OSHA 30 Final Exam 2025
3 times when you need Hazard Communication Training - -o Annually
o New Hire
o Introduce New Chemical
How many cycles of CPR do you do before checking - -5
First Aid steps for someone who is bleeding on the job site: - -o Survey
o Recognize
o Elevate
o Pressure
o Treat for shock
What is used to address what needs to be done on a jobsite - -Checklist
Who would be treated first to last
o Head Injury Conscious
o Impaled in Leg
o Person With no movement or breathing
o Unconscious - -o Head Injury Conscious -4
o Impaled in Leg -3
o Person With no movement or breathing -1
o Unconscious -2
How much time do you have to call OSHA with an accident, fatality, or 3 or more
employees to the hospital - -8 Hours
Name 2 potential exposure controls needed when respiratory infection and blood is
present - -Gloves and Mask
What type of program does management implement that gives all employees value - -
Behavioral Based Program
What is the minimum weight for a scaffold to support - -The scaffolds weight plus 4
times the maximum load
What item is placed on a 300 Log, and through what dates must it be posted? - -o
Recordable
o Posted From Feb 1 to May 1
What height do you have to have railing on stairs - -42 inches or 4th step
What does the investigator need to find out - -The root cause
OSHA 30
, OSHA 30
What is an accident where no one is hurt - -Near Miss
What is the number of fire extinguishers needed on a 5 story building with 1000 sq ft
floors - -5
Where does a company meet for accountability when exiting - -Accountability Space
Acceptable 02 content of a confined space - -19.5 - 22.5
What is the documents that defines the SOP - -EAP
Shock symptoms - -o Face is red, raise the head
o Face is pale, raise the tale (feet)
o Difficulty breathing, use semi-sit up position
Signs and Symptoms of Hypertension - -headache, high blood pressure, low blood
sugar
Fire Tetrahedron - -Oxygen, Fuel, Temperature, Chain Reaction
Classifications of fires - -o A - trash, ash, paper, etc.
o B - Boiling liquids
o C - CO2 for Electrical currents
o D - Copper based for metals
o K - Kitchen Grease fires
o Halen only used by Military because it stays in the Ozone
SF needed for fire extinguishers - -1 per 3000 SF per floor)
SDS Section Numbers (Part 1) - -ID Identification
SDS Section Numbers (Part 2) - -Hazard ID
SDS Section Numbers (Part 4) - -First Aid
SDS Section Numbers (Part 5) - -Fire fighting
SDS Section Numbers (Part 7) - -Handling & Storage
SDS Section Numbers (Part 8) - -PPE/Exposure Controls
SDS Section Numbers (Part 16) - -Other / 704 Marker
Ladder Ratio - -4 to 1 ratio (4 feet up to 1 foot out)
OSHA 30