• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 11 páginas
Examen

E&S Certification Questions And Answers

Document preview thumbnail
Vista previa 2 fuera de 11 páginas

E&S CERTIFICATION QUESTIONS AND ANSWERS

Vista previa del contenido

E&S CERTIFICATION QUESTIONS AND ANSWERS
Although 2/3's of earth's surface is water, what percentage is fresh water? - Answers -
3%

What percentage of Maryland residents household water comes from a surface water
source? - Answers - 68%

Clean water provides: - Answers - *Critical wildlife habitat
*an important part of Maryland's economy
*enhances recreational opportunities

The average Marylander uses how many gallons of water per day? - Answers - 100
gallons

Maryland's healthy water resources can benefit the economy by providing - Answers -
*Water for crop irrigation
*Water for livestock watering
*Electrical power generation
*Good quality fish and shellfish harvests

Natural erosion can be caused by - Answers - *Water
*Ice
*Wind
*Gravity

T or F: Raindrops can strike the soil surface at a velocity of 25-30 ft per second -
Answers - True

Sediment pollution is harmful because it: - Answers - *Silts in streams, lakes, ponds,
rivers, and the Chesapeake Bay
*Increases turbidity in water which can kill submerged aquatic vegetation
*Threatens public safety and may increase flooding
*Carries over abundant nutrients into waterways

Sediment runoff to a waterway can result in eutrophication due to - Answers -
Excessive algae growth as a result of increased level of nutrients which enter water
bodies attached to soil particles causing depletion of oxygen

The purpose of requiring erosion and sediment control is to - Answers - Provide a
means for land development while protecting the environment

Land development often accelerates the erosion process because - Answers -
*Construction can cause soils to become compacted, inhibiting the absorption of rainfall
*Drainage areas are often enlarged during construction, leading to increased runoff
velocities

, *Vegetation, which helps to diffuse the force of raindrops, is removed

T or F: A Maryland Department of the Environment (MDE) approved inspection report
must be used when conducting self-inspection under the National Pollutant Discharge
Elimination System (NPDES) General Stormwater Permit for Construction Activity. -
Answers - True

What year did State law mandate that all counties and municipalities in Maryland
establish an erosion and sediment control? - Answers - 1970

Compliance with the NPDES General Permit for Stormwater Associated with
Construction Activity (which an Notice of Intent or NOI is submitted) requires the
inspection and documentation of erosion and sediment controls: - Answers - Weekly
and the next day after a rain event that produces runoff

A NOI (Notice of Intent) must be submitted and coverage obtained under the NPDES
General Permit for Construction Activity for any construction site that disturbs: -
Answers - 5 acres or more

If working on a construction site in Allegany County the agency with enforcement
authority to conduct erosion and sediment controls inspections would be: - Answers -
MDE (Maryland Department of Environment)

Areas of Special Concern with respect to an erosion and sediment control plan include:
- Answers - *Wetlands and streams
*Highly erodible soils
*Steep slopes

The following type of enforcement action could result from violations of erosion and
sediment control requirements: - Answers - *Administrative penalty
*Criminal penalty
*Stop work order
*Civil Penalty

T or F: Perimeter controls must be installed before mass grading commences. -
Answers - True

All erosion and sediment control devices must be - Answers - *Built according to
approved design
*Stabilized
*Inspected and approved

In general, an approved erosion and sediment control plan is valid for - Answers - 2
years

Información del documento

Subido en
14 de julio de 2025
Número de páginas
11
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Greaterheights
4.0
(224)
Vendido
1175
Seguidores
882
Artículos
20900
Última venta
4 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes