100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NR 416 Final questions with accurate answer1

Puntuación
-
Vendido
-
Páginas
39
Grado
A+
Subido en
03-08-2025
Escrito en
2025/2026

NR 416 Final questions with accurate answer1

Institución
NR 416
Grado
NR 416











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NR 416
Grado
NR 416

Información del documento

Subido en
3 de agosto de 2025
Número de páginas
39
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NR 416 Final questions with accurate answers
2 types of no project alternative Ans✓✓✓ 1. when project is the
revision of an existing plan etc the no project alternative will be the
continuation of the existing plan.


2. when not revision it is the circumstance where the project does not
proceed and the analysis compares the proposed project to the property
remaining in its existing state


exception: other future uses of land or regulatory actions are reasonably
foreseeable


4 types of mitigation measures Ans✓✓✓ avoid
minimize, reduce, or eliminate
rectify
compensate


4 types of mitigation measures: avoid Ans✓✓✓ avoid the impact
altogether by not taking certain actions or parts of actions


4 types of mitigation measures: compensate Ans✓✓✓ compensate for
impact by replacing or providing substitute resources or envis

,4 types of mitigation measures: minimize reduce or eliminate Ans✓✓✓
minimize impacts by limiting the degree or magnitude of the action and
its implementation


reduce or eliminate the impact over time through preservation and
maintenance during the life of the action


4 types of mitigation measures: rectify Ans✓✓✓ rectify the impact by
repairing, rehabilitating, or restoring the affected envi


Addendum to EIR Ans✓✓✓ minor technical changes only, with no
significant impact


agency decision making process Ans✓✓✓ 1. Consider and Certify the
EIR
-certification on requirements
--FEIR completed with CEQA compliance
--Reviewed & Certified
--represents lead agency's independent judgement and analysis
2. Approve the project
-make findings
-adopt MMRP
-adopt statement of overriding considerations (SOC)
3. Issue permit

,-CEQA statute of limitation
-all other permits received
-appropriate conditions of all other approval & mitigations completed


Agency decision process post CEQA Ans✓✓✓ Consider and certify
EIR
-certification requirements
---FEIR completed in compliance with CEQA
---FEIR represents lead agency's independent judgement and analysis


Approve Project
-make findings
-adopt mitigation, monitoring, and reporting program
-adopt statement of overriding considerations (if necessary)


Issue permit
-CEQA statute of limitations
-all other permits received
-appropriate conditions of approval (and mitigations) completed


alternative site/location Ans✓✓✓ need not be evaluated in every case-
'rule of reason'

, key question: are envi impacts avoided/lessened overall?


if alternative locations are no evaluated need to disclose reasons


if alternative locations are evaluated rely on previous documents (plan,
policy, or program EIRs) to extent possible


circumstances where inclusion of alternatives sites would be
appropriate:
-public project (because eminent doamain)
-project proponent owning or controlling or having access/lease of
feasible alternative sites
-two or more developers seeking approval for same type of development
at different locations


alternatives general methodology Ans✓✓✓ 1. develop project
objectives
2. determine significant impacts to be avoided
3. develop broad list of alternatives
4. develop screening criteria
if infeasible explain why


-if feasible (conduct evaluation)
-compare to proposed project impacts
$17.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
cracker Chamberlain School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2022
Miembro desde
3 año
Número de seguidores
1344
Documentos
47128
Última venta
5 días hace
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

369 reseñas

5
162
4
84
3
52
2
22
1
49

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes