a blasting inspector is required to do which of the following
Correct Answers verify the presence of a blasting plan evaluate
precautions around structures check permits and signage
a leak test pressure ratio Correct Answers <1.25
a pipeline pressure testing records must include the following
Correct Answers temperature of test medium or pipe during
test the minimum test pressure the test medium
a record must be made of each pressure test required by
regulations and the record of the latest test must be retained for
the Correct Answers functional life of the facility
a situation of where drilling mud is released inadvertently into
the surrounding rock or san and travels toward the surface
Correct Answers frac-out
a spike test is typically performed at what pressure Correct
Answers >1.25
a strength test is typically performed at what pressure Correct
Answers 1.25
a trench is defined by OSHA as a narrow underground
excavation that is deeper than it is wide and is no wider than
Correct Answers 15 ft
, All mainline pipeline welding strictly follows Correct Answers
owner approved and qualified welding procedures
All of the following are examples of what a stringing inspector
responsibilities entail Correct Answers type and condition of
equipment used such as fabric slings padded calipers soft lift
hooks complete pipe tallies and check locations of required gaps
and spaces
All of the following are main classifications of pipeline systems
Correct Answers transmission lines gathering lines distribution
lines
all of the following would be considered adequate markers for
below ground facilities when traditional markers are considered
impractical Correct Answers stencil and tracer tapes electronic
markers road decals
all pipe installed in a ditch must be installed in a manner that
minimizes the introduction of Correct Answers secondary
stresses
All pipeline installed in a ditch must be installed in a manner
that provides for which of the following minimize the
introduction of Correct Answers secondary stresses and the
possibility of damage to the pipe
Any pipe installed underground must have at least———-of
clearance between the outside of the pipeline and the extremity
of any other underground structure Correct Answers 12in
a blasting inspector is required to do which of the following
Correct Answers verify the presence of a blasting plan evaluate
precautions around structures check permits and signage
a leak test pressure ratio Correct Answers <1.25
a pipeline pressure testing records must include the following
Correct Answers temperature of test medium or pipe during
test the minimum test pressure the test medium
a record must be made of each pressure test required by
regulations and the record of the latest test must be retained for
the Correct Answers functional life of the facility
a situation of where drilling mud is released inadvertently into
the surrounding rock or san and travels toward the surface
Correct Answers frac-out
a spike test is typically performed at what pressure Correct
Answers >1.25
a strength test is typically performed at what pressure Correct
Answers 1.25
a trench is defined by OSHA as a narrow underground
excavation that is deeper than it is wide and is no wider than
Correct Answers 15 ft
, All mainline pipeline welding strictly follows Correct Answers
owner approved and qualified welding procedures
All of the following are examples of what a stringing inspector
responsibilities entail Correct Answers type and condition of
equipment used such as fabric slings padded calipers soft lift
hooks complete pipe tallies and check locations of required gaps
and spaces
All of the following are main classifications of pipeline systems
Correct Answers transmission lines gathering lines distribution
lines
all of the following would be considered adequate markers for
below ground facilities when traditional markers are considered
impractical Correct Answers stencil and tracer tapes electronic
markers road decals
all pipe installed in a ditch must be installed in a manner that
minimizes the introduction of Correct Answers secondary
stresses
All pipeline installed in a ditch must be installed in a manner
that provides for which of the following minimize the
introduction of Correct Answers secondary stresses and the
possibility of damage to the pipe
Any pipe installed underground must have at least———-of
clearance between the outside of the pipeline and the extremity
of any other underground structure Correct Answers 12in