• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 63 páginas
Examen

VA DEQ ESC Inspector Exam Questions and Answers 100- Pass

Document preview thumbnail
Vista previa 4 fuera de 63 páginas

VA DEQ ESC Inspector Exam Questions and Answers 100- Pass

Vista previa del contenido

VA DEQ ESC Inspector Exam Questions and
Answers 100% Pass




1. VESCP

Answer> Virginia Erosion and Sediment Control Program
| | | | | |




- Administered by counties/cities (must), towns (may)
| | | | |




- MUST BE APPROVED
| |




2. Minimum Standard 1 | |




Answer> Stabilization
|




permanent or temporary soil stabilization shall be applied to denuded areas within
| | | | | | | | | | |




seven days after final grade is reached on any portion of the site; temporary soil
| | | | | | | | | | | | | | |




stabilization shall be applied within seven days to denuded areas that may not be at final
| | | | | | | | | | | | | | | |

1 |/ |63

,grade but will remain dormant for longer than 14 days;permanent stabilization shall be
| | | | | | | | | | | | | |




applied to areas that are to be left dormant for more than one year
| | | | | | | | | | | | | |




3. Site NOT at Final Grade
| | | |




Answer> - stabilize in 14 days
| | | | |




- temporarily seed |




- mulch

- permanently stabilize if dormant > 1 year| | | | | |




4. Site at Final Grade
| | |




Answer> - stabilize in 7 days (recommended immediately)
| | | | | | |




- permanently or temporarily seed and mulch| | | | |




- mulch/matting/straw

5. Minimum Standard 2 | |




Answer> Stock Piles, Waste and Borrow Areas
| | | | | |




during construction, soil stock piles and borrow areas shall be stabilized or protected with
| | | | | | | | | | | | |




sediment trapping measures
| | |




mulchpreventserosion byprotectingthe surface fromraindropimpact andsiltfence
| | | | | | | | | | | |



2 |/ |63

,intercepts and detains from disturbed areas
| | | | | |




6. Minimum Standard 3 | |




Answer> Permanent Vegetation | |




permanent vegetation cover shall be established on denuded areas not otherwise
| | | | | | | | | |




permanently stabilized (permanent vegetation shall not be considered established
| | | | | | | | |




until a ground cover is achieved that is uniform, mature enough to survive, and will
| | | | | | | | | | | | | | |




inhibit erosion *there is no % associated with this*)
| | | | | | | | |




reduce erosion and decrease sediment yield from disturbed area
| | | | | | | |




this is the standard used to verify that a site is ready for release of bonds or surety
| | | | | | | | | | | | | | | | |




7. Minimum Standard 4 | |




Answer> First-Step Measures | |




Sediment basins and traps, perimeter dikes, sediment barriers and other measures
| | | | | | | | | |




intended to trap sediment shall be constructed as a first step in any land-disturbing
| | | | | | | | | | | | | |




activity and shall be made functional before upslope land disturbance takes place
| | | | | | | | | | |




3 |/ |63

, a certain amount of initial land disturbance may be required to provide access for
| | | | | | | | | | | | |




| equipment to install the perimeter controls, but site clearing and grading should be ke
| | | | | | | | | | | | |




| to a minimum until the perimeter controls are in place
| | | | | | | | |




intercepts and detains small amounts of sediment from disturbed areas during
| | | | | | | | | |




| construction operation to prevent sediment from leaving the site and decrease
| | | | | | | | | |




| velocity of sheet flows and low-to-moderate level channel flow
| | | | | | | |




8. Perimeter Controls |




Answer> assures that sediment does not leave the perimeter of the land-disturbing
| | | | | | | | | | |




| area once site clearing, grading, and construction commences
| | | | | | |




Examples silt fences, sediment traps, sediment basins, construction entrance,
| | | | | | | |




| temporary diversions, diversions | |




9. Minimum Standard 5 | |




Answer> Earthen Structure Stabilization | | |




stabilization measures shall be applied to earthen structures such as dams, dikes, and
| | | | | | | | | | | |




| diversions immediately after installation| | |




4 |/ |63

Información del documento

Subido en
16 de agosto de 2025
Número de páginas
63
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$21.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectphilip
4.0
(42)
Vendido
290
Seguidores
7
Artículos
26721
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes