WGU D470 Exam • Questions With Expert Solutions
A make-to-order furniture plant sees demand variability spike when sales run
weekly web-promotions. Which inventory-replenishment system best
cushions service-level while minimizing admin effort? Accurate Answer:-
Fixed-point reorder with demand-based lot size
A-category items represent 15 % of SKUs and 80 % margin. Which policy pair
best matches their cost-to-serve? Accurate Answer:- Daily stock checks
& selective forward-pick locations
POS data ↑ 4 %, but the factory plan ↑ 20 %. Which root cause drives this
bullwhip? Accurate Answer:- Order batching
Moving the push-pull decoupling point downstream most clearly __________.
Accurate Answer:- Reduces finished-goods stockouts
Balanced-Scorecard's internal-process lens and SCOR's "make" metrics both
track __________. Accurate Answer:- Cycle time & productivity
Factory Gate Pricing chiefly shifts which cost responsibility from supplier to
retailer? Accurate Answer:- Inbound transport
A high-value pharma shipment needs active temperature control,
door-to-door security, < 48 h transit. Choose mode Accurate Answer:-
Scheduled air-freight
Direct-to-store delivery beats central warehousing when __________.
Accurate Answer:- Shelf-life is very short
Freight Forwarder vs 4PL: which task is unique to a 4PL? Accurate
Answer:- Overseeing multiple 3PL contracts
A wine importer installs a "control tower." The most immediate
planning-horizon benefit is at the __________ level. Accurate Answer:-
Operational weekly
Omnichannel fulfilment raises final-mile cost mainly because of __________.
Accurate Answer:- Drop-density erosion
, A U.S. exporter ships tools to Brazil under DAP Incoterms 2020. Who clears
import customs? Accurate Answer:- Buyer
WTO's Most-Favoured-Nation principle demands __________. Accurate
Answer:- Equal treatment for like goods from any member
An importer disputes anti-dumping duty. Which WTO body hears the appeal?
Accurate Answer:- Dispute Settlement Body
Under the WCO SAFE Framework, "Authorized Economic Operator" status
primarily yields __________. Accurate Answer:- Accelerated border
release
A shipment of raw almonds triggers U.S. APHIS control. Which regulatory focal
point applies? Accurate Answer:- Products of the soil/food & live
animals
Coordinated Border Management Tier 3 emphasizes __________. Accurate
Answer:- Cross-border agency collaboration
A DC handling 6,000 SKUs with small daily picks is moving from batch to
wave-less picking. Biggest expected benefit? Accurate Answer:- Lower
order cycle time
Cantilever racking is chosen for which product mix? Accurate Answer:-
Steel pipes & timber beams
AMRs (autonomous mobile robots) improve which metric first? Accurate
Answer:- Travel labour hours
A 3PL designs a cold-chain warehouse. What external layout objective
outranks cube utilization? Accurate Answer:- Energy-efficient
insulation orientation
The put-away cycle time in a case study runs from 08-May 09:00 (receipt) to
10-May 14:00 (in-location). Customer order arrives 11-May 08:00, ships
11-May 18:00. Cycle time is: Accurate Answer:- 2 days
A make-to-order furniture plant sees demand variability spike when sales run
weekly web-promotions. Which inventory-replenishment system best
cushions service-level while minimizing admin effort? Accurate Answer:-
Fixed-point reorder with demand-based lot size
A-category items represent 15 % of SKUs and 80 % margin. Which policy pair
best matches their cost-to-serve? Accurate Answer:- Daily stock checks
& selective forward-pick locations
POS data ↑ 4 %, but the factory plan ↑ 20 %. Which root cause drives this
bullwhip? Accurate Answer:- Order batching
Moving the push-pull decoupling point downstream most clearly __________.
Accurate Answer:- Reduces finished-goods stockouts
Balanced-Scorecard's internal-process lens and SCOR's "make" metrics both
track __________. Accurate Answer:- Cycle time & productivity
Factory Gate Pricing chiefly shifts which cost responsibility from supplier to
retailer? Accurate Answer:- Inbound transport
A high-value pharma shipment needs active temperature control,
door-to-door security, < 48 h transit. Choose mode Accurate Answer:-
Scheduled air-freight
Direct-to-store delivery beats central warehousing when __________.
Accurate Answer:- Shelf-life is very short
Freight Forwarder vs 4PL: which task is unique to a 4PL? Accurate
Answer:- Overseeing multiple 3PL contracts
A wine importer installs a "control tower." The most immediate
planning-horizon benefit is at the __________ level. Accurate Answer:-
Operational weekly
Omnichannel fulfilment raises final-mile cost mainly because of __________.
Accurate Answer:- Drop-density erosion
, A U.S. exporter ships tools to Brazil under DAP Incoterms 2020. Who clears
import customs? Accurate Answer:- Buyer
WTO's Most-Favoured-Nation principle demands __________. Accurate
Answer:- Equal treatment for like goods from any member
An importer disputes anti-dumping duty. Which WTO body hears the appeal?
Accurate Answer:- Dispute Settlement Body
Under the WCO SAFE Framework, "Authorized Economic Operator" status
primarily yields __________. Accurate Answer:- Accelerated border
release
A shipment of raw almonds triggers U.S. APHIS control. Which regulatory focal
point applies? Accurate Answer:- Products of the soil/food & live
animals
Coordinated Border Management Tier 3 emphasizes __________. Accurate
Answer:- Cross-border agency collaboration
A DC handling 6,000 SKUs with small daily picks is moving from batch to
wave-less picking. Biggest expected benefit? Accurate Answer:- Lower
order cycle time
Cantilever racking is chosen for which product mix? Accurate Answer:-
Steel pipes & timber beams
AMRs (autonomous mobile robots) improve which metric first? Accurate
Answer:- Travel labour hours
A 3PL designs a cold-chain warehouse. What external layout objective
outranks cube utilization? Accurate Answer:- Energy-efficient
insulation orientation
The put-away cycle time in a case study runs from 08-May 09:00 (receipt) to
10-May 14:00 (in-location). Customer order arrives 11-May 08:00, ships
11-May 18:00. Cycle time is: Accurate Answer:- 2 days