ENCE 325 EXAM QUESTIONS & ANSWERS

The widening of a state highway is an example of which sector of the construction
industry? - Answer -Infrastructure

Specialty trade contractors are typically hired on the job by which of the following? -
Answer -The Contractor

A construction project is characterized by the following? - Answer -It is unique, It results
in deliverables, and it uses resources

In which of the following stages does the contractor have the major responsibility to
coordinate all necessary tasks associated with that stage? - Answer -Close Out

Which member of the contractor's team is responsible for the day-to-day production
activities on the jobsite? - Answer -The Superintendent

The residential sector of the industry is characterized by which of the following? -
Answer -Projects are fairly low tech

What is the major rating system for green buildings - Answer -LEED

During the start-up and mobilization stage the following activities occur? - Answer -The
contractor moves onto the obsite

The ______ is responsible for the project feasibility stage. - Answer -owner

The outcomes of the bidding and awards stage are ______ ,_______and ______. -
Answer -bid package, bid submittals, and awarding of contract.

A design-build delivery method typically results in the owner having one contract with
the architect and another contract with the contractor. - Answer -False

The owner will decide which of the following as a result of the feasibility stage (select all
correct answers). - Answer -Move forward with the contract, abandon the project, and
Adjust the scope, budget and or schedule

Project design typically occurs in three distinct phases
_________,_____, and _______ - Answer -schematic design , design development,
final design

An owner is considering building a 120 unit housing development on the outskirts of
town. What would you refer to in determining if horses would be allowed as part of the
property development? - Answer -Zoning Ordinance

Información del documento

Subido en
30 de agosto de 2025
Número de páginas
3
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.89

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(366)
Vendido
2162
Seguidores
1449
Artículos
60417
Última venta
10 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes