Water Distribution Practice Exam Grade
ii ii ii ii ii
1 Study Guide Q&A ii ii ii ii
ii
ii
What iiis iithe iidefinition iiof ii"operator"? ii- iiCORRECT iiANSWER-Operator iihas iithe
iisame ii
ii
meaning iias iicertified
iioperator.
ii
Within iihow iimany iidays iimust iia iicertified iioperator iinotify iithe iiDepartment ii(in iiwriting)
iithat iithe iioperator iieither iiceases iior iicommences iioperation iiof iianother iifacility? ii-
iiCORRECT ii
ANSWER-10 iidays ii
ii
At iiwhich iitype iiof iifacility iiis iia iiremote iioperator iiallowed iito iioperate? ii-
iiCORRECT ii
ii
ANSWER-Any iiGrade ii1 iior iiGrade ii2
iifacility
ii
How iiclose iimust iithe iiremote iioperator iiof iia iifacility iibe iito iithe iifacility iito iilegally iioperate
iithe ii
ii
facility? ii- iiCORRECT iiANSWER-Within ii200 iimiles iiby iiground
iitravel.
ii
What iiis iithe iiinspection iifrequency iithat iia iiremote iioperator iimust iiinspect iia iigrade
ii1 iior ii
grade ii2 iiwater iitreatment iiplant iior iidistribution iisystem iithat iiproduces
iigroundwater? ii-
ii
CORRECT iiANSWER-As iioften iias iinecessary, iibut iino iiless iithan
iimonthly.
ii
Upon iiexpiration iiof iian iioperator iicertificate, iihow iimany iidays iidoes iian iioperator iihave
iito ii
reinstate iithe iicertificate iiwithout iiretaking iian iiexamination? ii- iiCORRECT iiANSWER-
90
ii
days
ii
What iiis iian iiinitial iimonitoring iiyear? ii- iiCORRECT iiANSWER-The iicalendar iiyear
iidesignated iiby iithe iiDepartment iiwithin iia iicompliance iiperiod iiin iiwhich iia iipublic iiwater
iisystem iiconducts iiinitial iimonitoring iiat iia iipoint iiof iientry. ii
ii
What iiis iithe iireporting iilimit iifor iiall iiregulated iiVOC's? ii- iiCORRECT iiANSWER-0.0005
iimg/L ii
ii
Who iiis iiallowed iito iiconduct iia iisanitary iisurvey? ii- iiCORRECT iiANSWER-A
iirepresentative ii
, of iithe iiDepartment iior iia iiprofessional iiengineer iior iisanitarian iiwho iiis iiregistered iiin
iiArizona ii
ii
and iiapproved iiby iithe
iiDepartment.
ii
Under iiwhat iicircumstances iimay iithe iiDepartment iireduce iimonitoring iifrequency iifor
iinitrate iiat iia iisurface iiwater iisampling iipoint iiand iiwhat iiis iithe iireduced iifrequency? ii-
iiCORRECT iiANSWER-If iithe iianalytical iiresults iiare ii< ii5 iimg/L iifor ii4 iiconsecutive
iiquarters iithen iireduce iisampling iifrequency iifrom iiquarterly iito iiannually. ii
ii
Which iitype iiof iisystem iiis iinot iirequired iito iisample iifor iiVOC's? ii- iiCORRECT
iiANSWER-
ii
Transient iiNon-community iiWater
iiSystem.
What iicontaminants iidoes iithe iimonitoring iiassistance iiprogram iimonitor? ii-
iiCORRECT ii
ii
ANSWER-IOCs, iiVOCs, iiand
iiSOCs.
ii
What iitypes iiof iipublic iiwater iisystem iimust iicomply iiwith iiArticle ii6, iiCapacity
iiDevelopment iiRequirements iifor iia iiNew iiPublic iiWater iiSystem? ii- iiCORRECT
iiANSWER-Community iiwater iisystems iiand iinon-transient iinon-community iiwater
iisystems iithat iibegin iioperations iion iior iiafter iiOctober ii1, ii1999 ii
ii
To iibecome iia iinew iipublic iiwater iisystem, iian iiowner iishall iifile iian iielementary iibusiness
iiplan ii
ii
for iireview iiand iiapproval iiby iithe iiDepartment. iiWhat iithree iielements iimake iiup
iithe
ii
elementary iibusiness iiplan? ii- iiCORRECT iiANSWER-Technical iiCapacity,
iiManagerial
ii
Capacity, iiand iiFinancial
iiCapacity.
ii
ii
What iiis iithe iidefinition iiof iian ii"on-site iirepresentative"? ii- iiCORRECT iiANSWER-On-
site
representative iimeans iia iiperson iilocated iiat iia iifacility iiwho iimonitors iithe iidaily iioperation
iiat ii
ii
the iifacility iiand iimaintains iicontact iiwith iithe iiremote iioperator iiregarding iithe
iifacility.
ii
According iito iiArizona iiState iiRule, iian ii"Air-gap iiseparation" iimeans iia iiphysical
iiseparation iibetween iithe iidischarge iiend iiof iia iisupply iipipe iiand iithe iitop iirim iiof iiits
iireceiving iivessel, iiwhich iihas iia iiseparation iidistance iiequal iito iiat iileast? ii- iiCORRECT
iiANSWER-1 iiinch iior iitwice iithe iidiameter iiof iithe iisupply iipipe, iiwhichever iiis iigreater. ii
ii
ii ii ii ii ii
1 Study Guide Q&A ii ii ii ii
ii
ii
What iiis iithe iidefinition iiof ii"operator"? ii- iiCORRECT iiANSWER-Operator iihas iithe
iisame ii
ii
meaning iias iicertified
iioperator.
ii
Within iihow iimany iidays iimust iia iicertified iioperator iinotify iithe iiDepartment ii(in iiwriting)
iithat iithe iioperator iieither iiceases iior iicommences iioperation iiof iianother iifacility? ii-
iiCORRECT ii
ANSWER-10 iidays ii
ii
At iiwhich iitype iiof iifacility iiis iia iiremote iioperator iiallowed iito iioperate? ii-
iiCORRECT ii
ii
ANSWER-Any iiGrade ii1 iior iiGrade ii2
iifacility
ii
How iiclose iimust iithe iiremote iioperator iiof iia iifacility iibe iito iithe iifacility iito iilegally iioperate
iithe ii
ii
facility? ii- iiCORRECT iiANSWER-Within ii200 iimiles iiby iiground
iitravel.
ii
What iiis iithe iiinspection iifrequency iithat iia iiremote iioperator iimust iiinspect iia iigrade
ii1 iior ii
grade ii2 iiwater iitreatment iiplant iior iidistribution iisystem iithat iiproduces
iigroundwater? ii-
ii
CORRECT iiANSWER-As iioften iias iinecessary, iibut iino iiless iithan
iimonthly.
ii
Upon iiexpiration iiof iian iioperator iicertificate, iihow iimany iidays iidoes iian iioperator iihave
iito ii
reinstate iithe iicertificate iiwithout iiretaking iian iiexamination? ii- iiCORRECT iiANSWER-
90
ii
days
ii
What iiis iian iiinitial iimonitoring iiyear? ii- iiCORRECT iiANSWER-The iicalendar iiyear
iidesignated iiby iithe iiDepartment iiwithin iia iicompliance iiperiod iiin iiwhich iia iipublic iiwater
iisystem iiconducts iiinitial iimonitoring iiat iia iipoint iiof iientry. ii
ii
What iiis iithe iireporting iilimit iifor iiall iiregulated iiVOC's? ii- iiCORRECT iiANSWER-0.0005
iimg/L ii
ii
Who iiis iiallowed iito iiconduct iia iisanitary iisurvey? ii- iiCORRECT iiANSWER-A
iirepresentative ii
, of iithe iiDepartment iior iia iiprofessional iiengineer iior iisanitarian iiwho iiis iiregistered iiin
iiArizona ii
ii
and iiapproved iiby iithe
iiDepartment.
ii
Under iiwhat iicircumstances iimay iithe iiDepartment iireduce iimonitoring iifrequency iifor
iinitrate iiat iia iisurface iiwater iisampling iipoint iiand iiwhat iiis iithe iireduced iifrequency? ii-
iiCORRECT iiANSWER-If iithe iianalytical iiresults iiare ii< ii5 iimg/L iifor ii4 iiconsecutive
iiquarters iithen iireduce iisampling iifrequency iifrom iiquarterly iito iiannually. ii
ii
Which iitype iiof iisystem iiis iinot iirequired iito iisample iifor iiVOC's? ii- iiCORRECT
iiANSWER-
ii
Transient iiNon-community iiWater
iiSystem.
What iicontaminants iidoes iithe iimonitoring iiassistance iiprogram iimonitor? ii-
iiCORRECT ii
ii
ANSWER-IOCs, iiVOCs, iiand
iiSOCs.
ii
What iitypes iiof iipublic iiwater iisystem iimust iicomply iiwith iiArticle ii6, iiCapacity
iiDevelopment iiRequirements iifor iia iiNew iiPublic iiWater iiSystem? ii- iiCORRECT
iiANSWER-Community iiwater iisystems iiand iinon-transient iinon-community iiwater
iisystems iithat iibegin iioperations iion iior iiafter iiOctober ii1, ii1999 ii
ii
To iibecome iia iinew iipublic iiwater iisystem, iian iiowner iishall iifile iian iielementary iibusiness
iiplan ii
ii
for iireview iiand iiapproval iiby iithe iiDepartment. iiWhat iithree iielements iimake iiup
iithe
ii
elementary iibusiness iiplan? ii- iiCORRECT iiANSWER-Technical iiCapacity,
iiManagerial
ii
Capacity, iiand iiFinancial
iiCapacity.
ii
ii
What iiis iithe iidefinition iiof iian ii"on-site iirepresentative"? ii- iiCORRECT iiANSWER-On-
site
representative iimeans iia iiperson iilocated iiat iia iifacility iiwho iimonitors iithe iidaily iioperation
iiat ii
ii
the iifacility iiand iimaintains iicontact iiwith iithe iiremote iioperator iiregarding iithe
iifacility.
ii
According iito iiArizona iiState iiRule, iian ii"Air-gap iiseparation" iimeans iia iiphysical
iiseparation iibetween iithe iidischarge iiend iiof iia iisupply iipipe iiand iithe iitop iirim iiof iiits
iireceiving iivessel, iiwhich iihas iia iiseparation iidistance iiequal iito iiat iileast? ii- iiCORRECT
iiANSWER-1 iiinch iior iitwice iithe iidiameter iiof iithe iisupply iipipe, iiwhichever iiis iigreater. ii
ii