HSI Final Test Questions With Correct Answers

Document preview thumbnail
Vista previa 4 fuera de 39 páginas

HSI Final Test Questions With Correct Answers

Vista previa del contenido

HSI Final Test Questions With Correct
Answers

The initial response to a frequency deviation is due to which of the following
| | | | | | | | | | | | |




1. Load / frequency response
| | | | |




2. AGC
|




3. Governor action
| |




4. Interchange schedules
| |




•3 and 4
| |




•1 and 2
| |




•2 and 3
| |




•1 and 3 - CORRECT ANSWER✔✔-•1 and 3
| | | | | | |




EMS and AGC have failed at 12:25 and generation must be controlled manually.
| | | | | | | | | | | | |


The operator calculates ACE to be +25 MWs. Load is expected to increase 100
| | | | | | | | | | | | | |


MWs, and imports will increase by 75 MWs at the top of the hour. What should
| | | | | | | | | | | | | | | |


the operator do?
| |




•Maintain current generation level | | |




•Decrease generation by 25 MWs | | | |




•Decrease generation by 50 MWs | | | |

,•Increase generation by 25 MW - CORRECT ANSWER✔✔-•Decrease generation
| | | | | | | | |


by 25 MWs
| |




How is the Frequency Response Measure (FRM) of a Balancing Authority
| | | | | | | | | | |


determined?


•lt is the average of the BA's frequency response for all the frequency deviations
| | | | | | | | | | | | | |


of the previous year
| | |




•lt is the change in the BA's Net Interchange Actual for the largest frequency
| | | | | | | | | | | | | |


deviation during the previous year | | | |




•lt is the previous year's Control Performance Standard 1 ( CPS1 ) score
| | | | | | | | | | | |




•It is the median of the BA's frequency response for the frequency deviation
| | | | | | | | | | | | |


events identified by NERC for the previous year - CORRECT ANSWER✔✔-•It is the
| | | | | | | | | | | | |


median of the BA's frequency response for the frequency deviation events
| | | | | | | | | | |


identified by NERC for the previous year | | | | | |




Sufficient Operating Reserve is defined as the capacity required to meet what?
| | | | | | | | | | |




•DOE specifications |




•CPS and DCS | |




•CPS 1 & 2 only | | | |




•Capacity Standard - CORRECT ANSWER✔✔-•CPS and DCS
| | | | | |




In your Interconnection , a generator tripped that was large enough to reduce the
| | | | | | | | | | | | |


|frequency from 60.00 Hz to 59.94 Hz . Your Balancing Authority's Frequency Bias
| | | | | | | | | | | | |

,is -200 MW / 0.1 Hz . How many MW would your system initially contribute to
| | | | | | | | | | | | | | | |


frequency support? |




•120 MW |




•80 MW|




•100 MW |




•200 MW - CORRECT ANSWER✔✔-•120 MW
| | | | |




Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and
| | | | | | | | | | | | | |


your AGC is pulsing your units down . What should you do
| | | | | | | | | | |




•Leave AGC in operation but investigate
| | | | |




•Place AGC in constant frequency control
| | | | |




•Place AGC in flat tie line control
| | | | | |




•Suspend AGC and investigate - CORRECT ANSWER✔✔-•Suspend AGC and
| | | | | | | | |


investigate


When a Balancing Authority's ACE value is the same sign as the frequency
| | | | | | | | | | | | |


deviation , which NERC control performance score is affected negatively
| | | | | | | | |




•DCS
•CPS 1 |




•TEC
•BAAL - CORRECT ANSWER✔✔-•CPS 1
| | | |

, Correct Of the following , which control system would be affected by a difference
| | | | | | | | | | | | | |


in Net Actual Interchange and Net Scheduled Interchange
| | | | | | |




•Reactive Control |




•Turbine Governor Control | |




•Automatic Generation Control | |




•Automatic Voltage Regulator - CORRECT ANSWER✔✔-•Automatic Generation
| | | | | | |


Control


Balancing Authority A is currently reading a system frequency of 59.98 Hz . Its Net
| | | | | | | | | | | | | |


|Actual Interchange is +100 MW and its Net Scheduled Interchange is +100 MW .
| | | | | | | | | | | | | |


If Balancing Authority A's frequency bias setting is 100 MW / 0.1 HZ , what is ACE
| | | | | | | | | | | | | | | |




• -20
|




•20
•2
•0 - CORRECT ANSWER✔✔-• -20
| | | |




A Balancing Authority has twenty units on governor control . The units have
| | | | | | | | | | | | |


different capacities that range from 200 MW to 1000 MW and droop settings
| | | | | | | | | | | | |


from 2 % to 5 % . The biggest adjustments in megawatt output in response to a
| | | | | | | | | | | | | | | | |


frequency disturbance will be provided by units that have _______________?
| | | | | | | | |




•large capacity and small droop setting
| | | | |

Información del documento

Subido en
20 de agosto de 2025
Número de páginas
39
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectphilip
4.0
(45)
Vendido
303
Seguidores
8
Artículos
27399
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes