• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 43 páginas
Examen

General crane safety ACTUAL exam: QUESTION AND ANSWERS UPDATED 2025 LATEST

Document preview thumbnail
Vista previa 4 fuera de 43 páginas

General crane safety ACTUAL exam: QUESTION AND ANSWERS UPDATED 2025 LATEST

Vista previa del contenido

General crane safety ACTUAL exam: QUESTION AND
ANSWERS UPDATED 2025 LATEST
The minimum crane team for a mobile crane on outriggers would consist of-

A) The Crane Operator, Rigger Supervisor, and Crane Rigger

B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and

Crane Rigger

C) The Crane Operator, Crane Supervisor, and Crane Rigger

D) The Crane Operator and Rigger-in-Charge

E) The Crane Operator, Crane Walker, and Crane Rigger - (ANSWER)C) The Crane
Operator, Crane Supervisor, and Crane Rigger



When operating floating cranes, you must start swinging or rotating quickly and
stop smoothly to prevent excessive barge list.

A) True

B) False - (ANSWER)B) False



Extending a telescoping boom without lowering the hoist may result in "two-
blocking" the crane.

A) True

B) False - (ANSWER)A) True



All of the following require a license to operate EXCEPT a(n)-

A) Cab-operated category 3 bridge crane

,B) Mobile hydraulic truck crane

C) Non-cab operated category 3 bridge crane

D) Articulating boom category 4 crane

E) Floor-operated category 2 bridge crane - (ANSWER)C) Non-cab operated
category 3 bridge crane



Which of the following lift types would NOT be considered a complex lift?

A) Multiple-crane lifts

B) Oxygen/Acetylene bottles in racks designed for lifting

O C) Large geometric shapes

D) Loads with multi-level attachment points

E) Hazardous or explosive materials - (ANSWER)B) Oxygen/Acetylene bottles in
racks designed for lifting



What is the minimum amount of rope that shall be on a grooved drum and a
smooth drum?

A) There is no minimum

B) 4 full wraps, 2 full wraps

C) 2 full wraps, 3 full wraps

D) 6 full wraps, 4 full wraps

E) 1 full wrap, 2 full wraps - (ANSWER)B) 4 full wraps, 2 full wraps

,The horizontal distance from the center of rotation of the crane to the center of
the hoist line(s) with load applied is called

A) Boom Length

B) Radius

C) Lift Zone

D) Quadrant

E) Circumference - (ANSWER)B) Radius



What is two-blocking, and why is two-blocking dangerous?

A) Two-blocking occurs when the hook contacts another block or hook on the
crane. It is dangerous because the hook could damage the crane, causing loss of
load control.

B) Two-blocking occurs when the block or hook contacts the ground.

It is dangerous because the wire rope may come off of the drum and drop the
block.

C) Two-blocking occurs when the hook block comes in contact with the upper
sheave block during hoisting of the hook. It is dangerous because it could result in
damage to the crane, parting of the hoist lines, and dropping the load. -
(ANSWER)C) Two-blocking occurs when the hook block comes in contact with the
upper sheave block during hoisting of the hook. It is dangerous because it could
result in damage to the crane, parting of the hoist lines, and dropping the load.



When should a tagline be used during lifting operations?

A) when lifting a load over or near electrical transmission lines

B) to prevent the load from swinging or rotating

, C) when the supervisor approves their use

D) only when lifting the load to extreme heights - (ANSWER)B) to prevent the
load from swinging or rotating



What is the weight of a 24 square foot, 2 inch thick aluminum plate with a unit
weight of 15 lbs. per square foot of material per inch of thickness?

A) 348 pounds

B) 720 pounds

C) 6,720 pounds

D) 60 pounds

E) 120 pounds - (ANSWER)B) 720 pounds



The two expiration dates that are of particular importance to crane operators are-

A) Vehicle registration expiration date

B) Hydraulic oil expiration date

C) CAC card expiration date

D) The certification expiration date of the crane

E) The crane operator's license expiration date - (ANSWER)D) The certification
expiration date of the crane

E) The crane operator's license expiration date



Which of the following is NOT an acceptable method of communication between
the signal person and the crane operator?

Información del documento

Subido en
3 de agosto de 2025
Número de páginas
43
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$23.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Examinor
4.9
(530)
Vendido
8219
Seguidores
6
Artículos
3298
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes