This document is a Unit 9 IT Project Management – Assignment D (Closure & Reflection) report. It focuses on the closure of a real IT project and provides a detailed reflection on both the project outcome and personal performance as a trainee project manager. Key Details includes: Full evaluation of the completed project: the Fishwick Primary School Arithmetic App, built to improve children’s mental maths skills. Reflection on how project management skills (time planning, organisation, leadership, communication, and testing) were applied. Assessment of relevant behaviours during the project such as teamwork, problem-solving, and decision-making. A structured self-evaluation table scoring strengths and weaknesses across project management behaviours. Use of project management methodologies including the Project Life Cycle, PRINCE2, and RAD. In-depth analysis of the initiation, planning, implementation, and testing phases, with real project examples. Honest discussion of strengths (leadership, testing, working independently) and weaknesses (time management, teamwork, decision-making). Recommendations for improvement using tools like MoSCoW prioritisation, Work Breakdown Structure (WBS), progress reviews, and structured feedback cycles. Consideration of alternative tools and approaches, comparing MIT App Inventor with more advanced platforms (e.g., Python, Unity). This document demonstrates a well-structured project closure and reflection, showing strong technical understanding and consistent analysis. It is highly valuable for students studying BTEC Level 3 IT Unit 9: Project Management, especially those aiming for Distinction (D criteria), as it clearly addresses how to reflect on project performance, justify choices, and recommend improvements.

Vista previa del contenido

1 of 31



D: Undertake the closure of a
project by reflecting on the
success of personal performance
and the project outcome.




Introduction.................................................................................................2
Explain how project management skills were used in the management of
an IT project. ..............................................................................................2
Explain how relevant behaviours were applied during the management of
an IT project. ..............................................................................................2
Understand relevant behaviours for project management, including Time
planning, Communication Problem-solving skills.........................................2
Recommend improvements to the project management skills and
behaviours applied during an IT project....................................................22
Demonstrate consistently good technical understanding and analysis of
the project, including the effective application of relevant project
management skills and behaviours...........................................................26

,2 of 31


Introduction
A new software development business has hired me, and I’ve finished
my first project correctly. My boss has now asked me to examine the
project management procedure and assess its effectiveness.
It is my responsibility to write a report that analyses the project I recently
finished and assesses the efficacy of the project management techniques
and behaviours I used. It is also required of me to make suggestions for
enhancing the project management abilities and conduct in future
projects. Project management and software development procedures
should be consistently understood in my analysis.




Explain how project management skills were
used in the management of an IT project.

Explain how relevant behaviours were
applied during the management of an IT
project.

Understand relevant behaviours for project
management, including Time planning,
Communication Problem-solving skills

,3 of 31


Key:

1 = highest

3 = Average

5 = lowest

Comment Start During () End ()
(date)

General Skills

Keeping up While 3 4 5
with the creating the
deadlines project I met
the deadlines
and
completed
the work i
was set.

Monitoring the At the start of 4 4 5
progress the project, I
throughout the did a pretty
project good job with
monitoring
the progress
throughout
the project.
Overall, did
well because
my Gant
chart helped
me.

Keeping track I didn't keep 3 2 1
of the time track of the
time because
I was doing
other
assignments I
was crammed
with other
assignments
etc.

, 4 of 31


Planning for I had trouble 5 3 2
the effective managing my
use of time time and
frequently
underestimat
ed how long
tasks would
take. My
ineffective
time
management
resulted in
last-minute
tasks and
missed
deadlines.

Lead a project I led the 5 5 4
project well
as I was the
only one
completing
the project
and i handed
it in on time.

Team
working skills

Organising I didn't do 2 2 1
meetings this well
because
there was no
clear purpose
of the
meeting i
talked about
the wrong
things.

Writing an Lack of 2 3 1
agenda for the preparation
meeting or unclear
objectives.

Información del documento

Nivel de Estudio
Tema
Subido en
8 de septiembre de 2025
Número de páginas
31
Escrito en
2025/2026
Tipo
Ensayo
Profesor(es)
Desconocido
Grado
D
$13.53

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
18
Seguidores
0
Artículos
25
Última venta
2 meses hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes