What is the minimum compressive strength in psi for a concrete basement slab with negligible weathering potential? - ANSWERS2,500 PSI An accessory structure is a structure not greater than _______ SF - ANSWERS3,000 SF What is the R Value insulation requirement for a residential floor climate zone 3? - ANSWERS19 For a "Means of Egress Door", what is the minimum width of each door opening in inches? - ANSWERS32'' Exterior wood framing walls shall be a minimum of _____ grade wood. - ANSWERS3 Which of the following is not considered work exempt from a permit? Swings/Playground equipment Sidewalks Fences less than 6ft interior painting - ANSWERSFences less than 6 ft A permit becomes invalid if the work authorized by the permit does not begin in ____ days. - ANSWERS180 days True or False the building Permit should be kept onsite until work is complete? - ANSWERSTrue When shall a final inspection be conducted? - ANSWERSAfter permitted work is complete. What is Required in a certificate of occupancy? - ANSWERSName and Address of Owner Name of Building Official Edition of the code permit was issued under Which is required on a site plan? -location of new construction - distance from lot lines -traffic control plan -location of existing structures - ANSWERSTraffic Control Plan

Vista previa del contenido

Louisiana Residential Contractors
License Questions with Correct
Answers
What is the minimum compressive strength in psi for a concrete basement slab with
negligible weathering potential? - ANSWERS2,500 PSI

An accessory structure is a structure not greater than _______ SF - ANSWERS3,000
SF

What is the R Value insulation requirement for a residential floor climate zone 3? -
ANSWERS19

For a "Means of Egress Door", what is the minimum width of each door opening in
inches? - ANSWERS32''

Exterior wood framing walls shall be a minimum of _____ grade wood. - ANSWERS3

Which of the following is not considered work exempt from a permit?
Swings/Playground equipment
Sidewalks
Fences less than 6ft
interior painting - ANSWERSFences less than 6 ft

A permit becomes invalid if the work authorized by the permit does not begin in ____
days. - ANSWERS180 days

True or False the building Permit should be kept onsite until work is complete? -
ANSWERSTrue

When shall a final inspection be conducted? - ANSWERSAfter permitted work is
complete.

What is Required in a certificate of occupancy? - ANSWERSName and Address of
Owner
Name of Building Official
Edition of the code permit was issued under

Which is required on a site plan?
-location of new construction
- distance from lot lines
-traffic control plan

, -location of existing structures - ANSWERSTraffic Control Plan

How long must you retain approved construction documents after the work is
completed? - ANSWERS180 days

Who is authorized to establish a refund policy for permit fees? - ANSWERSBuilding
Official

True or False You are allowed to continue work safely after a stop work order has been
issued? - ANSWERSFalse

Who appoints the building official from the department of building safety? -
ANSWERSChief Appointing Authority of the Jurisdiction

When there is a conflict and different sections of the IBC specify different materials you
must? - ANSWERSUse the most restrictive guidence

Live loads for floors and roofs must be posted by the owner when they exceed
_______PSF - ANSWERS50 PSF

A Permit is not valid until? - ANSWERSThe fee has been paid

Who has the authority to authorize temporary utility connections? - ANSWERSBuilding
Official

True or False A detached 400 Square Foot storage shed does not require a permit? -
ANSWERSFalse

Footing and foundation inspections should occur? - ANSWERSAfter excavation is
complete and Rebar is installed

What is the maximum slope of a ramp? - ANSWERS12 to 1

A drill hole for piping or conduit shall be a minimum of ____ inches from the top to the
bottom of the floor joist - ANSWERS1''

After the first coat is applied when should the second coat of cement plaster be applied?
- ANSWERS48 hrs.

True or False Exhaust ducts associated with clothes dryers shall terminate outside of
the building - ANSWERSTrue

Electrical Equipment intended to interrupt current at fault levels shall have a minimum
interrupting rate of ____ Amperes - ANSWERS10,000 Amps

True or False All Metal faceplates should be grounded - ANSWERSTrue

Información del documento

Subido en
19 de agosto de 2025
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
4
Seguidores
0
Artículos
1470
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes