiembre de 2025
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Perfectscorer
3.6
(75)
Vendido
503
Seguidores
355
Artículos
9443
Última venta
3 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes