Documentation for the construction of a hazardous liquid
pipeline must contain a complete record of the total number of
girth welds, locations and cover, location of crossings, and the
location of each valve and corrosion test station and must be
maintained
by the operator for the life of the facility
When the pipe is welded above the ground the working
clearance around the pipe shall be not less than
16 Inches
For pipe ends of the same size prepared for welding, the offset
between the abutting surfaces shall not exceed
1/8th inch
On an 18° slope, where the base of the slope is 30 feet from a
waterbody, temporary slope breakers shall be installed at a
spacing of
at least 100 feet
When the total number of lines buried in the same trench is not
known prior to excavation
a corridor marker is used
Toeboards shall be erected on any scaffold that is more than feet
above lower levels to protect employees below.
10 feet
,Line markers are not required over buried transmission lines for
mains at waterway crossings
Importation of topsoil is an acceptable alternative to segregation
in
Residential areas
Soft earth padding in rocky terrain should be at least
12 inches thick
Prior to hydrostatic testing who is it the Owner/operator shall
notify
residents within proximity of the facility being tested, state and
local enforcement agencies
Corrosion control inspectors should be at least certified as a
NACE C I P Level 1 inspector
A cable laid grommet-hand tucked is an endless wire rope made
from one length of rope wrapped
6 times around a core formed by hand tucking the rope inside
the 6 wraps
The construction ROW width for a project that is described in a
FERC application, without modification, shall not exceed
75 feet
Nonconforming product shall be addressed by
, repair or rework with subsequent inspection to meet
requirements or re-grade for alternative applications, or reject or
scrap or release under concession
Prior to construction, for all residences located within 50 feet of
construction work areas, the project sponsor will ensure that the
construction work area is fenced for at least
100 feet on either side of the residence
A calibration procedure for measuring equipment shall contain
requirements that address
equipment identifier, calibration status, traceability to
measurement standards, acceptance criteria, frequency of
calibration, control of out-of-calibration status
Inspectors should verify the holiday detector settings at least
two times per day
Safety instruction signs shall be
a background of white, panel shall be green with white letters
A natural gas pipeline that operates at a hoop stress of more than
30 % may not have a miter joint that deflects the pipe more than
3°
How often are inspectors required to inspect temporary erosion
control measures?
within 24 hours of each 0.50 inch of rainfall
For pipelines designed to transport liquids and slurries, the
recommended tangent on either side of a cold bend is
Documentation for the construction of a hazardous liquid
pipeline must contain a complete record of the total number of
girth welds, locations and cover, location of crossings, and the
location of each valve and corrosion test station and must be
maintained
by the operator for the life of the facility
When the pipe is welded above the ground the working
clearance around the pipe shall be not less than
16 Inches
For pipe ends of the same size prepared for welding, the offset
between the abutting surfaces shall not exceed
1/8th inch
On an 18° slope, where the base of the slope is 30 feet from a
waterbody, temporary slope breakers shall be installed at a
spacing of
at least 100 feet
When the total number of lines buried in the same trench is not
known prior to excavation
a corridor marker is used
Toeboards shall be erected on any scaffold that is more than feet
above lower levels to protect employees below.
10 feet
,Line markers are not required over buried transmission lines for
mains at waterway crossings
Importation of topsoil is an acceptable alternative to segregation
in
Residential areas
Soft earth padding in rocky terrain should be at least
12 inches thick
Prior to hydrostatic testing who is it the Owner/operator shall
notify
residents within proximity of the facility being tested, state and
local enforcement agencies
Corrosion control inspectors should be at least certified as a
NACE C I P Level 1 inspector
A cable laid grommet-hand tucked is an endless wire rope made
from one length of rope wrapped
6 times around a core formed by hand tucking the rope inside
the 6 wraps
The construction ROW width for a project that is described in a
FERC application, without modification, shall not exceed
75 feet
Nonconforming product shall be addressed by
, repair or rework with subsequent inspection to meet
requirements or re-grade for alternative applications, or reject or
scrap or release under concession
Prior to construction, for all residences located within 50 feet of
construction work areas, the project sponsor will ensure that the
construction work area is fenced for at least
100 feet on either side of the residence
A calibration procedure for measuring equipment shall contain
requirements that address
equipment identifier, calibration status, traceability to
measurement standards, acceptance criteria, frequency of
calibration, control of out-of-calibration status
Inspectors should verify the holiday detector settings at least
two times per day
Safety instruction signs shall be
a background of white, panel shall be green with white letters
A natural gas pipeline that operates at a hoop stress of more than
30 % may not have a miter joint that deflects the pipe more than
3°
How often are inspectors required to inspect temporary erosion
control measures?
within 24 hours of each 0.50 inch of rainfall
For pipelines designed to transport liquids and slurries, the
recommended tangent on either side of a cold bend is