Samenvatting van het boek Implementing The Virtual Project Management Office, geschreven door M. Goncalves. De samenvatting is van de 1e druk van het boek, ISBN 9780071459181. Het uittreksel van Implementing The Virtual Project Management Office is geschreven door uitgever StudentsOnly en volledig inhoudelijk gecheckt.

Mostrar más Leer menos
Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

¿Un libro?
Subido en
13 de mayo de 2014
Número de páginas
25
Escrito en
2011/2012
Tipo
Resumen

Temas

Vista previa del contenido

Implementing The Virtual
Project Management Office




Bronvermelding
Titel : Implementing The Virtual Project Management
Office
Druk : 1
Auteur : M. Goncalves
Uitgever : McGraw-Hill
ISBN (boek) : 9780071459181

Aantal hoofdstukken (boek) : 10
Aantal pagina’s (boek) : 312



De inhoud van dit uittreksel is met de grootste zorg samengesteld. Incidentele onjuistheden kunnen niettemin voorkomen.
Je dient niet aan te nemen dat de informatie die Students Only B.V. biedt foutloos is, hoewel Students Only B.V. dat wel
nastreeft. Dit uittreksel is voor persoonlijk gebruik en is bedoeld als wegwijzer bij het originele boek. Wij raden aan altijd
het bijbehorende studieboek te kopen en dit uittreksel als naslagwerk erbij te houden. In dit uittreksel staan diverse
verwijzingen naar het studieboek op basis waarvan dit uittreksel is gemaakt.

Dit uittreksel is een uitgave van Students Only B.V. Copyright © 2011 StudentsOnly B.V. Alle rechten
voorbehouden. De uitgever van het studieboek is op generlei wijze betrokken bij het vervaardigen van dit
uittreksel. Voor vragen kun je je per email wenden tot .

,Inhoudsopgave

Hoofdstuk 1 A Business Case for a PMO 3

Hoofdstuk 2 Introduction to the PMO and its Requirements 6

Hoofdstuk 3 ePMO Versus Conventional PMO 8

Hoofdstuk 4 The Virtual Project Management Office: An Overview 10

Hoofdstuk 5 Developing an ePMO 12

Hoofdstuk 6 Developing the ePMO Business Processes 14

Hoofdstuk 7 Information Systems for ePMO Excellence 15

Hoofdstuk 8 Methodology and the Organizational Culture 17

Hoofdstuk 9 ePMO and PMI’s OPM3 20

Hoofdstuk 10 Developing Standards and Methods 23




www.studentsonly.nl Voor de beste uittreksels! 2
Bron : Implementing The Virtual Project Management Office - M. Goncalves

, Hoofdstuk 1 A Business Case for a PMO
The entire process of implementing a Project Management Organization (PMO) extends
beyond the tasks. By building a database of project information over long periods, it is
possible for an organization to move up towards Capability Maturity Model (CMM)
requirements. Further, such historic data would be an effective tool in feasibility studies and
risk assessments.

1.1 The PMO as a Knowledge Management System
Since 1996, The World Bank has been striving to become “Knowledge” bank. Efforts were
being taken in the form of evolving global repositories and benchmarking with companies and
consultants to achieve this. The organization had Knowledge Management (KM) as part of
its strategic plan and defined how it applied to its own projects. The expenses on KM efforts
of World Bank were over 5% as compared to 2% in today’s scenario. As part of the
knowledge transfer to its employees, mandatory training was given for two weeks in a year.
Expert groups were formed such that half its employee strength participated in at least in one,
which produced excellent results.
Though many organizations achieved success, the KM system was different in each case.
Many companies require systems that filter the methods and documents that are in existence
and collate them in a presentable manner.

1.2 Gathering Knowledge
IT implementations do not guarantee knowledge transfer and strategic actions. One of the
main issues facing KM is to attend to cultural shifts. The objective of a powerful PMO/KM
system is to achieve improvement in operational efficiency by providing adequate data and
reducing chances of risks.

1.3 Enabling Effective Risk Assessment and Mitigation
Identifying potential risks and failures in a project provides a strong base. Data on such risks
can be built into a project repository, so that success rates are improved. The process of risk
assessment involves identification of areas of highly uncertain situations and worst
constraints.
The important element in a project is that of meeting user-requirements. Credits: page 6;
chapter 1; Implementing Virtual Project Management; Marcus Goncalves.

1.4 Proliferation of International Projects
Since the projects are distributed globally, a project manager has to virtually review each
instead of physically walking around. The importance of electronic/Virtual Project
management Organization (ePMO/VPMO) is felt here, which has the same concepts as any
other PMO. Credits: page 8; chapter 1; Implementing Virtual Project Management; Marcus
Goncalves.

1.5 Worldwide Partnerships
As part of globalization efforts, many countries are shifting manufacturing facilities to reap
the benefits of cheap labor costs, tax laws and skilled professionals. A survey by Project
Management Institute (PMI) observes that 168% cost overruns are suffered and just 22% of
them are completed on time within the budget. The main problem lies in not maintaining
project records and negligence towards analysis of project metrics. ISO 9000 certification
system emerged to cope with such problems in all areas of business, across various industry
groups.

www.studentsonly.nl Voor de beste uittreksels! 3
Bron : Implementing The Virtual Project Management Office - M. Goncalves
$4.32
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StudentsOnly Boom Uitgeverij
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
18502
Miembro desde
14 año
Número de seguidores
14075
Documentos
802
Última venta
16 horas hace

3.6

3154 reseñas

5
622
4
1373
3
784
2
178
1
197

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes