• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 43 páginas
Examen

Cisec Exam | Questions And Answers | Verified And Well Detailed Answers| Latest Update

Document preview thumbnail
Vista previa 4 fuera de 43 páginas

CISEC EXAM | QUESTIONS AND ANSWERS | VERIFIED AND WELL DETAILED ANSWERS| LATEST UPDATE

Vista previa del contenido

CISEC EXAM | QUESTIONS AND ANSWERS | VERIFIED AND WELL
DETAILED ANSWERS| LATEST UPDATE




When working in waterways or wetlands, which permit is required? - CORRECT
ANSWER- 404 Permit


NPDES - CORRECT ANSWER- National Pollutant Discharge Elimination
System
Section of CWA (Clean Water Act) to permit stormwater discharges associated
with industrial activities per the permit


CWA Penalty Types - CORRECT ANSWER- Class I. Negligent
Class II. Knowingly = Greater Fines


What documents are required onsite? - CORRECT ANSWER- SWPPP
CGP
Site Map
Drawings and Key
All inspection reports
Any amendments to SWPPP


Who is the "Operator" - CORRECT ANSWER- Usually the OWNER of the site,
not the contractor, unless authorized by the owner to general contractor to have
day-to-day operational control

,Vertical Projects - CORRECT ANSWER- Homebuilding, smaller residential
construction projects
Usually multiple subcontractors
Requires a lot of housekeeping


LDP - CORRECT ANSWER- Land Developing Projects - altering landscape for
projects


Big Box Projects - CORRECT ANSWER- Commercial buildings
Mass grading and mass chaos
Limits site access and continually changing (high activity)


Linear Priojects - CORRECT ANSWER- Roadways, utilities, and stream
corridors
Long narrow sites and mass chaos
Highly visible with fairly large footprint


What is erosion? - CORRECT ANSWER- The process by which soil particles get
displaced by the act of wind or water


What are three types of wind erosion - CORRECT ANSWER- Surface Creep,
Saltation, and Suspension


What is surface creep? - CORRECT ANSWER- Rolling and sliding movement of
particles across a surface. 5-25% total soil loss by wind

,What is saltation? - CORRECT ANSWER- Hopping and bouncing movement of
particles. 50-80% total soil loss by wind


What is suspension? - CORRECT ANSWER- Small, lightweight particles carried
great distances by wind. Less than 10% total soil loss by wind


What are the types of water erosion? - CORRECT ANSWER- Raindrop erosion,
sheet erosion, rill and gully erosion, stream and channel erosion, shoreline erosion,
landslides


What is sheet erosion? - CORRECT ANSWER- Stripping of soil that occurs due
to sheet flows of runoff


Rill and Gully Erosion - CORRECT ANSWER- If the runoff is allowed to
concentrate and gain velocity or energy, it will cut rills and gullies as it detaches
more soil particles
Rills: </= to 3" deep
Gullies: 3 or more rills converted to greater that 3" deep


Streambank/Channel Erosion - CORRECT ANSWER- Removal of soil and other
embankment materials due to concentrated channel flows


T/F: Rills are more than 75mm deep and are often the start of gullies - CORRECT
ANSWER- False: gullies are more than 75mm deep

, What factors impact rainfall erosion? - CORRECT ANSWER- Climate events,
soil erodibility, length of flow down a slope, slope of land (critical), erosion control
BMPs, sediment control BMPs


T/F: Clay is highly erodible - CORRECT ANSWER- False


What is sediment? - CORRECT ANSWER- The eroded material suspended in
water or air


Flocculants - CORRECT ANSWER- Chemicals added to a mixture to make
suspended particles clump together.
Cationic (bad), Anionic (good)


Who decides the necessary BMPs in the SWPPP for a project? - CORRECT
ANSWER- Developer/Designer (not inspector)


Types of EC BMPs - CORRECT ANSWER- Placement of pavement, installing
landscaping materials, establishing vegetation, construction of homes,
culverts/slope drains, diversion channels, ECB and TRMs


What is the minimum number of inspections required? - CORRECT ANSWER-
Once every 14 days


Major things to look for on S&EC plans - CORRECT ANSWER- What is to be
installed before grading, as per plan
NOTES sections
Major discharge points

Información del documento

Subido en
14 de agosto de 2025
Número de páginas
43
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$23.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tutorlorghon
4.7
(254)
Vendido
807
Seguidores
19
Artículos
7850
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes