• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

Dbia Practice Test 2025/2026 Questions With Answers Graded A+

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Vista previa del contenido

DBIA PRACTICE TEST 2025/2026
QUESTIONS WITH ANSWERS GRADED A+



1. Project bvDelivery bvSystem: bvHow bvteam bvmembers bvare bvorganized,
bvestablishes bvwhen bvparties bvengage, bvdetermines bvroles bvof bvparties,
bvand bvdetermines bvsequence bvof bvdesign, bvprocurement, bvand
bvconstruction bv(db, bvcmar, bvdbb)
2. Procurement bvMethod: bvhow bvteam bvmembers bvare bvselected
bv(QBS, bvbest bvvalue, bvlow bvprice, bvsole bvsource)
3. contracting bvapproach: bvhow bvteam bvmembers bvare bvpaid bv(fp,
bvgmp, bvcost bvreimburse- bvment, bvtarget bvprice, bvunit bvprice)
4. Design-Bid-Build bv(DBB): bvlinear, bvsequential bvprocess, bvA/E
bvselected bvon bvqualifi- bvcations, bvGC bvselected bvon bvlow bvprice,
bvdesign bvis bvfully bvcompleted bvwithout bvinput bvfrom bvGC, bvA/E
bvacting bvin bvowner's bvinterests, bvwith bva bvhistorically bvstrong
bvbond, bvprocess bvis bvwell-established bvand bvunderstood
5. construction bvmanager bvat bvrisk: bvsimilar bvorg bvstructure bvto
bvDBB, bvconstruction bvman- bvager bvselected bvby bvQBS bvor bvbest bvvalue,
bvcontractor bvprovides bvprecon bvservices, bvnegotiated bvgmp bvcontracting
1/
bvg bvg



18

,bvapproach, bvopen bvbook bvestimating bvprocess, bvpotential bvto bvfast
bvtrack bvproject, bvconstruction bvcost bvdetermined bvbefore bvdesign
bvcompleted, bvpotential bvissues bvover bvwhat bvis bvreasonably bvinferable
bvfrom bvgmp bvdesign bvdocuments
6. Design-Build: bvThe bvowner bvcontracts bvwith bvone bventity bv(a
bvperson bvor bvfirm) bvto bvprovide bvboth bvdesign bvand bvconstruction
bvservices, bvdesigner bvand bvcontractor bvhave bva bvdirect bvcon- bvtractual
bvrelationship, bvselected bvby bvQBS bvor bvbest bvvalue, bvwide bvspectrum
bvof bvcontracting bvapproaches bvand bvorganizational bvstructures, bvsingle
bvpoint bvresponsibility, bvowner bvdoes bvnot bvmanage bvdesigner, bvowner
bvexposure bvto bvclaims bvis bvsignificantly bvreduced
7. engineer bvprocure bvconstruct bv(epc): bvsimilar bvto bvdesign bvbuild,
bvin bvindustrial bvand bvpower bvgeneration bvsectors, bvsystems bvand
bvperformance bvtesting bvare bvcentral bvto bvscope, bvcontractor bvwill
bvtypically bvperform bvengineering bvwith bvits bvin-house bvstaff, bvowner
bvhas bvneed bvfor bvsingle bvpoint bvresponsibility, bvcontracts bvinclude
bvplant bvand bvprocess bvperformance bvguarantees, bvcontract bvitems
bvinclude bvperformance bvand bvschedule bvliquidated bvdamages bvand
bvlimitations bvof bvliability
8. Multiple bvPrime bvContracting: bvowner bvcontracts bvwith bvmultiple
bvtrade bvcontractors, bvattributes bvare bvtypically bvsimilar bvto bvdbb,
bvowner's bvability bvto bvschedule bvand bvcoordinate bvthe bvwork
9. Integrated bvProject bvDelivery bv(IPD): bvmulti-party bvagreement bv- bvall
bvparties bvequal, bvQBS bvprocurement bvand bvtarget bvpricing bvcontract
bvapproach, bvprivate bvsector bvuse bv(limited bvat bvthis bvtime), bvkey:
bvowner's bvability bvto bvaccept bvrisk
10. public-private bvpartnership bv(p3): bvInstead bvof bvgovernment
bvbuilding bvand bvmain- bvtaining bvmajor bvinfrastructure bv(such bvas
bvhighway, bvwater bvtreatment bvplant), bvbuild bvand bvmaintenance bvis
bvoutsourced bvto bva bvprivate bvcompany. bvOpposed bvby bvpublic bvsector
bvunions. bvthis bvis bvnot bvconsidered bva bvdelivery bvsystem bvbut bvits
bvunderlying bvapproaches bvare bvdelivery bvsystems bvand bvtypically bvuse
bvDB. bvmultiple bvprocurement bvand bvcontracting bvapproaches



2/
bvg bvg



18

, 11. shift left: intense efforts to establish scope early in the process; drives early
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




team formation to include key trade subcontractors;can enable big decisions to be
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




made early, affect project outcomes at lowest cost, establish a need for co-location
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




and collaboration, and compress time during concurrent design and construction
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




12. traditional designbuild: typicallytwo-phasebestvalueprocurementwithlump b
vg b
vg b
vg b
g
v b
g
v b
g
v bg
v bvg bg
v




sum contract; owner defines project requirements and scope of prescriptive work;
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




use of performance-based technical requirements with limited prescriptive specifi-
bvg bvg bvg bvg bvg bvg bvg bvg bvg




cations
bvg




13. progressive design build: design and price are progressively developed after bvg bvg b
vg bvg bvg bvg bvg bvg bvg




the design-builder is under contract;final project cost and schedule commitment is
bvg bvg bvg bvg bvg bg
v bvg bvg bvg bvg bvg bvg




not established as part of the selection process; two phases: preliminary services
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




and final design and construction services
bvg bvg bvg bvg bvg bvg




14. criteria documents: describe the end result bvg bvg bvg bvg bvg




15. bridging documents: prescribes how to achieve the end result bvg bvg bvg bvg bvg bvg bvg bvg




16. design bid build paradigm: prior to bidding, owner undertakes a process to bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




design the project and all of its details to 100% complete plans and specs. the
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




owner is therefore responsible for success or failure of details of the design, and
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




warrantsthesufficiencyofdesigntothecontractor.theowneristhereforeliabletothe
bvg b
g
v b
g
v b
g
v b
g
v b
g
v b
g
v b
g
v b
g
v b
g
v b
vg b
g
v b
g
v b
g
v b
g
v




contractorforanygapsbetweenplansandspecificationsandowner'srequirements for
bvg bvg b
g
v b
g
v b
g
v bvg bg
v bvg bg
v bvg b
g
v bvg




project performance
bvg bvg




17. design details responsibility: the owner should define its performance re- bvg bvg bvg bvg bvg bvg bvg bvg bvg




quirements and award the contract on the basis of preliminary design; this makes
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




the design-builder responsible for completing the design in accordance with the
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




owner's performance requirements.that also causes the design-builder to warrant
bvg bvg bvg b
g
v bvg bvg bvg bvg bvg bvg




the sufficiency of the design to meet the owner's criteria and the sufficiency of the
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




design to subcontractors/suppliers that have no design responsibility
bvg bvg bvg bvg bvg bvg bvg bvg




18. uniformat: subdivides project by functional elements, focuses on systems and bvg bvg bvg bvg bvg bvg bvg bvg bvg




assemblies, useful for preliminary information and early design phases, aligns with
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




BIM models and conceptual estimating
bvg bvg bvg bvg bvg




19. masterformat: subdivides work by results/trades, focuses on building materials, bvg bvg bvg bvg bvg bvg bvg bvg




products, and activities, useful for detailed information during final design and
bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg bvg




construction phases, and aligns with detailed estimating
bvg bvg bvg bvg bvg bvg bvg




3/
bvg bvg



18

Información del documento

Subido en
19 de julio de 2025
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$16.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectpotter
4.8
(186)
Vendido
138
Seguidores
9
Artículos
2616
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes